# SUNOCO PIPELINE L.P. — Corrective Action Order

- **operation:** document
- **citation:** CPF 320125002H
- **title:** SUNOCO PIPELINE L.P. — Corrective Action Order
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2012-01-18
- **effective on:** Not available
- **summary:** CLOSED corrective action order.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-320125002h.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-320125002h.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-320125002h
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/320125002H
**body:**

Corrective Action Order involving SUNOCO PIPELINE L.P.. The dataset does not identify a cited regulation for this case. The case was opened on 2012-01-18 and is reported as closed as of 2016-11-04. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

320125002H_CAO_01182012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320125002H/320125002H_CAO_01182012.pdf

320125002H_CAO_01182012_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320125002H/320125002H_CAO_01182012_text.pdf

320125002H_Closure Letter_11042016.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320125002H/320125002H_Closure%20Letter_11042016.pdf

320125002H_Closure Letter_11042016_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320125002H/320125002H_Closure%20Letter_11042016_text.pdf

320125002H_Closure Letter_11042016_text.pdf

CERTIFIED MAIL - RETURN RECEIPT REQUESTED
November 4, 2016
Mr. David R. Chalson
Sr. Vice President, Operations
Sunoco Pipeline L.P.
4041 Market Street
Aston, PA 19014
CPF 3-2012-5002H
Dear Mr. Chalson:
On January 18, 2012, the Pipeline and Hazardous Materials Safety Administration (PHMSA)
issued to Sunoco Pipeline L.P. a Corrective Action Order (CAO) in the above-referenced case.
This Order included required actions to be taken on and along your pipeline. Based on our
review of the documentation you provided, it has been determined that you have complied with
the terms of this Order.
Accordingly, this case is now closed. Thank you for your cooperation in this matter.
Sincerely,
Allan C. Beshore
Director, Central Region
Pipeline and Hazardous Materials Safety Administration
cc: Mr. Michael Hennigan
President Sunoco Pipeline, L.P.
1818 Market Street, Suite 1500
Philadelphia, PA 19103