{"operation":"document","citation":"CPF 320125026M","title":"WOLVERINE PIPELINE CO — Notice of Amendment","source_type":"enforcement","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2012-11-27","effective_on":null,"summary":"CLOSED notice of amendment citing 195.402(d)(2), 195.402(d)(5), 195.571.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-enforcement-320125026m.json","markdown":"https://regulus.evalyn.ai/document/phmsa-enforcement-320125026m.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-enforcement-320125026m","source_url":"https://primis.phmsa.dot.gov/enforcement-data/case/320125026M","body":"Notice of Amendment involving WOLVERINE PIPELINE CO. PHMSA's enforcement data identifies the cited regulations as 195.402(d)(2),  195.402(d)(5),  195.571. The case was opened on 2012-11-27 and is reported as closed as of 2013-02-04. Open the official case record for notices, responses, orders, and the latest status.\n\nOfficial case documents:\n\n320125026M_Closure_02042013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320125026M/320125026M_Closure_02042013.pdf\n\n320125026M_Closure_02042013_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320125026M/320125026M_Closure_02042013_text.pdf\n\n320125026M_Operator Response to NOA_12192012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320125026M/320125026M_Operator%20Response%20to%20NOA_12192012.pdf\n\n320125026M_Closure_02042013_text.pdf\n\nCERTIFIED MAIL - RETURN RECEIPT REQUESTED\nFebruary 4, 2013\nMr. John Gurrola\nVP and Manager\nWolverine Pipe Line Company\n8075 Creekside Dr. Suite 210\nPortage, MI 49024-6303\nCPF 3-2012-5026M\nDear Mr. Gurrola:\nOn October 24-26, 2011, a representative from the Pipeline and Hazardous Materials Safety\nAdministration (PHMSA), pursuant to chapter 601 of 49 United States Code, conducted an on-\nsite pipeline safety inspection of Wolverine Pipe Line Company’s procedures in Portage,\nWisconsin. As a result of the inspection, Wolverine Pipe Line Company was issued a Notice of\nAmendment on November 27, 2012, which proposed amendment of your procedures.\nWolverine Pipe Line Company submitted its amended procedures on December 19, 2012. My\nstaff reviewed the amended procedures, and it appears that the inadequacies outlined in this\nNotice of Amendment have been corrected.\nThis letter is to inform you no further action is necessary and this case is now closed. Thank you\nfor your cooperation.\nSincerely,\nDavid Barrett\nDirector, Central Region\nPipeline and Hazardous Materials Safety Administration","truncated":false,"body_characters":1907}