# ENBRIDGE ENERGY, LIMITED PARTNERSHIP — Notice of Probable Violation

- **operation:** document
- **citation:** CPF 32022016NOPV
- **title:** ENBRIDGE ENERGY, LIMITED PARTNERSHIP — Notice of Probable Violation
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2022-01-07
- **effective on:** Not available
- **summary:** CLOSED notice of probable violation citing 195.446(c)(2), 195.446(c)(3).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-32022016nopv.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-32022016nopv.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-32022016nopv
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/32022016NOPV
**body:**

Notice of Probable Violation involving ENBRIDGE ENERGY, LIMITED PARTNERSHIP. PHMSA's enforcement data identifies the cited regulations as 195.446(c)(2),  195.446(c)(3). The case was opened on 2022-01-07 and is reported as closed as of 2022-08-31. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

32022016NOPV_Closure Letter_08312022_(20-187013).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32022016NOPV/32022016NOPV_Closure%20Letter_08312022_(20-187013).pdf

32022016NOPV_Closure Letter_08312022_(20-187013)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32022016NOPV/32022016NOPV_Closure%20Letter_08312022_(20-187013)_text.pdf

32022016NOPV_Final Order_05242022_(20-187013).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32022016NOPV/32022016NOPV_Final%20Order_05242022_(20-187013).pdf

32022016NOPV_Final Order_05242022_(20-187013)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32022016NOPV/32022016NOPV_Final%20Order_05242022_(20-187013)_text.pdf

32022016NOPV_Operator Response to Notice and Request for Hearing_02072022_(20-187013).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32022016NOPV/32022016NOPV_Operator%20Response%20to%20Notice%20and%20Request%20for%20Hearing_02072022_(20-187013).pdf

32022016NOPV_Operator Withdrawal of Request for Hearing_03252022_(20-187013).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32022016NOPV/32022016NOPV_Operator%20Withdrawal%20of%20Request%20for%20Hearing_03252022_(20-187013).pdf

32022016NOPV_PCO_01072022_(20-187013).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32022016NOPV/32022016NOPV_PCO_01072022_(20-187013).pdf

32022016NOPV_PCO_01072022_(20-187013)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32022016NOPV/32022016NOPV_PCO_01072022_(20-187013)_text.pdf

32022016NOPV_Final Order_05242022_(20-187013)_text.pdf

May 24, 2022
VIA ELECRONIC MAIL TO: colin.gruending@enbridge.com
Mr. Colin K. Gruending
Executive Vice President and President, Liquid Pipelines
Enbridge Inc.
200, Fifth Avenue Place
425 - 1st Street SW
Calgary, Alberta, Canada T2P 3L8
Re: CPF No. 3-2022-016-NOPV
Dear Mr. Gruending:
Enclosed please find the Final Order issued in the above-referenced case to your subsidiary
Enbridge Energy, Limited Partnership. It makes a finding of violation and specifies actions that
need to be taken to comply with the pipeline safety regulations. When the terms of the
compliance order are completed, as determined by the Director, Central Region, this
enforcement action will be closed. Service of the Final Order by e-mail is effective upon the date
of transmission and acknowledgement of receipt as provided under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Alan K. Mayberry
Associate Administrator
for Pipeline Safety
Enclosures (Final Order and NOPV)
cc: Mr. Gregory Ochs, Director, Central Region, Office of Pipeline Safety, PHMSA
Mr. Michael Koby, Vice President, US Operations, Enbridge Inc.,
michael.koby@enbridge.com
Mr. David Stafford, Manager, US Pipeline Compliance, Enbridge Inc.,
david.stafford@enbridge.com
CONFIRMATION OF RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
____________________________________
)
In the Matter of )
)
Enbridge Energy, Limited Partnership, ) CPF No. 3-2022-016-NOPV
a subsidiary of Enbridge Inc., )
)
Respondent. )
____________________________________)
FINAL ORDER
On January 7, 2022, pursuant to 49 C.F.R. § 190.207, the Director, Central Region, Office of
Pipeline Safety (OPS), issued a Notice of Probable Violation (Notice) to Enbridge Energy,
Limited Partnership (Respondent), an operating subsidiary of Enbridge Inc.
1 The Notice
proposed finding that Respondent had violated a pipeline safety regulation in 49 C.F.R. Part 195.
The Notice also proposed certain measures to correct the violation. Respondent did not contest
the allegation of violation or corrective measures.
Based upon a review of all of the evidence, pursuant to § 190.213, I find Respondent violated the
pipeline safety regulation listed below, as more fully described in the enclosed Notice, which is
incorporated by reference:
49 C.F.R. § 195.446(c)(3) (Item 2) ─ Respondent failed to test and verify their
internal communication plan to provide adequate means for manual operation of
the pipeline safely, at least once each calendar year, but at intervals not to exceed
15 months.
This finding of violation will be considered a prior offense in any subsequent enforcement action
taken against Respondent.
Compliance Actions
Pursuant to 49 U.S.C. § 60118(b) and 49 C.F.R. § 190.217, Respondent is ordered to take the
actions proposed in the enclosed Notice to correct the violation. The Director may grant an
1 US SEC Form 10-K, Enbridge Inc., available at https://www.enbridge.com/investment-center/reports-and-sec-
filings/sec-filings/sec-filing-details?docId=264778 (last accessed May 6, 2022).



CPF No. 3-2022-016-NOPV
Page 2
extension of time to comply with any of the required items upon a written request timely
submitted by the Respondent and demonstrating good cause for an extension. Upon completion
of the ordered actions, Respondent may request that the Director close the case. Failure to
comply with this Order may result in the assessment of civil penalties under 49 C.F.R. § 190.223
or in referral to the Attorney General for appropriate relief in a district court of the United States.
Warning Item
With respect to Item 1, the Notice alleged a probable violation of 49 C.F.R. § 195.446(c)(2), but
did not propose a civil penalty or compliance order for this item. Therefore, this is considered to
be a warning item. If OPS finds a violation of this provision in a subsequent inspection,
Respondent may be subject to future enforcement action.
The terms and conditions of this order are effective upon service in accordance with 49 C.F.R.
§ 190.5.
May 24, 2022
___________________________________ _________________________
Alan K. Mayberry Date Issued
Associate Administrator
for Pipeline Safety

32022016NOPV_Closure Letter_08312022_(20-187013)_text.pdf

VIA ELECTRONIC MAIL TO: and jim.ramness@enbridge.com
michael.koby@enbridge.com, david.stafford@enbridge.com,
August 31, 2022
Michael Koby
Vice President, US Operations
Enbridge Energy, Limited Partnership
5400 Westheimer Court
Houston, Texas 77056
Re: CPF 3-2022-016-NOPV
Dear Mr. Koby:
On May 24, 2022, the Pipeline and Hazardous Materials Safety Administration (PHMSA) issued
to Enbridge Energy, Limited Partnership (Enbridge) a Final Order in the above-referenced case.
This Order included a Compliance Order requirement to take corrective actions on your pipeline.
Enbridge submitted its Response and corresponding documentation to the Final Order on August
11, 2022. Based on our review of the documentation that you provided, it has been determined
that you have complied with the terms of this Order
Accordingly, this case is now closed, and no further action is contemplated with respect to the
matters involved in this case. Thank you for your cooperation in this matter.
Sincerely,
Gregory A. Ochs
Director, Central Region, Office of Pipeline Safety
Pipeline and Hazardous Materials Safety Administration
cc: David Stafford, Manager Compliance david.stafford@enbridge.com