{"operation":"document","citation":"CPF 320135016M","title":"MARATHON PIPE LINE LLC — Notice of Amendment","source_type":"enforcement","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2013-06-18","effective_on":null,"summary":"CLOSED notice of amendment citing 195.440(c), 195.440(d), 195.440(e), 195.440(f), 195.440(g).","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-enforcement-320135016m.json","markdown":"https://regulus.evalyn.ai/document/phmsa-enforcement-320135016m.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-enforcement-320135016m","source_url":"https://primis.phmsa.dot.gov/enforcement-data/case/320135016M","body":"Notice of Amendment involving MARATHON PIPE LINE LLC. PHMSA's enforcement data identifies the cited regulations as 195.440(c),  195.440(d),  195.440(e),  195.440(f),  195.440(g). The case was opened on 2013-06-18 and is reported as closed as of 2015-12-16. Open the official case record for notices, responses, orders, and the latest status.\n\nOfficial case documents:\n\n320135016M_Closure Letter_12162015.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320135016M/320135016M_Closure%20Letter_12162015.pdf\n\n320135016M_Closure Letter_12162015_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320135016M/320135016M_Closure%20Letter_12162015_text.pdf\n\n320135016M_NOA_06182013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320135016M/320135016M_NOA_06182013.pdf\n\n320135016M_NOA_06182013_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320135016M/320135016M_NOA_06182013_text.pdf\n\n320135016M_Operator Response to NOA_09172013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320135016M/320135016M_Operator%20Response%20to%20NOA_09172013.pdf\n\n320135016M_Closure Letter_12162015_text.pdf\n\nCERTIFIED MAIL - RETURN RECEIPT REQUESTED\nDecember 16, 2015\nMr. Shawn Lyon\nVice President, Operations\nMarathon Pipe Line, LLC\n539 South Main Street, Room 704M\nFindlay, Ohio 45840\nRe: CPF 3-2013-5016M\nDear Mr. Lyon:\nOn October 25, 2011, a representative from the Pipeline and Hazardous Materials Safety\nAdministration (PHMSA), pursuant to chapter 601 of 49 United States Code inspected\nMarathon Pipe Line’s procedures for Public Awareness Program Effectiveness in Findlay,\nOhio. As a result of the inspection, Marathon Pipe Line LLC was issued a Notice of\nAmendment on June 18, 2013, which proposed amendment of your procedures.\nMarathon Pipe Line LLC submitted its revisions and its amended procedures on July 30,\n2013. My staff reviewed the amended procedures, and it appears that the inadequacies\noutlined in this Notice of Amendment have been corrected.\nThis letter is to inform you no further action is necessary and this case is now closed.\nThank you for your cooperation.\nSincerely,\nAllan C. Beshore\nDirector, Central Region, OPS\nPipeline and Hazardous Materials Safety Administration","truncated":false,"body_characters":2220}