# NATURAL GAS PIPELINE CO OF AMERICA (KMI) — Warning Letter

- **operation:** document
- **citation:** CPF 320151006W
- **title:** NATURAL GAS PIPELINE CO OF AMERICA (KMI) — Warning Letter
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2015-05-20
- **effective on:** Not available
- **summary:** CLOSED warning letter citing 192.709(c).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-320151006w.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-320151006w.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-320151006w
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/320151006W
**body:**

Warning Letter involving NATURAL GAS PIPELINE CO OF AMERICA (KMI). PHMSA's enforcement data identifies the cited regulation as 192.709(c). The case was opened on 2015-05-20 and is reported as closed as of 2015-05-20. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

320151006W_Warning_05202015.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320151006W/320151006W_Warning_05202015.pdf

320151006W_Warning_05202015_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320151006W/320151006W_Warning_05202015_text.pdf

320151006W_Warning_05202015_text.pdf

WARNING LETTER
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
May 20, 2015
Mr. Tom Martin
President, Natural Gas Pipelines
Kinder Morgan, Inc.
1001 Louisiana Street, Suite 1000
Houston, Texas 77002
CPF 3-2015-1006W
Dear Mr. Martin:
On August 20-22 and November 5-7, 2013, representatives of the Pipeline and Hazardous
Materials Safety Administration (PHMSA), Office of Pipeline Safety (OPS), pursuant to
Chapter 601 of 49 United States Code inspected the implementation of your gas integrity
management program in Houston, Texas, and records and field operations in Joliet, Illinois,
respectively.
As a result of the inspection, it appears that you have committed a probable violation of the
Pipeline Safety Regulations, Title 49, Code of Federal Regulations. The item inspected and
the probable violation is:
§192.709(c) Transmission lines: Record keeping.
Each operator shall maintain the following records for transmission lines for
the periods specified:
(c) A record of each patrol, survey, inspection, and test required by subparts L
and M of this part must be retained for at least 5 years or until the next patrol,
survey, inspection, or test is completed, whichever is longer.



During the inspection of Natural Gas Pipeline of America, it was determined that set points
“as found” and “as left” were not documented for certain pressure limiting and regulating
stations inspections in 2011 and 2012. Specifically, inspection records reviewed revealed
that six (6) inspections did not list the “as left” pressure and four (4) inspections did not list
the “as found” or “as left” pressures.
During the inspection, it was also determined that partial operation of valves was not
documented in eighty-six (86) valve inspection records that occurred between 2010 and
2012.
Under 49 United States Code, §60122, you are subject to a civil penalty not to exceed
$200,000 per violation per day the violation persists up to a maximum of $2,000,000 for a
related series of violations. For violations occurring prior to January 4, 2012, the maximum
penalty may not exceed $100,000 per violation per day, with a maximum penalty not to
exceed $1,000,000 for a related series of violations. We have reviewed the circumstances
and supporting documents involved in this case, and have decided not to conduct additional
enforcement action or penalty assessment proceedings at this time. We advise you to
correct the item(s) identified in this letter. Failure to do so will result in Natural Gas
Pipeline of America being subject to additional enforcement action.
No reply to this letter is required. If you choose to reply, in your correspondence please
refer to CPF 3-2015-1006W. Be advised that all material you submit in response to this
enforcement action is subject to being made publicly available. If you believe that any
portion of your responsive material qualifies for confidential treatment under 5 U.S.C.
552(b), along with the complete original document you must provide a second copy of the
document with the portions you believe qualify for confidential treatment redacted and an
explanation of why you believe the redacted information qualifies for confidential treatment
under 5 U.S.C. 552(b).
Sincerely,
Allan C. Beshore
Director, Central Region OPS
Pipeline and Hazardous Materials Safety Administration
cc: Mr. Gary Buchler
Vice President Engineering/Operations
Natural Gas Pipeline Co of America (KMI)
1001 Louisiana Street
Houston, Texas 77002
- **truncated:** false