# TESORO HIGH PLAINS PIPELINE COMPANY LLC — Safety Order

- **operation:** document
- **citation:** CPF 320135032S
- **title:** TESORO HIGH PLAINS PIPELINE COMPANY LLC — Safety Order
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2013-10-31
- **effective on:** Not available
- **summary:** CLOSED safety order.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-320135032s.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-320135032s.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-320135032s
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/320135032S
**body:**

Safety Order involving TESORO HIGH PLAINS PIPELINE COMPANY LLC. The dataset does not identify a cited regulation for this case. The case was opened on 2013-10-31 and is reported as closed as of 2016-03-24. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

320135032S_Closure Letter_03242016.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320135032S/320135032S_Closure%20Letter_03242016.pdf

320135032S_Closure Letter_03242016_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320135032S/320135032S_Closure%20Letter_03242016_text.pdf

320135032S_NOPSO_10302013_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320135032S/320135032S_NOPSO_10302013_text.pdf

320135032S_NOPSO_10312013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320135032S/320135032S_NOPSO_10312013.pdf

320135032S_Safety Order_10312013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320135032S/320135032S_Safety%20Order_10312013.pdf

320135032S_Safety Order_10312013_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320135032S/320135032S_Safety%20Order_10312013_text.pdf

320135032S_Closure Letter_03242016_text.pdf

CERTIFIED MAIL - RETURN RECEIPT REQUESTED
March 24, 2016
Mr. Don Sorensen
Senior Vice-President, Logistics
Tesoro High Plains Pipeline Company, LLC
19100 Ridgewood Parkway
San Antonio, Texas 78259
CPF 3-2013-5032S
Dear Mr. Sorensen:
On October 31, 2013, the Pipeline and Hazardous Materials Safety Administration
(PHMSA) issued to Tesoro High Plains Pipeline Company, LLC a Safety Order in the
above-referenced case. This Order included required actions to be taken on and along your
pipeline. Based on our review of the documentation you provided, it has been determined
that you have complied with the terms of this Order.
Accordingly, this case is now closed. Thank you for your cooperation in this matter.
Sincerely,
Allan C. Beshore
Director, Central Region, OPS
Pipeline and Hazardous Materials Safety Administration

320135032S_Safety Order_10312013_text.pdf

TRANSMITTED VIA EMAIL &
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
Mr. Rick D. Weyen, Vice President, Logistics
Tesoro High Plains Pipeline Company LLC
19100 Ridgewood Parkway
San Antonio, Texas 78259
RE: CPF 3-2013-5032S
Dear Mr. Weyen:
Enclosed please find the Safety Order issued in the above-referenced case. It makes a finding
that Tesoro High Plains Pipeline Company LLC's pipeline system has a condition or conditions
that pose a pipeline integrity risk and specifies actions that must be taken by THPP to ensure
that the public, property, and the environment are protected from the risk. When the terms of
the order have been completed, as determined by the Director, Central Region, this
enforcement action will be closed. Your receipt of the Safety Order constitutes service of the
document as provided under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
___________________________
Jeffrey D. Wiese
Associate Administrator
for Pipeline Safety
Enclosure: Safety Order
cc: Ms. Linda Daugherty, Director, Central Region, PHMSA
Mr. Greg Henderson, Vice President, Mid-Continent Operations



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
__________________________________________
In the Matter of )
)
)
Tesoro High Plains Pipeline Company, LLC )
Respondent )
__________________________________________)
) CPF No. 3-2013-5032S
SAFETY ORDER
Pursuant to 49 U.S.C. § 60117, the Pipeline and Hazardous Materials Safety Administration
(PHMSA), Office of Pipeline Safety (OPS), conducted an investigation of the safety of Tesoro
High Plains Pipeline Company, LLC’s (THPP or Respondent) pipeline system, including an
accident that was discovered on September 29, 2013. THPP operates the Tesoro High Plains
System (THPP System), which consists of approximately 700 miles of mainline and gathering
pipelines, both regulated and unregulated.
As a result of the investigation, the Director, Central Region, OPS (Director), issued to
Respondent, by letter dated October 31, 2013, a Notice of Proposed Safety Order (Notice). In
accordance with 49 C.F.R. § 190.239, the Notice proposed finding that conditions exist on the
pipeline system that pose a pipeline integrity risk to public safety, property or the environment,
and proposed that Respondent take certain measures to ensure that the public, property, and the
environment are protected from the potential risk.
THPP responded to the Notice by letter dated October 31, 2013. In its letter, Respondent did not
contest the Notice and expressed its intent to comply with its proposed terms, authorizing the
entry of this Safety Order. Respondent did not request a hearing, and therefore has waived its
right to one.
FINDINGS
Respondent did not contest the proposed findings in the Notice that THPP has a condition or
conditions that pose a pipeline integrity risk. Accordingly, pursuant to 49 U.S.C. § 60117(1) and
49 C.F.R. § 190.239, I find as follows:
• The THPP System includes different segments with the mainline extending from
Stampede to Mandan, North Dakota, and a western gathering loop which extends into
Montana. This Safety Order applies to the regulated portions of the THPP System.



• THPP’s Tioga to Black Slough 35 mile line segment (hereinafter referred to as the
“Line”) is part of an interstate crude oil system that transports crude oil from local
crude production in North Dakota.
• On September 29, 2013, at approximately 10:35 p.m. local time, a failure was
discovered on the Line eight miles north of Tioga, North Dakota (reported specific GPS
location is Latitude N48 31.45, and Longitude W102 51.42). A farmer in the area,
while harvesting his crops, noticed oil seeping from the ground. It is a rural location
with no surface waters in the vicinity.
• The failure was reported to the National Response Center (NRC) on September 30,
2013 at 1:16 a.m. (NRC Report Number 1061615) EDT. PHMSA initiated an
investigation of the accident, which involved an on-site investigation at the failure
location and a review of control room operations, in San Antonio, Texas.
• The pipeline section on which the failure occurred is a six-inch pipeline that was
installed in 1993. It was manufactured by IPSCO with a 0.219 wall, ERW, X42, and
has Pri-tec coating. The failed pipe joint has since been removed and sent for
mechanical and metallurgical testing. A preliminary report has been provided to
PHMSA.
• THPP performed an inline inspection (ILI) of the Line on September 10-11, 2013. The
ILI identified a metal loss anomaly 76% deep, 0.590” long by 0.579” wide, which
corresponds with the leak site. The anomaly was reported to Tesoro subsequent to
discovery of the leak.
• The Line was carrying crude oil from the Bakken field area at the time of the leak.
THPP identified that the Maximum Operating Pressure (MOP) of the Line was 1390
psig at the location of the failure. The operating pressure at the failure location was
approximately 350 psig at the time of the reported release.
• A leak clamp was installed on September 30, 2013, once the leak source was discovered.
Based on the impacted area of the release, the estimated spill volume is about 20,000
barrels of crude oil as reported by THPP in NRC Report Number 1062440 on October
8, 2013.
• A preliminary mechanical and metallurgical analysis report has been provided. The
preliminary report points to a strong electrical discharge as the cause of the failure, but
a final determination as to the exact cause has not been made.



Completed Corrective Measures
Through coordination with PHMSA, THPP has:
1. Removed the failed pipe joint, and sent it to a third party laboratory for mechanical and
metallurgical analysis per PHMSA protocols.
2. Submitted a repair plan for PHMSA approval.
3. Received and provided the preliminary mechanical and metallurgical analysis report.
4. Removed approximately 1200 feet of existing 6 inch pipeline.
5. Installed and rerouted approximately 1500 feet of new 6 inch, 0.281 wall, seamless, FBE
coated pipeline.
6. Submitted a restart plan for PHMSA approval.
7. Notified local and State emergency responders and officials of its potential restart
actions.
8. Installed and made operational leak detection equipment, to be compliant with API 1130,
for the Tioga to Stampede segment.
9. Started a close interval survey on the Line.
10. Filled the pipeline and performed a tightness test.
11. Added high-high alarms on pressure and flow on available instrumentation.
12. Modified controller screen displays to reflect the new leak detection equipment.
13. Performed controller training as necessary for the new system modifications.
14. Reviewed pressure history from various points on the THPP system.
15. Reviewed shift reports, In-Line-Inspection (ILI) data, communication outage and weather
data.
16. Started a root cause failure analysis, facilitated and supported by an independent third
party.
17. Performed additional integrity testing on the system, including dynamic flow balance
tests, and static pressure tests.



18. Performed acoustic leak testing on portions of the mainline system, including both
crossings at Lake Sakakawea.
ISSUANCE OF SAFETY ORDER
Section 60117(1) of Title 49, United States Code, provides for the issuance of a safety order,
after reasonable notice and the opportunity for a hearing, requiring corrective measures, which
may include physical inspection, testing, repair, or other action, as appropriate. The basis for
making the determination that a pipeline facility has a condition or conditions that pose a
pipeline integrity risk to public safety, property, or the environment is set forth both in the above
referenced statute and 49 C.F.R. §190.239.
After evaluating the foregoing findings and considering the age of the pipe involved, the
manufacturer, the hazardous nature of the product transported and the pressure required for
transporting such product, the characteristics of the geographical areas where the pipeline is
located, and the likelihood that the conditions could develop on other areas of the pipeline and
potentially impact its serviceability, PHMSA finds that Respondent's THPP Pipeline has a
condition or conditions that pose a pipeline integrity risk to public safety, property, or the
environment. Accordingly, PHMSA issues this Safety Order, which requires that Respondent
take measures specified below to address the risk.
Corrective Measures
Pursuant to 49 U.S.C. § 60117(l) and 49 C.F.R. § 190.239, THPP must take the following
remedial requirements:
1. Provide for adequate aerial patrol of the pipeline during the restart process and first 72
hours thereafter. After this time, provide weekly aerial patrols for 1 year, weather and
safety conditions permitting.
Implement ground patrols for Tioga to Black Slough pipeline segment on a daily basis
the first 3 days following restart, and on a weekly basis thereafter, weather and safety
conditions permitting, for 30 days after restart or until leak detection equipment has
established final thresholds.
Improve process and associated documentation to ensure adequate communication of
changes with the control room regarding operation, construction, or maintenance
activities.
Install and implement leak detection equipment compliant with 49 CFR §195.444 and
195.134 according to API 1130 requirements for all remaining THPP system (all
regulated pipelines). Installation of devices should be completed within 12 months in
accordance with a risk based schedule provided to PHMSA.
2. 3. 4.



a. High priority for leak detection implementation shall be placed on areas
associated with Lake Sakakawea, Little Missouri River, Yellowstone River, and
other water crossings over 100 feet wide.
5. Within 90 days implement instrumentation maintenance and repair tracking system such
that all control room instruments remain functional and receive a high priority regarding
maintenance response.
6. Within 1 year, implement and/or provide adequate documentation of a tank monitoring
program that prevents and detects leaks on regulated tanks.
a. High priority shall be placed on those tanks of larger volume, located near rivers
or other water bodies, and unusually sensitive areas.
7. Within 6 months, update and distribute a mapping system such that map overlays for the
entire THPP System are available; identifying high consequence areas (HCA), could
affect HCA areas, water bodies, and all commodity receipt and delivery points.
8. Within 30 days, provide the final mechanical and metallurgical testing report of the failed
pipe.
9. Within 30 days, conduct an evaluation of previous in-line inspection (ILI) results, of the
THPP System where results are available to determine whether any features with similar
characteristics to the feature at the failure site are present elsewhere.
10. Within 6 months provide documentation of all enhanced Supervisory Control And Data
Acquisition (SCADA) and control room activities. This shall include but not be limited
to display reviews for consistency with API RP1165 application and added
instrumentation, point to point completed checkouts for leak detection and associated
instrumentation such as flow and pressure monitoring, low-low alarm pressure limits for
those points that do not operate in slack line condition, verification of the accuracy of all
points while running in reverse flow, pressure cycle monitoring, implementation of
“Pressmon” or similar application where possible, manual leak calculations to be
performed by controllers in the control room where possible and the impact to controller
training. Leak detection and monitoring system enhancements identified per this Safety
order must also be employed if the control room or monitoring location changes. A
change to control room monitoring or operation locations may not result in decreased
operations monitoring or leak detection performance. If third parties are utilized for
operations and monitoring control room activities, contracts shall be kept current and
performance of the third party periodically audited.
11. Within 90 days complete a root cause failure analysis for the Line that contains a detailed
timeline of events. A detailed review associated with the timeline development must
include, but not be limited to all information sources that could help identify the likely
date of the failure (shift logs, pressure and flow information, controller logs, maintenance
activities, communication outages, aerial patrols, ILI data runs, initial public



notifications, reversal, etc.). A review of any known failure history (in-service and
pressure test failures) should be included as part of the root cause failure analysis. In
addition, any lessons learned must be identified and reviewed for applicability to other
locations within the THPP System. The report should provide a specific summary
regarding whether or not the controllers had adequate information to recognize an
abnormal operating condition. If adequate information did not exist to recognize these
conditions, identify enhancements for the SCADA activities that could provide the
necessary data and allow for controller recognition should this not be covered by other
items in the order.
12. Within 6 months, evaluate and implement, as appropriate, cathodic protection
improvements as identified by any previous reports.
13. Develop and implement a risk based plan for additional testing and surveys of the THPP
System to identify and mitigate potential coating, cathodic protection and interference
issues. Tesoro must show measurable progress and commitment to full implementation
on this multi-year plan before PHMSA will close out this action as acceptable. PHMSA
will monitor long term completion of this item as part of its normal safety inspection
program. This plan must be submitted to the Director for review and approval within 6
months.
14. Perform a detailed evaluation of the THPP System to identify potential preventative and
mitigative measures designed to minimize the consequence of spills near Lake
Sakakawea, Little Missouri River, Yellowstone River, and other water crossings over 100
feet wide. This must include a review of the existing and potential locations for
Emergency Flow Restricting Devices (EFRD) as a way to minimize the consequence of
spills to Lake Sakakawea, Little Missouri River, Yellowstone River, and other water
crossings over 100 feet wide. This evaluation must be submitted to the Director for
review and approval within 6 months.
15. The work identified in this Safety Order shall be referred to collectively as a “work plan”
which shall automatically be incorporated by reference into this order including any
amendments. The work plan must be revised as necessary to incorporate the results of
actions undertaken pursuant to the Order and whenever necessary to incorporate new
information obtained during the failure investigations and remedial activities.
16. Submit any proposed work plan revisions to the Director for prior approval. may approve, disapprove, approve with conditions, or approve elements of the plan
incrementally.
The Director
17. Implement the conditions of the Safety Order as approved by the Director. The results of
all actions taken in accordance with the approved plan must be available for review by
PHMSA or its representative.
18. Submit monthly reports to the Director on the status of individual Safety Order items.
The first monthly report is due on the 15th day of the month following receipt of the



Order. The regular intervals for submitting reports may be adjusted with prior approval
of the Director.
19. It is requested that THPP maintain documentation of the costs associated with
implementation of the Safety Order, and include in each report submitted pursuant to
Item 14, the to-date total costs associated with: (1) preparation and revision of
procedures, studies and analyses; (2) physical changes to pipeline infrastructure,
including repairs, replacements and other modifications; and (3) environmental
remediation, if applicable.
20. The Director may grant an extension of time for compliance with any of the terms of the
Safety Order upon a written request timely submitted demonstrating good cause for an
extension.
21. THPP may appeal any decision of the Director to the Associate Administrator for
Pipeline Safety. Decisions of the Associate Administrator are final.
In your correspondence on this matter, please refer to CPF No. 3-2013-5032S and for each
document you submit, please provide a copy in electronic format whenever possible.
Be advised that all material you submit in response to this enforcement action is subject to being
made publicly available. If you believe that any portion of your responsive material qualifies for
confidential treatment under 5 U.S.C. § 552(b), along with the complete original document you
must provide a secon0d copy of the document with the portions you believe qualify for
confidential treatment redacted and an explanation of why you believe the redacted information
qualifies for confidential treatment under 5 U.S.C. § 552(b).
The actions taken pursuant to this Safety Order are in addition to and do not waive any
requirements that apply to Respondent's pipeline system under 49 C.F.R. Parts 190 through 199,
under any other order issued to Respondent under authority of 49 U.S.C. Chapter 601, or under
any other provision of Federal or state law.
After receiving and analyzing additional data in the course of this proceeding and
implementation of the required tests and analysis, PHMSA may identify other safety measures
that need to be taken. In that event, Respondent will be notified of any proposed additional
measures and, if necessary, amendments to the Safety Order.
The terms and conditions of this Safety Order are effective upon service in accordance with 49
C.F.R. § 190.5.
____________________________ __________________
Jeffrey D. Wiese Date Issued
Associate Administrator
for Pipeline Safety
- **truncated:** false