{"operation":"document","citation":"CPF 320145006M","title":"CRESTWOOD DAKOTA PIPELINE LLC — Notice of Amendment","source_type":"enforcement","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2014-09-26","effective_on":null,"summary":"CLOSED notice of amendment citing 195.234(b)(2), 195.402(a), 195.402(c), 195.402(c)(1), 195.402(c)(10), 195.402(c)(5), 195.402(c)(9), 195.402(e), 195.403, 195.404(a)(2), 195.408(b), 195.422(a), 195.428(a), 195.428(d), 195.432(b), 195.436, 195.440(a), 195.440(b), 195.442(c)(1), 195.442(c)(3), 195.442(c)(4), 195.442(c)(6), 195.444, 195.52(c), 195.573(d), 195.573(e), 195.575(a), 195.575(b), 195.575(c), 195.577(b), 195.579(a), 195.579(b)(3), 195.581(a), 195.64(c)(1)(i), 195.64(c)(1)(ii), 195.64(c)(1)(iii), 195.64(c)(2)(iv), 195.64(c)(2)(v).","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-enforcement-320145006m.json","markdown":"https://regulus.evalyn.ai/document/phmsa-enforcement-320145006m.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-enforcement-320145006m","source_url":"https://primis.phmsa.dot.gov/enforcement-data/case/320145006M","body":"Notice of Amendment involving CRESTWOOD DAKOTA PIPELINE LLC. PHMSA's enforcement data identifies the cited regulations as 195.234(b)(2),  195.402(a),  195.402(c),  195.402(c)(1),  195.402(c)(10),  195.402(c)(5),  195.402(c)(9),  195.402(e),  195.403,  195.404(a)(2),  195.408(b),  195.422(a),  195.428(a),  195.428(d),  195.432(b),  195.436,  195.440(a),  195.440(b),  195.442(c)(1),  195.442(c)(3),  195.442(c)(4),  195.442(c)(6),  195.444,  195.52(c),  195.573(d),  195.573(e),  195.575(a),  195.575(b),  195.575(c),  195.577(b),  195.579(a),  195.579(b)(3),  195.581(a),  195.64(c)(1)(i),  195.64(c)(1)(ii),  195.64(c)(1)(iii),  195.64(c)(2)(iv),  195.64(c)(2)(v). The case was opened on 2014-09-26 and is reported as closed as of 2015-06-16. Open the official case record for notices, responses, orders, and the latest status.\n\nOfficial case documents:\n\n320145006M_Closure_06162015.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320145006M/320145006M_Closure_06162015.pdf\n\n320145006M_Closure_06162015_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320145006M/320145006M_Closure_06162015_text.pdf\n\n320145006M_NOA_09262014.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320145006M/320145006M_NOA_09262014.pdf\n\n320145006M_NOA_09262014_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320145006M/320145006M_NOA_09262014_text.pdf\n\n320145006M_Operator Response to Notice_12222014.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320145006M/320145006M_Operator%20Response%20to%20Notice_12222014.pdf\n\n320145006M_Closure_06162015_text.pdf\n\nCERTIFIED - RETURN RECEIPT REQUESTED\nJune 16, 2015\nMr. George Grau\nVice President, Operations Crude and NGL\nCrestwood Dakota Pipeline LLC\n801 Cherry Street\nSuite 3800 – Unit 20\nFort Worth, TX 76102\nCPF No. 3-2014-5006M\nDear Mr. Grau:\nOn October 28th – November 1, 2013, representatives of the Central Region office of the\nPipeline and Hazardous Materials Safety Administration (PHMSA) pursuant to Chapter 601 of\n49 United States Code inspected the operation and maintenance procedures for Crestwood\nDakota Pipeline LLC at your offices in Epping, ND.\nOn December 22, 2014, February 9, 2015, and May 13, 2015, we received your revised\nprocedures in response to the Notice of Amendment sent to you on September 26, 2014. The\namended Procedures have been reviewed and are acceptable.\nThis letter is to inform you that no further action is necessary and that this case is being\nclosed. Thank you for your cooperation in this matter.\nSincerely,\nAllan C. Beshore\nDirector, Central Region, OPS\nPipeline and Hazardous Materials Safety Administration","truncated":false,"body_characters":2626}