# MAGELLAN PIPELINE COMPANY, LP — Warning Letter

- **operation:** document
- **citation:** CPF 32022049WL
- **title:** MAGELLAN PIPELINE COMPANY, LP — Warning Letter
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2022-07-07
- **effective on:** Not available
- **summary:** CLOSED warning letter citing 195.118(c), 195.264(b)(1)(i), 195.428(a).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-32022049wl.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-32022049wl.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-32022049wl
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/32022049WL
**body:**

Warning Letter involving MAGELLAN PIPELINE COMPANY, LP. PHMSA's enforcement data identifies the cited regulations as 195.118(c),  195.264(b)(1)(i),  195.428(a). The case was opened on 2022-07-07 and is reported as closed as of 2022-07-07. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

32022049WL_Warning Letter_07072022_(21-207738).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32022049WL/32022049WL_Warning%20Letter_07072022_(21-207738).pdf

32022049WL_Warning Letter_07072022_(21-207738)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32022049WL/32022049WL_Warning%20Letter_07072022_(21-207738)_text.pdf

32022049WL_Warning Letter_07072022_(21-207738)_text.pdf

WARNING LETTER
VIA ELECTRONIC MAIL TO: aaron.milford@magellanlp.com;
Katie.McCullough@MagellanLP.com
July 7, 2022
Aaron L. Milford
Chief Executive Officer
Magellan Midstream Partners, LP
P.O. Box 22186
Tulsa, Oklahoma 74121
CPF 3-2022-049-WL
Dear Mr. Milford:
From March 21 through October 22, 2021, representatives of the Pipeline and Hazardous Materials
Safety Administration (PHMSA), Office of Pipeline Safety (OPS), pursuant to Chapter 601 of 49
United States Code (U.S.C.), inspected Magellan Midstream Partners, LP’s (Magellan)
petroleum pipeline facilities in Tulsa and Shinn Pence, Oklahoma, and Cheyenne, Wyoming.
As a result of the inspection, it is alleged that Magellan has committed probable violations of the
Pipeline Safety Regulations, Title 49, Code of Federal Regulations (CFR). The items inspected
and the probable violations are:
1. §195.118 Fittings
(a) . . . .
(c) The fitting must be suitable for the intended service and at least me as strong as
the pipe and other fittings in the pipeline system to which it is attached.
Magellan failed to have fittings that were at least as strong as the pipe and other fittings in the
pipeline system to which they were attached. During a field audit, PHMSA observed a pig
launcher/receiver with a manufacture stamp documenting that the maximum allowable working
pressure for the pipeline launcher/receiver was 450 psig. However, the pipeline had a maximum
operating pressure of 720 psig at the West Tulsa Terminal, which includes the launcher/receiver.
In addition, PHMSA observed a pipeline filter separator at the West Tulsa Terminal with a
design pressure of 270 psig even though the maximum operating pressure of the pipeline
associated with the filter separator was 275 psig.



2. §195.264 Impoundment, protection against entry, normal/emergency venting or
pressure/vacuum relief for aboveground breakout tanks.
(a) . . . .
(b) After October 2, 2000, compliance with paragraph(a) of this section requires the
following for the aboveground breakout tanks specified:
(1) For tanks built to API Spec 12F, API Std 620, and others (such as API Std 650
(or its predecessor Standard 12C)), the installation of impoundment must be in
accordance with the following sections of NFPA-30 (incorporated by reference, see §
195.3).
(i) Impoundment around a breakout tank must be installed in accordance with
section 22.11.2;
Magellan failed to install impoundment around a breakout tank in accordance with NFPA-30,
Section 22.11.2. PHMSA inspectors observed, during the on-site inspection at Reno Terminal in
Oklahoma City, that the impoundment area for Tank 1245 (installed in 2008) failed to have an
intermediate dike, be subdivided or have a drainage channel. NFPA-30, Section 22.11.2
(incorporated by reference) requires that each diked area containing two or more tanks be
subdivided in order to prevent minor tank spills from endangering adjacent tanks within the
diked area. PHMSA notes that after the inspection observation and discussion, Magellan
completed modifications to the terminal to incorporate impoundment subdivision on or about
January 6, 2022.
3. §195.428 Overpressure safety devices and overfill protection systems
(a) Except as provided in paragraph (b) of this section, each operator shall, at
intervals not exceeding 15 months, but at least once each calendar year, or in the
case of pipelines used to carry highly volatile liquids, at intervals not to exceed
7½ months, but at least twice each calendar year, inspect and test each pressure
limiting device, relief valve, pressure regulator, or other item of pressure control
equipment to determine that it is functioning properly, is in good mechanical
condition, and is adequate from the standpoint of capacity and reliability of
operation for the service in which it is used.
Magellan failed to inspect and test Pressure Control Valve number 10 (PCV10) at the Chenneye
Terminal in order to determine that it was functioning properly, was in good mechanical
condition, and was adequate from the standpoint of capacity and reliability of operation for the
service in which it was used at intervals not exceeding 15 months, but at least once each calendar
year for calendar years 2019 and 2020. PHMSA reviewed the Protective and Control Device
Inspection Records (07-Form-0741) alongside the Piping and Instrumentation Diagram and
could not locate a record for PCV10 at the Cheyenne Terminal. Magellan responded to
PHMSA’s request for the inspection records stating that Magellan did not have the inspection
records. After PHMSA identified the missing inspection for PCV10, Magellan completed an
inspection and documented the results on 07-FORM-0741 on August 31, 2021.



Under 49 U.S.C. § 60122 and 49 CFR § 190.223, you are subject to a civil penalty not to exceed
$239,142 per violation per day the violation persists, up to a maximum of $2,391,142 for a
related series of violations. For violation occurring on or after May 3, 2021 and before March
21, 2022, the maximum penalty may not exceed $225,134 per violation per day the violation
persists, up to a maximum of $2,251,334 for a related series of violations. For violation
occurring on or after January 11, 2021 and before May 3, 2021, the maximum penalty may not
exceed $222,504 per violation per day the violation persists, up to a maximum of $2,225,034 for
a related series of violations. For violation occurring on or after July 31, 2019 and before
January 11, 2021, the maximum penalty may not exceed $218,647 per violation per day the
violation persists, up to a maximum of $2,186,465 for a related series of violations. For violation
occurring on or after November 27, 2018 and before July 31, 2019, the maximum penalty may
not exceed $213,268 per violation per day, with a maximum penalty not to exceed $2,132,679.
For violation occurring on or after November 2, 2015, and before November 27, 2018, the
maximum penalty may not exceed $209,002 per violation per day, with a maximum penalty not
to exceed $2,090,022.
We have reviewed the circumstances and supporting documents involved in this case, and have
decided not to conduct additional enforcement action or penalty assessment proceedings at this
time. We advise you to correct the items identified in this letter. Failure to do so will result in
Magellan Midstream Partners, LP, being subject to additional enforcement action.
No reply to this letter is required. If you choose to reply, in your correspondence please refer to
CPF 3-2022-049-WL. Be advised that all material you submit in response to this enforcement
action is subject to being made publicly available. If you believe that any portion of your
responsive material qualifies for confidential treatment under 5 U.S.C. § 552(b), along with the
complete original document you must provide a second copy of the document with the portions
you believe qualify for confidential treatment redacted and an explanation of why you believe
the redacted information qualifies for confidential treatment under 5 U.S.C. § 552(b).
Sincerely,
Gregory A. Ochs
Director, Central Region, Office of Pipeline Safety
Pipeline and Hazardous Materials Safety Administration
cc: Katie McCullough, P.E. Manager, Integrity Management and Regulatory Compliance,
Katie.McCullough@MagellanLP.com
- **truncated:** false