# TALLGRASS POWDER RIVER GATEWAY, LLC — Notice of Probable Violation

- **operation:** document
- **citation:** CPF 32021088NOPV
- **title:** TALLGRASS POWDER RIVER GATEWAY, LLC — Notice of Probable Violation
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2021-11-30
- **effective on:** Not available
- **summary:** CLOSED notice of probable violation citing 195.264(b)(1)(i).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-32021088nopv.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-32021088nopv.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-32021088nopv
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/32021088NOPV
**body:**

Notice of Probable Violation involving TALLGRASS POWDER RIVER GATEWAY, LLC. PHMSA's enforcement data identifies the cited regulation as 195.264(b)(1)(i). The case was opened on 2021-11-30 and is reported as closed as of 2023-01-26. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

32021088NOPV_Closure Letter_01262023_(21-210503).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32021088NOPV/32021088NOPV_Closure%20Letter_01262023_(21-210503).pdf

32021088NOPV_Closure Letter_01262023_(21-210503)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32021088NOPV/32021088NOPV_Closure%20Letter_01262023_(21-210503)_text.pdf

32021088NOPV_Final Order_01262022_(21-210503).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32021088NOPV/32021088NOPV_Final%20Order_01262022_(21-210503).pdf

32021088NOPV_Final Order_01262022_(21-210503)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32021088NOPV/32021088NOPV_Final%20Order_01262022_(21-210503)_text.pdf

32021088NOPV_Operator Response to Notice_12302021_(21-210503).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32021088NOPV/32021088NOPV_Operator%20Response%20to%20Notice_12302021_(21-210503).pdf

32021088NOPV_PCO_11302021_(21-210503).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32021088NOPV/32021088NOPV_PCO_11302021_(21-210503).pdf

32021088NOPV_PCO_11302021_(21-210503)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32021088NOPV/32021088NOPV_PCO_11302021_(21-210503)_text.pdf

32021088NOPV_Closure Letter_01262023_(21-210503)_text.pdf

VIA ELECTRONIC MAIL TO: bill.moler@tallgrassenergylp.com;
jennifer.eckels@tallgrassenergylp.com; crystal.heter@tallgrassenergylp.com
January 26, 2023
William Moler
Chief Executive Officer
Tallgrass Powder River Gateway, LLC
4200 W. 115th St., Suite 350
Leawood, KS 66211
RE: CPF 3-2021-088-NOPV
Dear Mr. Moler:
On January 26, 2022, the Pipeline and Hazardous Materials Safety Administration (PHMSA)
issued to Tallgrass Powder River Gateway, LLC (Tallgrass) a Final Order in the above-
referenced case. This Order included a Compliance Order requirement to take corrective actions
on your pipeline. Based on our review of the documentation provided by Tallgrass, it has been
determined that Tallgrass has complied with the terms of this Order.
Accordingly, this case is now closed, and no further action is contemplated with respect to the
matters involved in this case. Thank you for your cooperation in this matter.
Sincerely,
Gregory A. Ochs
Director, Central Region, OPS
Pipeline and Hazardous Materials Safety Administration
cc: Jennifer Eckles, Director Compliance, jennifer.eckels@tallgrassenergylp.com
Crystal Heter, Chief Operating Officer, crystal.heter@tallgrassenergylp.com

32021088NOPV_Final Order_01262022_(21-210503)_text.pdf

January 26, 2022
VIA ELECTRONIC MAIL TO: bill.moler@tallgrassenergylp.com
Mr. William Moler
Chief Executive Officer
Tallgrass Powder River Gateway, LLC
4200 W. 115th St., Suite 350
Leawood, Kansas 66211
Re: CPF No. 3-2021-088-NOPV
Dear Mr. Moler:
Enclosed please find the Final Order issued in the above-referenced case. It makes a finding of
violation and specifies actions that need to be taken to comply with the pipeline safety
regulations. When the terms of the compliance order are completed, as determined by the
Director, Central Region, this enforcement action will be closed. Service of the Final Order by
e-mail is effective upon the date of transmission as provided under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Alan K. Mayberry
Associate Administrator
for Pipeline Safety
Enclosures (Final Order and NOPV)
cc: Mr. Gregory Ochs, Director, Central Region, Office of Pipeline Safety, PHMSA
Ms. Jennifer Eckles, Manager - Compliance, Tallgrass Powder River Gateway, LLC,
jennifer.eckels@tallgrassenergylp.com
Ms. Crystal Heter, Chief Operating Officer, Tallgrass Powder River Gateway, LLC,
crystal.heter@tallgrassenergylp.com
Mr. Brad Armsbury, Compliance Engineer, Tallgrass Powder River Gateway, LLC,
brad.armsbury@tallgrassenergylp.com
CONFIRMATION OF RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
____________________________________
In the Matter of )
Tallgrass Powder River Gateway, LLC, ) CPF No. 3-2021-088-NOPV
)
)
)
Respondent. )
____________________________________)
FINAL ORDER
On November 30, 2021, pursuant to 49 C.F.R. § 190.207, the Director, Central Region, Office of
Pipeline Safety (OPS), issued a Notice of Probable Violation (Notice) to Tallgrass Powder River
Gateway, LLC (Respondent). The Notice proposed finding that Respondent had violated a
pipeline safety regulation in 49 C.F.R. Part 195. The Notice also proposed certain measures to
correct the violation. Respondent did not contest the allegation of violation or corrective
measures.
Based upon a review of all of the evidence, pursuant to § 190.213, I find Respondent violated the
pipeline safety regulation listed below, as more fully described in the enclosed Notice, which is
incorporated by reference:
49 C.F.R. § 195.264(b)(1)(i) (Item 1) ─ Respondent failed to satisfy the
requirements of Section 22.11.2 of NFPA-30 (2012 edition) regarding
impoundment around breakout tanks.
This finding of violation will be considered a prior offense in any subsequent enforcement action
taken against Respondent.
Compliance Actions
Pursuant to 49 U.S.C. § 60118(b) and 49 C.F.R. § 190.217, Respondent is ordered to take the
actions proposed in the enclosed Notice to correct the violation. The Director may grant an
extension of time to comply with any of the required items upon a written request timely
submitted by the Respondent and demonstrating good cause for an extension. Upon completion
of ordered actions, Respondent may request that the Director close the case. Failure to comply
with this Order may result in the assessment of civil penalties under 49 C.F.R. § 190.223 or in
referral to the Attorney General for appropriate relief in a district court of the United States.



CPF No. 3-2021-088-NOPV
Page 2
The terms and conditions of this order are effective upon service in accordance with 49 C.F.R.
§ 190.5.
January 26, 2022
___________________________________ _________________________
Alan K. Mayberry Date Issued
Associate Administrator
for Pipeline Safety
- **truncated:** false
- **body characters:** 6470
