{"operation":"document","citation":"CPF 320125009M","title":"MARATHON PIPE LINE LLC — Notice of Amendment","source_type":"enforcement","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2012-04-26","effective_on":null,"summary":"CLOSED notice of amendment citing 195.402(a), 195.402(c)(3).","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-enforcement-320125009m.json","markdown":"https://regulus.evalyn.ai/document/phmsa-enforcement-320125009m.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-enforcement-320125009m","source_url":"https://primis.phmsa.dot.gov/enforcement-data/case/320125009M","body":"Notice of Amendment involving MARATHON PIPE LINE LLC. PHMSA's enforcement data identifies the cited regulations as 195.402(a),  195.402(c)(3). The case was opened on 2012-04-26 and is reported as closed as of 2013-06-12. Open the official case record for notices, responses, orders, and the latest status.\n\nOfficial case documents:\n\n320125009M_Closure_06122013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320125009M/320125009M_Closure_06122013.pdf\n\n320125009M_Closure_06122013_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320125009M/320125009M_Closure_06122013_text.pdf\n\n320125009M_NOA_04262012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320125009M/320125009M_NOA_04262012.pdf\n\n320125009M_NOA_04262012_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320125009M/320125009M_NOA_04262012_text.pdf\n\n320125009M_Operator Response to NOA_07262012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320125009M/320125009M_Operator%20Response%20to%20NOA_07262012.pdf\n\n320125009M_Closure_06122013_text.pdf\n\nCERTIFIED MAIL - RETURN RECEIPT REQUESTED\nJune 12, 2013\nMr. Shawn M. Lyon\nVice President of Operations\nMarathon Pipe Line LLC\n539 South Main Street\nFindlay, Ohio 45840\nCPF 3-2012-5009M\nDear Mr. Pierson:\nDuring the months of July through December 2010, a representative of the Pipeline and\nHazardous Materials Safety Administration (PHMSA) pursuant to Chapter 601 of 49\nUnited States Code inspected your Marathon Pipeline (Marathon) products facilities in the\nOhio area. As a result of the inspection, Marathon was issued a Notice of Amendment on\nApril 26, 2012, which proposed amendment of your procedures.\nMarathon submitted its amended procedures on July 26, 2012, and a subsequent submittal\non October 5, 2012. My staff reviewed the amended procedures, and it appears that the\ninadequacies outlined in this Notice of Amendment have been corrected.\nThis letter is to inform you no further action is necessary and this case is now closed.\nThank you for your cooperation.\nSincerely,\nDavid Barrett\nDirector, Central Region\nPipeline and Hazardous Materials Safety Administration","truncated":false,"body_characters":2131}