# MAGELLAN PIPELINE COMPANY, LP — Notice of Probable Violation

- **operation:** document
- **citation:** CPF 32022052NOPV
- **title:** MAGELLAN PIPELINE COMPANY, LP — Notice of Probable Violation
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2022-11-10
- **effective on:** Not available
- **summary:** CLOSED notice of probable violation citing 194.105(a), 194.105(b)(4), 195.406(b), 195.452(i)(2)(vi), 195.583(a), 195.583(b).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-32022052nopv.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-32022052nopv.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-32022052nopv
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/32022052NOPV
**body:**

Notice of Probable Violation involving MAGELLAN PIPELINE COMPANY, LP. PHMSA's enforcement data identifies the cited regulations as 194.105(a),  194.105(b)(4),  195.406(b),  195.452(i)(2)(vi),  195.583(a),  195.583(b). The case was opened on 2022-11-10 and is reported as closed as of 2023-09-18. Proposed civil penalty: $122,600. Assessed civil penalty: $53,500. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

32022052NOPV_Closure Letter_09182023_(21-207738).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32022052NOPV/32022052NOPV_Closure%20Letter_09182023_(21-207738).pdf

32022052NOPV_Closure Letter_09182023_(21-207738)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32022052NOPV/32022052NOPV_Closure%20Letter_09182023_(21-207738)_text.pdf

32022052NOPV_Consent Agreement and Order_05012023_(21-207738).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32022052NOPV/32022052NOPV_Consent%20Agreement%20and%20Order_05012023_(21-207738).pdf

32022052NOPV_Consent Agreement and Order_05012023_(21-207738)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32022052NOPV/32022052NOPV_Consent%20Agreement%20and%20Order_05012023_(21-207738)_text.pdf

32022052NOPV_Operator Response to Notice_01232023_(21-207738).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32022052NOPV/32022052NOPV_Operator%20Response%20to%20Notice_01232023_(21-207738).pdf

32022052NOPV_Operator Withdrawal of Hearing Request_05012023_(21-207738).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32022052NOPV/32022052NOPV_Operator%20Withdrawal%20of%20Hearing%20Request_05012023_(21-207738).pdf

32022052NOPV_PCP PCO_11102022_(21-207738).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32022052NOPV/32022052NOPV_PCP%20PCO_11102022_(21-207738).pdf

32022052NOPV_PCP PCO_11102022_(21-207738)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32022052NOPV/32022052NOPV_PCP%20PCO_11102022_(21-207738)_text.pdf

32022052NOPV_PHC Hearing Scheduled_02092023_(21-207738).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32022052NOPV/32022052NOPV_PHC%20Hearing%20Scheduled_02092023_(21-207738).pdf

32022052NOPV_PHC Hearing Scheduled_02092023_(21-207738)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32022052NOPV/32022052NOPV_PHC%20Hearing%20Scheduled_02092023_(21-207738)_text.pdf

32022052NOPV_PHC Hearing Scheduled_02092023_(21-207738)_text.pdf

February 9, 2023
VIA ELECTRONIC MAIL TO: mark.materna@magellanlp.com and gregory.ochs@dot.gov
Mr. Mark Materna
Director, Pipeline Integrity
Magellan Midstream Partners, LP
P.O. Box 22186
Tulsa, OK 74172-2186
Mr. Gregory Ochs
Director, Central Region
Pipeline and Hazardous Materials Safety Administration
901 Locust Street, Suite 480
Kansas City, MO 64106-2641
Re: Notice of Hearing, Magellan Midstream Partners, LP
CPF No. 3-2022-052-NOPV
Dear Mr. Materna and Mr. Ochs:
In accordance with 49 C.F.R. § 190.211, an informal hearing will be held regarding the Notice of
Probable Violation, Proposed Civil Penalty, and Proposed Compliance Order issued by the Pipeline
and Hazardous Materials Safety Administration in the above-referenced case. The hearing will take
place on June 14, 2023, beginning at 8:30 a.m. Central Time.
The hearing will be held at the PHMSA Central Region office, 901 Locust Street, Suite 480, Kansas
City, Missouri 64106. Upon arrival at the building, attendees will be required to present photo
identification to security personnel. A contact phone number for the day of the hearing is (816)
329-3800.
At least 10 calendar days prior to the hearing (or by June 5, 2023), both parties must submit and
exchange any additional written materials they intend to present at the hearing and the name and email
address of each attendee. This information should be provided electronically. Materials not submitted
by this date may be excluded. If you have any questions, please do not hesitate to contact me.
Sincerely,
Larry White
Presiding Official



cc: Mr. Aaron Milford, Chief Executive Officer, Magellan Midstream Partners, LP,
aaron.milford@magellanlp.com
Mr. Joseph Hainline, Counsel, Central Region, Office of Pipeline Safety,
joseph.hainline@dot.gov

32022052NOPV_Consent Agreement and Order_05012023_(21-207738)_text.pdf

May 1, 2023
VIA ELECTRONIC MAIL TO: aaron.milford@magellanlp.com
Aaron L. Milford
Chief Executive Officer
Magellan Midstream Partners, LP
P.O. Box 22186
Tulsa, Oklahoma 74172
CPF No. 3-2022-052-NOPV
Dear Mr. Milford:
Enclosed please find a Consent Order incorporating the terms of the Consent Agreement between
the Pipeline and Hazardous Materials Safety Administration (PHMSA) and Magellan Midstream
Partners, LP, which was executed on April 27, 2023. Service of the Consent Order and Consent
Agreement by electronic mail is deemed effective upon the date of transmission and
acknowledgement of receipt, or as otherwise provided under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Alan K. Mayberry
Associate Administrator
for Pipeline Safety
Enclosure: Consent Order and Consent Agreement
cc: Mr. Gregory Ochs, Director, Central Region, Office of Pipeline Safety, PHMSA
Mr. R. Daniel Scroggins, Senior Attorney, Magellan Midstream Partners, L.P.,
danny.scroggins@magellanlp.com
CONFIRMATION OF RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
____________________________________
In the Matter of )
Magellan Midstream Partners, LP, ) CPF No. 3-2022-052-NOPV
)
)
)
Respondent. )
____________________________________)
CONSENT ORDER
By letter dated November 10, 2022, the Pipeline and Hazardous Materials Safety Administration
(PHMSA), Office of Pipeline Safety (OPS), issued a Notice of Probable Violation, Proposed
Civil Penalty, and Proposed Compliance Order (Notice) to Magellan Midstream Partners, LP
(Magellan or Respondent).
In response to the Notice, Respondent requested a hearing by letter dated January 23, 2023
(Response). Magellan contested the underlying violations and proposed compliance order for
Items 1 and 3, and the proposed civil penalty for Item 2. Respondent did not contest Items 4 and
5. Magellan also asked for the opportunity to meet informally with PHMSA to discuss these
issues. Respondent and PHMSA (the Parties) subsequently met to discuss the issues raised in the
Response. As a result of those discussions, as explained in more detail below, the Parties have
agreed to a Consent Agreement in which PHMSA has agreed to:
• for Item 1 find the violation as alleged and find the proposed compliance order terms are
satisfied;
• for Item 2 find the violation as alleged, assess a reduced civil penalty, and issue a
compliance order as proposed;
• for Item 3 withdraw the Item in its entirety, to include its associated compliance order;
• for Item 4 find the violation as alleged and assess a civil penalty as proposed; and
• for Item 5 issue a warning as proposed.
The adjusted total civil penalty is $53,500.
Accordingly, the Consent Agreement is hereby approved and incorporated by reference into this
Consent Order. Magellan is hereby ordered to comply with the terms of the Consent Agreement
pursuant to its terms. Pursuant to 49 U.S.C. § 60101, et seq., failure to comply with this Consent
Order may result in the assessment of civil penalties as set forth in 49 U.S.C. § 60122 and 49
C.F.R. § 190.223.



The terms and conditions of this Consent Order are effective upon service in accordance with
49 C.F.R. § 190.5.
May 1, 2023
___________________________ ______________________
Alan K. Mayberry Date Issued
Associate Administrator
for Pipeline Safety



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
____________________________________
In the Matter of )
Magellan Midstream Partners, LP, ) CPF No. 3-2022-052-NOPV
)
)
)
Respondent. )
____________________________________)
CONSENT AGREEMENT
From March 21 through October 22, 2021, representatives of the Pipeline and Hazardous
Materials Safety Administration (PHMSA), Office of Pipeline Safety (OPS), pursuant to Chapter
601 of 49 United States Code (U.S.C.), inspected Magellan Midstream Partners, LP’s (Magellan
or Respondent) petroleum pipeline facilities in Tulsa and Shinn Pence, Oklahoma, and
Cheyenne, Wyoming. Magellan’s refined product pipeline system is 9,800 miles with 54
connected terminals and two marine storage terminals. Its crude oil pipeline system is 2,200
miles with a condensate splitter and storage facility capacity of approximately 39 million barrels.
As a result of the inspection, the Director, Central Region, OPS (Director), issued to Respondent,
by letter dated November 10, 2022, a Notice of Probable Violation, Proposed Compliance Order
and Proposed Civil Penalty (Notice), which also included a warning pursuant to 49 C.F.R. §
190.205. In accordance with 49 C.F.R. § 190.207, the Notice proposed finding that Magellan
committed one violation of 49 C.F.R. part 194 (Item 1) and three violations of 49 C.F.R. part 195
(Items 2-4), proposed ordering Respondent to take certain measures to correct the alleged
violations, and proposed a civil penalty of $122,600. The other probable violation (Item 5) was
brought as warning, advising the operator to correct the probable violation or face potential
future enforcement action.
Magellan responded to the Notice by letter dated January 23, 2023 (Response). The company
contested the underlying violations and proposed compliance order for Items 1 and 3, and the
proposed civil penalty for Item 2. Respondent did not contest Items 4 and 5.
PHMSA and Respondent (the Parties) subsequently met to discuss the issues raised in the
Response. As a result of those discussions and as explained in more detail below, PHMSA has
agreed to:
• for Item 1 find the violation as alleged and find the proposed compliance order terms are
satisfied;
• for Item 2 find the violation as alleged, assess a reduced civil penalty, and issue a
compliance order as proposed;



• for Item 3 withdraw the Item in its entirety, to include its associated compliance order;
• for Item 4 find the violation as alleged and assess a civil penalty as proposed; and
• for Item 5 issue a warning as proposed
The adjusted total civil penalty is $53,500.
Having agreed that settlement of this proceeding will avoid further administrative proceedings or
litigation and will serve the public interest by promoting safety and protection of the
environment, pursuant to 49 U.S.C. § 60101, et seq. and 49 C.F.R. Part 190, and upon consent
and agreement, the Parties hereby agree as follows:
I. General Provisions
1. Respondent acknowledges that as the operator of the pipeline facilities subject to
the Notice, Respondent and its referenced pipeline facilities are subject to the jurisdiction of the
Federal pipeline safety laws, 49 U.S.C. § 60101, et seq., and the regulations and administrative
orders issued thereunder. For purposes of this Consent Agreement (Agreement), Respondent
acknowledges that it received proper notice of PHMSA’s action in this proceeding and that the
Notice states claims upon which relief may be granted pursuant to 49 U.S.C. § 60101, et seq.,
and the regulations and orders issued thereunder.
2. After Respondent returns this signed Agreement to PHMSA, the Agency’s
representative will present it to the Associate Administrator for Pipeline Safety, recommending
that the Associate Administrator adopt the terms of this Agreement by issuing an administrative
order (Consent Order) incorporating the terms of this Agreement. The terms of this Agreement
constitute an offer of settlement until accepted by the Associate Administrator. Once accepted,
the Associate Administrator will issue a Consent Order incorporating the terms of this Agreement.
3. Respondent consents to the issuance of the Consent Order, and hereby waives any
further procedural requirements with respect to its issuance. Respondent waives all rights to
contest the adequacy of notice, or the validity of the Consent Order or this Agreement, including
all rights to administrative or judicial hearings or appeals, except for the Dispute Resolution
provisions set forth herein. Respondent agrees to withdraw its request for an administrative
hearing regarding the Notice.
4. This Agreement shall apply to and be binding upon PHMSA and Respondent, its
officers, directors, and employees, and its successors, assigns, or other entities or persons
otherwise bound by law. Respondent agrees to provide a copy of this Agreement and any
incorporated work plans and schedules to all of Respondent’s officers, employees, and agents
whose duties might reasonably include compliance with this Agreement.
5. This Agreement constitutes the final, complete and exclusive agreement and
understanding between the Parties with respect to the settlement embodied in this Agreement.
The Parties acknowledge that there are no representations, agreements or understandings relating
to settlement other than those expressly contained in this Agreement, except that the terms of this
Agreement may be construed by reference to the Notice.



6. Nothing in this Agreement affects or relieves Respondent of its responsibility to
comply with all applicable requirements of the Federal pipeline safety laws, 49 U.S.C. § 60101,
et seq., and the regulations and orders issued thereunder. Nothing in this Agreement alters
PHMSA's right of access, entry, inspection, and information gathering or PHMSA's authority to
bring enforcement actions against Respondent pursuant to the Federal pipeline safety laws, the
regulations and orders issued thereunder, or any other provision of Federal or State law.
7. For all transfers of ownership or operating responsibility of Respondent’s pipeline
system referenced herein, Respondent will provide a copy of this Agreement to the prospective
transferee at least 30 days prior to such transfer. Respondent will provide written notice of the
transfer to the Director no later than 60 days after the transfer occurs.
8. This Agreement does not waive or modify any Federal, State, or local laws or
regulations that are applicable to Respondent’s pipeline systems. This Agreement is not a
permit, or a modification of any permit, under any Federal, State, or local laws or regulations.
Respondent remains responsible for achieving and maintaining compliance with all applicable
Federal, State, and local laws, regulations and permits.
9. This Agreement does not create rights in, or grant any cause of action to, any third
party not party to this Agreement. The U.S. Department of Transportation is not liable for any
injuries or damages to persons or property arising from acts or omissions of Respondent or its
officers, employees, or agents carrying out the work required by this Agreement. Respondent
agrees to hold harmless the U.S. Department of Transportation, its officers, employees, agents,
and representatives from any and all causes of action arising from any acts or omissions of
Respondent or its contractors in carrying out any work required by this Agreement.
10. Except as set forth herein, this Agreement does not constitute a finding of
violation of any other federal law or regulation and may not be used in any civil proceeding of
any kind as evidence or proof of any fact, fault or liability, or as evidence of a violation of any
law, rule, regulation, or requirement, except in a proceeding to enforce the provisions of this
Agreement or in future PHMSA enforcement actions.
11. Upon issuance of the Consent Order, the Parties agree to the following terms.
II. Findings of Violation:
12. Item 1 – 49 C.F.R. § 194.105(b)(4): The Notice alleged that Magellan failed to
provide the methodology, including calculations, it used to arrive at the claimed prevention
credits for breakout tank secondary containment and other specific spill prevention measures
when determining the worst-case discharge. Specifically, Respondent, at the time of the
inspection, only presented the total containment of the diking certified by a third-party
Professional Engineer, which did not verify the secondary containment capacity. Following
informal discussion, Magellan no longer disputes this allegation of violation. As such, PHMSA
finds a violation of 49 C.F.R. § 194.105(b)(4).
13. Item 2 – 49 C.F.R. § 195.406(b): The Notice alleged that Magellan failed to
provide adequate controls and protective equipment to control the operating pressure of the



pipeline system to prevent it from exceeding 110 percent of the maximum operating pressure
(MOP) established under § 195.406(a) during surges or other variations from normal operations.
Specifically, on June 9, 2020, the MPC – Glenpool OK West pipeline was documented to exceed
400 psig, which exceeded 110 percent of the 275 psig MOP. Respondent does not contest the
allegation of violation as alleged in the Notice. As such, PHMSA finds a violation of 49 C.F.R. §
195.406(b).
14. Item 4 – 49 C.F.R. § 195.583(a): The Notice alleged that Magellan failed to
monitor for atmospheric corrosion of onshore pipelines by inspecting each pipeline or portion of
pipeline that was exposed to the atmosphere for evidence of atmospheric corrosion at least once
every three calendar years, but with intervals not exceeding 39 months. Specifically, the Rapid
City Lateral 6-inch line, Mile Post 186.23 gravitometer location did not receive an atmospheric
corrosion inspection in its history, prior to July 15, 2021. Respondent does not contest the
allegation of violation as alleged in the Notice. As such, PHMSA finds a violation of 49 C.F.R. §
195.583(a).
15. Items 1, 2, and 4, will be considered by PHMSA as prior offenses in any future
PHMSA enforcement action taken against Respondent for the five (5)-year period following the
Effective Date of this Agreement.
III. Warning Item:
16. Item 5 – 49 C.F.R. § 195.583(b): The Notice alleged that Magellan failed to give
particular attention to pipe under thermal insulation during inspections to monitor for
atmospheric corrosion at three locations. Specifically, the Notice alleged that particular attention
was not given to pipe at Strouds Station, Douglas Junction, and Rapid City Station. This Item
was brought as a warning Item and does not constitute a finding of violation. Respondent accepts
the warning as alleged in the Notice.
17. For Warning Item 5, if OPS finds a violation of this provision in a subsequent
inspection, Respondent may be subject to future enforcement action.
IV. Items Withdrawn:
18. Item 3 – 49 C.F.R. § 195.452(i)(2)(vi): With respect to Item 3 of the Notice, the
Parties agree that this Item should be withdrawn in its entirety. During informal discussion,
Respondent provided evidence showing it considered the roadside ditch alongside the Commerce
City to Russellville six-inch pipeline near Mile Post 0.2, which shows that Magellan was not out
of compliance with the regulation. Because this Item will be withdrawn, it will not constitute a
finding of violation for any purpose, and no further action by Respondent is necessary to achieve
compliance. As such, the allegation of violation for Item 3 and the proposed compliance order
associated with this Item is withdrawn.
V. Civil Penalty:
19. Item 2 – 49 C.F.R. § 195.406(b): The Notice proposed assessing a civil penalty in
the amount of $103,600 for Item 2. Respondent requested a reduction of the proposed civil



penalty. After consideration of additional information provided by Respondent, PHMSA agrees
to reduce the civil penalty. The reduction is based on determination that the violation was not a
repeat offense. Respondent agrees to pay a reduced civil penalty in the amount of $34,500 for
the violation in Item 2.
20. Item 4 – 49 C.F.R. § 195.583(a): The Notice proposed assessing a civil penalty in
the amount of $19,000 for Item 4. Respondent did not contest the proposed civil penalty for this
Item. As such, Respondent shall pay a civil penalty in the amount of $19,000 for Item 4.
21. Respondent shall pay an adjusted civil penalty in the amount of $53,500, pursuant
to the payment instructions at 49 C.F.R. § 190.227(a), to be paid in full no later than 20 days
from the Effective Date of this Agreement.
VI. Compliance Order:
22. Item 1 – 49 C.F.R. § 194.105(b)(4): The Notice proposed certain compliance
order actions to address the non-compliance alleged in the Notice. Since issuance of the Notice,
Magellan took remedial actions to address the alleged violation. As such, PHMSA finds the
terms required by the proposed compliance order satisfied. Therefore, it is not necessary to
include the proposed compliance terms in this Consent Agreement.
23. Item 2 – 49 C.F.R. § 195.406(b): The Notice proposed certain compliance order
actions to address the non-compliance alleged in the Notice. Respondent did not contest the
Proposed Compliance Order. As such, Respondent agrees to perform the following corrective
measures:
Magellan Midstream Partners, LP, must provide, within 90 days of receipt
of the Consent Order, measures to ensure proper pressure controls and protective
equipment are installed for the entire MPC – Glenpool OK West Station,
especially for piping that is not equipped with pressure transmitters or pressure
gauges to stop future pressure exceedances. Within 60 days of completion of the
required corrective measures, Magellan Midstream Partners, L.P., must submit
documentation of their completion to the Director.
24. Item 3 – 49 C.F.R. § 195.452(i)(2)(vi): The Notice proposed certain compliance
order actions to address the non-compliance alleged in the Notice. As discussed above, PHMSA
has agreed to withdraw this allegation of violation. As such, PHMSA also withdraws the
proposed compliance order associated with this Item.
VII. Enforcement:
25. This Agreement is subject to all enforcement authorities available to PHMSA
under 49 U.S.C. § 60101, et seq., and 49 C.F.R. Part 190, including administrative civil penalties
under 49 U.S.C. § 60122, of up to $257,664 per violation for each day the violation continues and
referral of the case to the Attorney General for judicial enforcement, if PHMSA determines that
Respondent is not complying with the terms of this Agreement in accordance with the
determinations made by the Director, or in accordance with decisions of the Associate



Administrator if resolved pursuant to the Dispute Resolution process herein. The maximum civil
penalty amounts are adjusted annually for inflation. See 49 C.F.R. § 190.223.
VIII. Dispute Resolution:
26. The Director and Respondent will informally attempt to resolve any disputes
arising under this Agreement, including any decision of the Director under the terms of Section
VI. Compliance Order. If Respondent and the Director are unable to informally resolve the
dispute within 15 calendar days after the dispute is first raised, in writing, to the Director,
Respondent may submit a written request for a determination resolving the dispute from the
Associate Administrator for Pipeline Safety, PHMSA. Such request must be made in writing and
provided to the Director, counsel for the Central Region, and to the Associate Administrator for
Pipeline Safety, no later than 10 calendar days from the 15-day deadline for informal resolution
referenced in this paragraph. Along with its request, Respondent must provide the Associate
Administrator with all information Respondent believes is relevant to the dispute. Decisions of
the Associate Administrator under this paragraph will constitute final agency action. The
existence of a dispute and PHMSA’s consideration of matters placed in dispute will not excuse,
toll, or suspend any term or timeframe for completion of any work to be performed under this
Agreement during the pendency of the dispute resolution process.
IX. Effective Date:
27. The term “Effective Date,” as used herein, is the date on which the Consent Order
is issued by the Associate Administrator, PHMSA, incorporating the terms of this Agreement.
X. Recordkeeping and Information Disclosure:
28. Unless otherwise required in this Agreement, Respondent agrees to maintain
records demonstrating compliance with all requirements of this Agreement for a period of at
least five (5) years following completion of all work to be performed. For any reports, plans, or
other deliverables required to be submitted to PHMSA pursuant to this Agreement, Respondent
may assert a claim of business confidentiality or other protections applicable to the release of
information by PHMSA, covering part or all of the information required to be submitted to
PHMSA pursuant to this Agreement in accordance with 49 C.F.R. Part 7. Respondent must
mark the claim of confidentiality in writing on each page, and include a statement specifying the
grounds for each claim of confidentially. PHMSA determines release of any information
submitted pursuant to this Agreement in accordance with 49 C.F.R. Part 7, the Freedom of
Information Act, 5 U.S.C. § 552, DOT and PHMSA policies, and other applicable regulations
and Executive Orders.
XI. Modification:
29. The terms of this Agreement may be modified by mutual agreement of the Parties.
Such modifications must be in writing and signed by both parties.
XII. Termination:



30. This Agreement will remain in effect until the Compliance Order in Section VI. is
satisfied, as determined by the Director, and the Civil Penalty in Section V. is paid. The
Agreement shall not terminate until the Director confirms, in writing, that the Agreement is
terminated in accordance with this paragraph. Nothing in this Agreement prevents Respondent
from completing any of the obligations earlier than the deadlines provided for in this Agreement.
XIII. Ratification:
31. The Parties’ undersigned representatives certify that they are fully authorized to
enter into the terms and conditions of this Agreement and to execute and legally bind such party
to this document.
32. The Parties hereby agree to all findings, conditions, and terms of this Agreement.
[Signature Lines on Following Page]



For Magellan Midstream Partners, LP:
___________________________________
________________________
Date
For PHMSA:
_____________________________________________
Director, Central Region, Office of Pipeline Safety
________________________
Date

32022052NOPV_Closure Letter_09182023_(21-207738)_text.pdf

VIA ELECTRONIC MAIL TO: aaron.milford@magellanlp.com;
katie.mccullough@magellanlp.com; mark.materna@magellanlp.com
September 18, 2023
Aaron L. Milford
Chief Executive Officer
Magellan Midstream Partners, LP
P.O. Box 22186
Tulsa, Oklahoma 74172
RE: CPF 3-2022-052-NOPV
Dear Mr. Milford:
On May 1, 2023, the Pipeline and Hazardous Materials Safety Administration (PHMSA) issued
to Magellan Pipeline Company, LP (Magellan) a Consent Order in the above-referenced case.
This Order included a Compliance Order and Civil Penalty assessment. Based on our review of
the documentation provided and confirmation of payment of the civil penalty, it has been
determined that Magellan has complied with the terms of the Order.
Accordingly, this case is now closed and no further action is contemplated with respect to the
matters involved in this case. Thank you for your cooperation in this matter.
Sincerely,
Gregory A. Ochs
Director, Central Region, Office of Pipeline Safety
Pipeline and Hazardous Materials Safety Administration
cc: Mark Materna, Director, Pipeline Integrity, mark.materna@magellanlp.com
Katie McCullough, P.E. Manager, Integrity Management and Regulatory Compliance,
Katie.McCullough@MagellanLP.com
Jason Smith, Vice President, Asset Integrity, Jason.Smith@magellanlp.com
- **truncated:** false