{"operation":"document","citation":"CPF 320145004M","title":"BUCKEYE PARTNERS, LP — Notice of Amendment","source_type":"enforcement","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2014-03-28","effective_on":null,"summary":"CLOSED notice of amendment citing 195.505(h).","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-enforcement-320145004m.json","markdown":"https://regulus.evalyn.ai/document/phmsa-enforcement-320145004m.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-enforcement-320145004m","source_url":"https://primis.phmsa.dot.gov/enforcement-data/case/320145004M","body":"Notice of Amendment involving BUCKEYE PARTNERS, LP. PHMSA's enforcement data identifies the cited regulation as 195.505(h). The case was opened on 2014-03-28 and is reported as closed as of 2014-10-09. Open the official case record for notices, responses, orders, and the latest status.\n\nOfficial case documents:\n\n320145004M_Closure Letter_10092014.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320145004M/320145004M_Closure%20Letter_10092014.pdf\n\n320145004M_NOA_03282014.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320145004M/320145004M_NOA_03282014.pdf\n\n320145004M_NOA_03282014_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320145004M/320145004M_NOA_03282014_text.pdf\n\n320145004M_Operator Response to Notice_05052014.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320145004M/320145004M_Operator%20Response%20to%20Notice_05052014.pdf\n\n320145004M_Closure Letter_10092014.pdf\n\nU.S. Department\n901 Locust Street, Suite 462\nof Transportation\nKansas City, Missouri 64106-2641\nSafety Administration\nPipeline and Hazardous Materials\nCERTIFIED MAIL - RETURN RECEIPT REQUESTED\nOctober 9, 2014\nMr. Thomas S. (Scott) Collier\nVice President Performance Assurance and Asset Integrity\nBuckeye Partners, L.P.\nFive TEK Park\n9999 Hamilton Boulevard\nBreinigsville, Pennsylvania 18031\nCPF 3-2014-5004M\nDear Mr. Collier:\nconducted an investigation into the accident and reviewed Buckeye's Operator\nQualification Plan, Operations and Maintenance procedures and selected records. As a\nresult of the accident investigation, Buckeye was issued a Notice of Amendment on March\n28, 2014, which proposed amendment of your procedures.\nBuckeye submitted its amended procedures on June 5, 2014. My staff reviewed the\namended procedures, and it appears that the inadequacies outlined in this Notice of\nAmendment have been corrected.\nThis letter is to inform you no further action is necessary and this case is now closed.\nThank you for your cooperation.\nSincerely,\nCilia i Beline\nAllan C. Beshore\nDirector, Central Region\nPipeline and Hazardous Materials Safety Administration","truncated":false,"body_characters":2091}