# TANKS R US — Notice of Probable Violation

- **operation:** document
- **citation:** CPF 32022024NOPV
- **title:** TANKS R US — Notice of Probable Violation
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2022-03-25
- **effective on:** Not available
- **summary:** CLOSED notice of probable violation citing 195.310(a), 195.402(a).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-32022024nopv.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-32022024nopv.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-32022024nopv
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/32022024NOPV
**body:**

Notice of Probable Violation involving TANKS R US. PHMSA's enforcement data identifies the cited regulations as 195.310(a),  195.402(a). The case was opened on 2022-03-25 and is reported as closed as of 2025-03-14. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

32022024NOPV_Closure Letter_03142025_(20-179518).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32022024NOPV/32022024NOPV_Closure%20Letter_03142025_(20-179518).pdf

32022024NOPV_Closure Letter_03142025_(20-179518)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32022024NOPV/32022024NOPV_Closure%20Letter_03142025_(20-179518)_text.pdf

32022024NOPV_Final Order_06022022_(20-179518).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32022024NOPV/32022024NOPV_Final%20Order_06022022_(20-179518).pdf

32022024NOPV_Final Order_06022022_(20-179518)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32022024NOPV/32022024NOPV_Final%20Order_06022022_(20-179518)_text.pdf

32022024NOPV_Operator Response to Notice_04182022_(20-179518).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32022024NOPV/32022024NOPV_Operator%20Response%20to%20Notice_04182022_(20-179518).pdf

32022024NOPV_PCO_03252022_(20-179518).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32022024NOPV/32022024NOPV_PCO_03252022_(20-179518).pdf

32022024NOPV_PCO_03252022_(20-179518)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32022024NOPV/32022024NOPV_PCO_03252022_(20-179518)_text.pdf

32022024NOPV_Closure Letter_03142025_(20-179518)_text.pdf

VIA ELECTRONIC MAIL TO: KLappinga@HollandTerminal.com;
nboschma@hollandterminal.com; THowell@rcp.com
March 14, 2025
Kelly Lappinga
Facility Manager
Tanks R Us, LLC
630 Ottawa Avenue,
Holland, MI 49423
RE: CPF 3-2022-024-NOPV
Dear Mr. Lappinga:
On June 2, 2022, the Pipeline and Hazardous Materials Safety Administration (PHMSA) issued
to Tanks R Us, LLC (TRU) a Final Order pursuant to 49 CFR § 190.213. The Order included a
Compliance Order. Based on our review of the documentation provided on March 8, 2025, it has
been determined that TRU has complied with the terms of the Order.
Accordingly, this case is now closed, and no further action is contemplated with respect to the
matters involved in this case. Thank you for your cooperation in this matter.
Sincerely,
Gregory A. Ochs,
Director, Central Region, OPS
Pipeline and Hazardous Materials Safety Administration
cc: Nate Boschma, Tanks R Us, nboschma@hollandterminal.com
Tina Hollowell, Tanks R Us, THowell@rcp.com

32022024NOPV_Final Order_06022022_(20-179518)_text.pdf

June 2, 2022
VIA ELECTRONIC MAIL TO: klappinga@hollandterminal.com
Mr. Kelly Lappinga
Facility Manager
Tanks R Us, LLC
630 Ottawa Avenue
Holland, Michigan 49423
Re: CPF No. 3-2022-024-NOPV
Dear Mr. Lappinga:
Enclosed please find the Final Order issued in the above-referenced case. It makes a finding of
violation and specifies actions that need to be taken to comply with the pipeline safety
regulations. When the terms of the compliance order are completed, as determined by the
Director, Central Region, this enforcement action will be closed. Service of the Final Order by
e-mail is effective upon the date of transmission and acknowledgement of receipt as provided
under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Alan K. Mayberry
Associate Administrator
for Pipeline Safety
Enclosures (Final Order and NOPV)
cc: Mr. Gregory A. Ochs, Director, Central Region, Office of Pipeline Safety, PHMSA
Mr. Jeff Soerries, Operations Manager, Tanks R Us, jsoerries@hollandterminal.com
CONFIRMATION OF RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
____________________________________
In the Matter of )
Tanks R Us, LLC, ) CPF No. 3-2022-024-NOPV
)
)
)
Respondent. )
____________________________________)
FINAL ORDER
On March 25, 2022, pursuant to 49 C.F.R. § 190.207, the Director, Central Region, Office of
Pipeline Safety (OPS), issued a Notice of Probable Violation (Notice) to Tanks R Us, LLC
(Respondent). The Notice proposed finding that Respondent had violated the pipeline safety
regulations in 49 C.F.R. Part 195. The Notice also proposed certain measures to correct the
violation. Respondent did not contest the allegations of violation or corrective measures.
Based on a review of all of the evidence, pursuant to § 190.213, I find Respondent violated the
pipeline safety regulations listed below, as more fully described in the enclosed Notice, which is
incorporated by reference:
49 C.F.R. § 195.310(a) (Item 1) ─ Respondent failed to maintain a record of each
pressure test required by Subpart E of Part 195, including a record of the latest
test which must be retained as long as the facility tested is in use.
This finding of violation will be considered a prior offense in any subsequent enforcement action
taken against Respondent.
Compliance Actions
Pursuant to 49 U.S.C. § 60118(b) and 49 C.F.R. § 190.217, Respondent is ordered to take the
actions proposed in the enclosed Notice to correct the violation. The Director may grant an
extension of time to comply with any of the required items upon a written request timely
submitted by the Respondent and demonstrating good cause for an extension. Upon completion
of the ordered actions, Respondent may request that the Director close the case. Failure to
comply with this Order may result in the assessment of civil penalties under 49 C.F.R. § 190.223
or in referral to the Attorney General for appropriate relief in a district court of the United States.



CPF 3-2022-024-NOPV
Page 2
Warning Item
With respect to Item 2, the Notice alleged a probable violation of 49 C.F.R. § 195.402(a), but did
not propose a civil penalty or compliance order for this item. Therefore, this is considered to be
a warning item. If OPS finds a violation of this provision in a subsequent inspection,
Respondent may be subject to future enforcement action.
The terms and conditions of this order are effective upon service in accordance with 49 C.F.R.
§ 190.5.
June 2, 2022
___________________________________ _________________________
Alan K. Mayberry Date Issued
Associate Administrator
for Pipeline Safety
- **truncated:** false