# MARATHON PIPE LINE LLC — Notice of Amendment

- **operation:** document
- **citation:** CPF 320125009M
- **title:** MARATHON PIPE LINE LLC — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2012-04-26
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 195.402(a), 195.402(c)(3).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-320125009m.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-320125009m.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-320125009m
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/320125009M
**body:**

Notice of Amendment involving MARATHON PIPE LINE LLC. PHMSA's enforcement data identifies the cited regulations as 195.402(a),  195.402(c)(3). The case was opened on 2012-04-26 and is reported as closed as of 2013-06-12. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

320125009M_Closure_06122013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320125009M/320125009M_Closure_06122013.pdf

320125009M_Closure_06122013_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320125009M/320125009M_Closure_06122013_text.pdf

320125009M_NOA_04262012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320125009M/320125009M_NOA_04262012.pdf

320125009M_NOA_04262012_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320125009M/320125009M_NOA_04262012_text.pdf

320125009M_Operator Response to NOA_07262012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320125009M/320125009M_Operator%20Response%20to%20NOA_07262012.pdf

320125009M_Closure_06122013_text.pdf

CERTIFIED MAIL - RETURN RECEIPT REQUESTED
June 12, 2013
Mr. Shawn M. Lyon
Vice President of Operations
Marathon Pipe Line LLC
539 South Main Street
Findlay, Ohio 45840
CPF 3-2012-5009M
Dear Mr. Pierson:
During the months of July through December 2010, a representative of the Pipeline and
Hazardous Materials Safety Administration (PHMSA) pursuant to Chapter 601 of 49
United States Code inspected your Marathon Pipeline (Marathon) products facilities in the
Ohio area. As a result of the inspection, Marathon was issued a Notice of Amendment on
April 26, 2012, which proposed amendment of your procedures.
Marathon submitted its amended procedures on July 26, 2012, and a subsequent submittal
on October 5, 2012. My staff reviewed the amended procedures, and it appears that the
inadequacies outlined in this Notice of Amendment have been corrected.
This letter is to inform you no further action is necessary and this case is now closed.
Thank you for your cooperation.
Sincerely,
David Barrett
Director, Central Region
Pipeline and Hazardous Materials Safety Administration
- **truncated:** false
- **body characters:** 2131