# BLUEWATER GAS STORAGE, LLC — Warning Letter

- **operation:** document
- **citation:** CPF 32021019WL
- **title:** BLUEWATER GAS STORAGE, LLC — Warning Letter
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2021-03-05
- **effective on:** Not available
- **summary:** CLOSED warning letter citing 192.227(a), 192.241(a)(1).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-32021019wl.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-32021019wl.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-32021019wl
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/32021019WL
**body:**

Warning Letter involving BLUEWATER GAS STORAGE, LLC. PHMSA's enforcement data identifies the cited regulations as 192.227(a),  192.241(a)(1). The case was opened on 2021-03-05 and is reported as closed as of 2021-03-05. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

32021019WL_Warning Letter_03052021_(21-203108).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32021019WL/32021019WL_Warning%20Letter_03052021_(21-203108).pdf

32021019WL_Warning Letter_03052021_(21-203108)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32021019WL/32021019WL_Warning%20Letter_03052021_(21-203108)_text.pdf

32021019WL_Warning Letter_03052021_(21-203108)_text.pdf

WARNING LETTER
VIA ELECTRONIC MAIL TO: Dan.Krueger@wecenergygroup.com and
chislead@michigan.gov
March 5, 2021
Mr. Dan Krueger
President
Bluewater Gas Storage, LLC
231 W. Michigan St
P468
Milwaukee, WI 53203
CPF 3-2021-019-WL
Dear Mr. Krueger:
On March 3, 2021, a representative of the Michigan Public Service Commission (MIPSC) acting
as an interstate agent for the Pipeline and Hazardous Materials Safety Administration (PHMSA),
pursuant to Chapter 601 of 49 United States Code, conducted a construction inspection of
Bluewater Gas Storage LLC's (BGS) in Highland Park, MI.
As a result of the inspection, it is alleged that you have committed probable violation(s) of the
Pipeline Safety Regulations, Title 49, Code of Federal Regulations (CFR). The items inspected
and the probable violation(s) are:
1. § 192.227 - Qualification of welders and welding operators.
(a) Except as provided in paragraph (b) of this section, each welder or welding operator
must be qualified in accordance with section 6, section 12, Appendix A or Appendix
B of API Std 1104 (incorporated by reference, see § 192.7), or section IX of the
ASME Boiler and Pressure Vessel Code (ASME BPVC) (incorporated by reference,
see § 192.7). However, a welder or welding operator qualified under an earlier
edition than the listed in § 192.7 of this part may weld but may not requalify under
that earlier edition.



BGS did not qualify two welders in accordance to Section 6 of API Standard 1104.
Specifically, the welders did not satisfactorily complete the procedure qualification test.
On March 3, 2021, a MI PSC representative went to the John E Green’s facility in Highland
Park MI to observe some welder qualifications for the upcoming construction work at the
Macomb County compressor station. While observing the qualifications, it was noted that
one welder did not ensure that the maximum root opening of 3/32" was not exceeded as
required by procedure SMAW 60S-1. Upon checking the gap after the clamp was removed
and the tacks were welded in, it was found that the gap was greater than 3/32". However, the
welder was allowed to continue with the weld by the BGS Certified Welding Inspector
(CWI). For the second welder, while observing the cap pass being put in, it was noted that
the welder was welding below the minimum amperage requirements for that pass and
electrode size. The welder was using a 5/32" 7010 electrode for the cap and was consistently
at 102 to 111 amps. The weld procedure SMAW 60S-1 requires the minimum amperage to
be 130 amps. Again, this welder was allowed to continue with the weld by the CWI.
2. § 192.241 - Inspection and test of welds.
(a) Visual inspection of welding must be conducted by an individual qualified by
appropriate training and experience to ensure that:
(1) The welding is performed in accordance with the welding procedure;
BGS’s welding inspectors did not ensure that the welding was performed in accordance with
the welding procedure (SMAW 60S-1).
During the welder qualification test, it was noted that for one welder, the root gap exceeded
the allowed maximum root opening of 3/32". Although the CWI (Certified Weld Inspector)
initially indicated that the gap was correct, it was noted that the CWI’s measurement tool was
broken so he could not correctly verify that the root opening was correct. Subsequent checks
by the MI PSC found that the root opening was exceeded. After an attempt to correct the
root opening which was unsuccessful, the welder was still allowed by the CWI to continue
with the weld.
Additionally, during the cap pass for the second welder, the CWI showed the MI-PSC the
amperage readings and noted that the readings were well below the minimum allowed on the
procedure. The readings were consistently 102-111 amps and the minimum allowed for that
7010 electrode size (5/32") was 130 amps. After discussion amongst the CWI inspectors, the
decision was made by the CWIs to allow the welder to complete the weld with no changes as
the CWIs did not feel the range specified in the procedure was adequate.
Under 49 U.S.C. § 60122 and 49 CFR § 190.223, you are subject to a civil penalty not to exceed
$222,504 per violation per day the violation persists, up to a maximum of $2,225,034 for a
2



related series of violations. For violation occurring on or after July 31, 2019 and before January
11, 2021, the maximum penalty may not exceed $218,647 per violation per day the violation
persists, up to a maximum of $2,186,465 for a related series of violations. For violation
occurring on or after November 27, 2018 and before July 31, 2019, the maximum penalty may
not exceed $213,268 per violation per day, with a maximum penalty not to exceed $2,132,679.
For violation occurring on or after November 2, 2015 and before November 27, 2018, the
maximum penalty may not exceed $209,002 per violation per day, with a maximum penalty not
to exceed $2,090,022.
We have reviewed the circumstances and supporting documents involved in this case, and have
decided not to conduct additional enforcement action or penalty assessment proceedings at this
time. We advise you to correct the item(s) identified in this letter. Failure to do so will result in
Bluewater Gas Storage, LLC being subject to additional enforcement action.
No reply to this letter is required. If you choose to reply, in your correspondence please refer to
CPF 3-2021-019-WL. Be advised that all material you submit in response to this enforcement
action is subject to being made publicly available. If you believe that any portion of your
responsive material qualifies for confidential treatment under 5 U.S.C. 552(b), along with the
complete original document you must provide a second copy of the document with the portions
you believe qualify for confidential treatment redacted and an explanation of why you believe
the redacted information qualifies for confidential treatment under 5 U.S.C. 552(b).
Sincerely,
Gregory A. Ochs
Director, Central Region, Office of Pipeline Safety
Pipeline and Hazardous Materials Safety Administration
CC: David Chislea, Program Manager, Michigan Public Service Commission
3
- **truncated:** false
- **body characters:** 6858