# WHITE CLIFFS PIPELINE, LLC — Notice of Amendment

- **operation:** document
- **citation:** CPF 320175003M
- **title:** WHITE CLIFFS PIPELINE, LLC — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2017-05-11
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 195.402(a), 195.402(c)(3), 195.402(d)(5), 195.420(a).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-320175003m.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-320175003m.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-320175003m
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/320175003M
**body:**

Notice of Amendment involving WHITE CLIFFS PIPELINE, LLC. PHMSA's enforcement data identifies the cited regulations as 195.402(a),  195.402(c)(3),  195.402(d)(5),  195.420(a). The case was opened on 2017-05-11 and is reported as closed as of 2018-03-28. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

320175003M_Closure Letter_03282018.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320175003M/320175003M_Closure%20Letter_03282018.pdf

320175003M_Closure Letter_03282018_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320175003M/320175003M_Closure%20Letter_03282018_text.pdf

320175003M_Notice of Amendment_05112017.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320175003M/320175003M_Notice%20of%20Amendment_05112017.pdf

320175003M_Notice of Amendment_05112017_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320175003M/320175003M_Notice%20of%20Amendment_05112017_text.pdf

320175003M_Operators Response To Notice_06062017.pdf: https://primis.phmsa.dot.gov/enforcement-documents/320175003M/320175003M_Operators%20Response%20To%20Notice_06062017.pdf

320175003M_Notice of Amendment_05112017_text.pdf

NOTICE OF AMENDMENT
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
May 11, 2017
Mr. David Minielly
Vice President of Operations
White Cliffs Pipeline, LLC
6120 S. Yale Ave.
Suite 1500
Tulsa, Oklahoma 74136
CPF 3-2017-5003M
Dear Mr. Minielly:
On October 3rd – 14th, 2016, representatives of the Central Region office of the Pipeline and
Hazardous Materials Safety Administration (PHMSA) pursuant to Chapter 601 of 49 United
States Code inspected the operation and maintenance (O&M) procedures for White Cliffs
Pipeline, LLC at your offices in Colorado, Kansas, and Oklahoma.
As a result of the inspection, PHMSA has identified the apparent inadequacies found within
White Cliffs Pipeline, LLC plans or procedures, as described below:
1. §195.402 Procedural manual for operations, maintenance, and emergencies.
(a) General. Each operator shall prepare and follow for each pipeline system a
manual of written procedures for conducting normal operations and maintenance
activities and handling abnormal operations and emergencies. This manual shall be
reviewed at intervals not exceeding 15 months, but at least once each calendar year,
and appropriate changes made as necessary to insure that the manual is effective.
This manual shall be prepared before initial operations of a pipeline system
commence, and appropriate parts shall be kept at locations where operations and
maintenance activities are conducted.



(c) Maintenance and normal operations. The manual required by paragraph (a) of
this section must include procedures for the following to provide safety during
maintenance and normal operations:
(3) Operating, maintaining, and repairing the pipeline system in accordance with
each of the requirements of this subpart and subpart H of this part.
§195.420 Valve maintenance.
(a) Each operator shall maintain each valve that is necessary for the safe operation
of its pipeline systems in good working order at all times
White Cliffs Pipeline procedures at the time of the inspection were simply repeat of the
code. The procedures did not indicate which valves are necessary for the safe operation of
its pipeline system or how they would ensure that the valves were in good working order.
2. §195.402 (a) See above
(d) Abnormal operation. The manual required by paragraph (a) of this section must
include procedures for the following to provide safety when operating design limits
have been exceeded:
(5) Periodically reviewing the response of operator personnel to
determine the effectiveness of the procedures controlling abnormal
operation and taking corrective action where deficiencies are found.
White Cliffs Pipeline procedures did not address how they would determine the
effectiveness of the abnormal operations procedures. The procedures did not address who
would review procedures or how often the procedures would be reviewed.
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.206. Enclosed
as part of this Notice is a document entitled Response Options for Pipeline Operators in
Compliance Proceedings. Please refer to this document and note the response options. Be
advised that all material you submit in response to this enforcement action is subject to being
made publicly available. If you believe that any portion of your responsive material qualifies
for confidential treatment under 5 U.S.C. 552(b), along with the complete original document
you must provide a second copy of the document with the portions you believe qualify for
confidential treatment redacted and an explanation of why you believe the redacted
information qualifies for confidential treatment under 5 U.S.C. 552(b).



Following the receipt of this Notice, you have 30 days to submit written comments, revised
procedures, or a request for a hearing under §190.211. If you do not respond within 30 days
of receipt of this Notice, this constitutes a waiver of your right to contest the allegations in this
Notice and authorizes the Associate Administrator for Pipeline Safety to find facts as alleged
in this Notice without further notice to you and to issue an Order Directing Amendment. If
your plans or procedures are found inadequate as alleged in this Notice, you may be ordered to
amend your plans or procedures to correct the inadequacies (49 C.F.R. § 190.206). If you are
not contesting this Notice, we propose that you submit your amended procedures to my office
within [number of days] days of receipt of this Notice. This period may be extended by
written request for good cause. Once the inadequacies identified herein have been addressed
in your amended procedures, this enforcement action will be closed.
It is requested (not mandated) that White Cliffs Pipeline maintain documentation of the safety
improvement costs associated with fulfilling this Notice of Amendment (preparation/revision
of plans, procedures) and submit the total to Allan C. Beshore, Director, Central Region,
Pipeline and Hazardous Materials Safety Administration. In correspondence concerning this
matter, please refer to CPF 3-2017-5003M and, for each document you submit, please provide
a copy in electronic format whenever possible.
Sincerely,
Allan C. Beshore
Director, Central Region, OPS
Pipeline and Hazardous Materials Safety Administration

320175003M_Closure Letter_03282018_text.pdf

CERTIFIED MAIL - RETURN RECEIPT REQUESTED
March 28, 2018
Mr. David Minielly
Vice President of Operations
White Cliffs Pipeline, LLC
6120 S. Yale Ave.
Suite 1500
Tulsa, Oklahoma 74136
CPF 3-2017-5003M
Dear Mr. Minielly:
On October 3rd -14th, 2016, a representative from the Pipeline and Hazardous Materials Safety
Administration (PHMSA), pursuant to chapter 601 of 49 United States Code, conducted an on-
site pipeline safety inspection of White Cliffs Pipeline, LLC procedures in Colorado, Kansas,
and Oklahoma. As a result of the inspection, White Cliffs Pipeline, LLC was issued a Notice of
Amendment on May 11, 2017, which proposed amendment of your procedures.
White Cliffs Pipeline, LLC submitted its amended procedures on June 6, 2017. My staff
reviewed the amended procedures, and it appears that the inadequacies outlined in this Notice of
Amendment have been corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank
you for your cooperation.
Sincerely,
Allan C. Beshore
Director, Central Region, OPS
Pipeline and Hazardous Materials Safety Administration