# CALIBER SPRING CREEK LLC — Warning Letter

- **operation:** document
- **citation:** CPF 32022039WL
- **title:** CALIBER SPRING CREEK LLC — Warning Letter
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2022-03-07
- **effective on:** Not available
- **summary:** CLOSED warning letter citing 195.264(b)(1)(i), 195.401(a).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-32022039wl.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-32022039wl.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-32022039wl
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/32022039WL
**body:**

Warning Letter involving CALIBER SPRING CREEK LLC. PHMSA's enforcement data identifies the cited regulations as 195.264(b)(1)(i),  195.401(a). The case was opened on 2022-03-07 and is reported as closed as of 2022-03-07. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

32022039WL_Warning Letter_03072022_(21-220247).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32022039WL/32022039WL_Warning%20Letter_03072022_(21-220247).pdf

32022039WL_Warning Letter_03072022_(21-220247)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32022039WL/32022039WL_Warning%20Letter_03072022_(21-220247)_text.pdf

32022039WL_Warning Letter_03072022_(21-220247)_text.pdf

WARNING LETTER
VIA ELECTRONIC MAIL TO: dwerth@calibermidstream.com;
dray@calibermidstream.com; kjohnson@calibermidstream.com;
aporter@calibermidstream.com;
March 7, 2022
Mr. Daniel Werth,
President and Chief Executive Officer
Caliber Midstream Partners, LP
P.O. Box 268
Denver, Colorado 80201
CPF 3-2022-039-WL
Dear Mr. Werth:
From August 18 through 19, 2021, a representative of the Pipeline and Hazardous Materials
Safety Administration (PHMSA), pursuant to Chapter 601 of 49 United States Code (U.S.C.),
inspected your Caliber Spring Creek LLC (CSC) pipeline and facilities in Watford City, North
Dakota.
As a result of the inspection, it is alleged that you have committed probable violation(s) of the
Pipeline Safety Regulations, Title 49, Code of Federal Regulations (CFR). The items inspected,
and the probable violations are:
1. § 195.264 Impoundment, protection against entry, normal/emergency venting or
pressure/vacuum relief for aboveground breakout tanks.
(a) . . .
(b) After October 2, 2000, compliance with paragraph (a) of this section requires the
following for the aboveground breakout tanks specified:
(1) For tanks built to API Spec 12F, API Std 620, and others (such as API Std 650 (or
its predecessor Standard 12C)), the installation of impoundment must be in accordance
with the following sections of NFPA-30 (incorporated by reference, see § 195.3);
(i) Impoundment around a breakout tank must be installed in accordance with section
22.11.2;



Caliber Spring Creek LLC (CSC) failed to satisfy the requirements of Section 22.11.2 of NFPA-
30 (2012 edition) regarding impoundment around breakout tanks as required by §195.264(b)(1).
Section 22.11.2.1, NFPA-30 (2012 edition) requires that " [a] slope of not less than one percent
away from the tank shall be provided for at least 50 feet (15 meters) or to the dike base,
whichever is less".
After Caliber took operational control of the newly acquired Spring Creek pipeline system
(November 2019), they had noted deficiencies to the impoundment of the eight 400-barrel
breakout tank compound (breakout tanks built to API 12F standards). The main concern was
that all tanks could drain as one in the event of a loss of containment in any single tank,
therefore the existing capacity of the impoundment was insufficient. Another issue was that
the existing configuration did not have one percent slope away from the tanks, for any
distance. At the time of the August 2020 Field Inspection, the rework of the tank piping had
brought the impoundment capacity into compliance with Section 22.11.2.2, NFPA-30 (2012
edition). However, the slope away from the tanks was still not as required. Caliber's
Engineering Group had noted during the inspection that there was a plan to rework the
sloping inside the impoundment. Therefore, CSC is in violation of § 195.264(b)(1)(i).
2. § 195.401 General requirements.
(a) No operator may operate or maintain its pipeline systems at a level of safety lower
than that required by this subpart and the procedures it is required to establish under
§ 195.402(a) of this subpart.
CSC operated their pipeline at a level of safety lower than that required by Subpart F and the
procedures it is required to establish under § 195.402(a) of that subpart as required by
§ 195.401(a). Specifically, Pressure Safety Valve PSV-005 was not correctly routed and
therefore would not relieve line pressure downstream of the pump. Caliber’s Engineering
Group documented a Management of Change (MOC 1127-003) originated in April 2021 to
correct the issue, but rework had not been completed as of August 2021. Therefore, CSC is
in violation of § 195.401(a).
Under 49 U.S.C. § 60122 and 49 CFR § 190.223, you are subject to a civil penalty not to exceed
$225,134 per violation per day the violation persists, up to a maximum of $2,251,334 for a
related series of violations. For violation occurring on or after January 11, 2021 and before
May 3, 2021, the maximum penalty may not exceed $222,504 per violation per day the
violation persists, up to a maximum of $2,225,034 for a related series of violations. For
violation occurring on or after July 31, 2019 and before January 11, 2021, the maximum
penalty may not exceed $218,647 per violation per day the violation persists, up to a maximum
of $2,186,465 for a related series of violations. For violation occurring on or after November
27, 2018 and before July 31, 2019, the maximum penalty may not exceed $213,268 per
violation per day, with a maximum penalty not to exceed $2,132,679. For violation occurring
on or after November 2, 2015 and before November 27, 2018, the maximum penalty may not
exceed $209,002 per violation per day, with a maximum penalty not to exceed $2,090,022.



We have reviewed the circumstances and supporting documents involved in this case and have
decided not to conduct additional enforcement action or penalty assessment proceedings at this
time. We advise you to correct the items identified in this letter. Failure to do so will result in
Caliber Spring Creek LLC being subject to additional enforcement action.
No reply to this letter is required. If you choose to reply, in your correspondence please refer
to CPF 3-2022-039-WL. Be advised that all material you submit in response to this
enforcement action is subject to being made publicly available. If you believe that any portion
of your responsive material qualifies for confidential treatment under 5 U.S.C. 552(b), along
with the complete original document you must provide a second copy of the document with
the portions you believe qualify for confidential treatment redacted and an explanation of why
you believe the redacted information qualifies for confidential treatment under 5 U.S.C.
552(b).
Sincerely,
Gregory A. Ochs
Director, Central Region, OPS
Pipeline and Hazardous Materials Safety Administration
cc: David Ray, Operations Manager, dray@calibermidstream.com
Katie Johnson, Project Manager, kjohnson@calibermidstream.com
Allison Porter, Director of Operations and Engineering, aporter@calibermidstream.com