# ROCKIES EXPRESS PIPELINE LLC — Notice of Probable Violation

- **operation:** document
- **citation:** CPF 32022060NOPV
- **title:** ROCKIES EXPRESS PIPELINE LLC — Notice of Probable Violation
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2022-12-22
- **effective on:** Not available
- **summary:** CLOSED notice of probable violation citing 192.179(a)(4), 192.5(b)(3)(ii), 192.609, 192.905(b)(1).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-32022060nopv.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-32022060nopv.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-32022060nopv
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/32022060NOPV
**body:**

Notice of Probable Violation involving ROCKIES EXPRESS PIPELINE LLC. PHMSA's enforcement data identifies the cited regulations as 192.179(a)(4),  192.5(b)(3)(ii),  192.609,  192.905(b)(1). The case was opened on 2022-12-22 and is reported as closed as of 2026-01-26. Proposed civil penalty: $146,000. Assessed civil penalty: $116,000. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

32022060NOPV_Closure Letter_01262026_(22-237394).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32022060NOPV/32022060NOPV_Closure%20Letter_01262026_(22-237394).pdf

32022060NOPV_Closure Letter_01262026_(22-237394)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32022060NOPV/32022060NOPV_Closure%20Letter_01262026_(22-237394)_text.pdf

32022060NOPV_Consent Agreement and Order_07142023_(22-237394).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32022060NOPV/32022060NOPV_Consent%20Agreement%20and%20Order_07142023_(22-237394).pdf

32022060NOPV_Consent Agreement and Order_07142023_(22-237394)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32022060NOPV/32022060NOPV_Consent%20Agreement%20and%20Order_07142023_(22-237394)_text.pdf

32022060NOPV_Consent Agreement Modification_09152025_(22-237394).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32022060NOPV/32022060NOPV_Consent%20Agreement%20Modification_09152025_(22-237394).pdf

32022060NOPV_Consent Agreement Modification_09152025_(22-237394)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32022060NOPV/32022060NOPV_Consent%20Agreement%20Modification_09152025_(22-237394)_text.pdf

32022060NOPV_Operator Response to Notice and RfH_01232023_(22-237394).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32022060NOPV/32022060NOPV_Operator%20Response%20to%20Notice%20and%20RfH_01232023_(22-237394).pdf

32022060NOPV_Operator Withdrawal of Hearing Request_07142023_(22-237394).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32022060NOPV/32022060NOPV_Operator%20Withdrawal%20of%20Hearing%20Request_07142023_(22-237394).pdf

32022060NOPV_PCP PCO_12222022_(22-237394)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32022060NOPV/32022060NOPV_PCP%20PCO_12222022_(22-237394)_text.pdf

32022060NOPV_PCP_PCO_12222022_(22-237394).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32022060NOPV/32022060NOPV_PCP_PCO_12222022_(22-237394).pdf

32022060NOPV_PHC Hearing Scheduled_03012023_(22-237394).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32022060NOPV/32022060NOPV_PHC%20Hearing%20Scheduled_03012023_(22-237394).pdf

32022060NOPV_PHC Hearing Scheduled_03012023_(22-237394)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32022060NOPV/32022060NOPV_PHC%20Hearing%20Scheduled_03012023_(22-237394)_text.pdf

32022060NOPV_Closure Letter_01262026_(22-237394)_text.pdf

U.S. Department
of Transportation
Pipeline and Hazardous
Materials Safety
Administration
12300 W. Dakota Ave., Suite 340
Lakewood, CO 80228
VIA ELECTRONIC MAIL TO: crystal.heter@tallgrass.com
January 26, 2026
Ms. Crystal Heter
Chief Operating Officer
Tallgrass Energy, LP
370 Van Gordon Street
Lakewood, CO 80228
CPF 3-2022-060-NOPV
Closure Letter
Dear Ms. Heter:
On July 14, 2023, the Pipeline and Hazardous Materials Safety Administration (PHMSA) issued
a Consent Order incorporating the terms of the Consent Agreement between PHMSA and
Tallgrass Energy Partners, LP (Tallgrass or Respondent) in the above-referenced case. On
September 15, 2025, PHMSA and Respondent (the Parties) modified the Consent Agreement by
mutual agreement of the Parties. This modified Consent Agreement included a Compliance
Order requirement for Tallgrass to comply with a Compliance Plan, unless or until the Special
Permit is approved by PHMSA, or PHMSA otherwise finds that the alternative spacing provides
an equivalent level of safety in accordance with 49 CFR 192.179(a).
Per the terms of the modified Consent Agreement, the modified Consent Agreement would
terminate once the Compliance Order in Section V are satisfied. On December 5, 2025, PHMSA
issued a Decision finding that the alternative spacing provides an equivalent level of safety in
accordance with 49 CFR 192.179(a). In addition, as of December 21, 2025, Respondent has
complied with the obligations set forth in the Compliance Plan, thereby satisfying the
Compliance Order in Section V. Accordingly, the modified Consent Agreement is terminated,
and this case is now closed.
Thank you for your cooperation in this matter.



Sincerely,
Dustin Hubbard
Director, Western Region, Office of Pipeline Safety
Pipeline and Hazardous Materials Safety Administration
cc: PHP-60 Compliance Registry
PHP-500 J. Luo (#22-237394)
Danielle Stephens (danielle.stephens@tallgrass.com)
Kale Stanton (kale.stanton@tallgrass.com)
Jay Meyers (jay.meyers@tallgrass.com)
Jarid Kling (jarid.kling@tallgrass.com)
Nicole Longwell (nicole.longwell@tallgrass.com)

32022060NOPV_PHC Hearing Scheduled_03012023_(22-237394)_text.pdf

March 1, 2023
VIA ELECTRONIC MAIL TO: jennifer.eckels@tallgrassenergylp.com and
gregory.ochs@dot.gov
Ms. Jennifer Eckels
Manager – Compliance
Tallgrass Energy, LP
370 Van Gordon Street
Lakewood, CO 80228
Mr. Gregory Ochs
Director, Central Region
Pipeline and Hazardous Materials Safety Administration
901 Locust Street, Suite 480
Kansas City, MO 64106-2641
Re: Notice of Hearing, Tallgrass Interstate Gas Transmission, LLC
CPF No. 3-2022-060-NOPV
Dear Ms. Eckels and Mr. Ochs:
In accordance with 49 C.F.R. § 190.211, an informal hearing will be held regarding the Notice of
Probable Violation, Proposed Civil Penalty, and Proposed Compliance Order issued by the Pipeline and
Hazardous Materials Safety Administration in the above-referenced case. The hearing will take place
on July 18, 2023, beginning at 8:30 a.m. Central Time.
The hearing will be held at the PHMSA Central Region office, 901 Locust Street, Suite 480, Kansas
City, Missouri 64106. Upon arrival at the building, attendees will be required to present photo
identification to security personnel. A contact phone number for the day of the hearing is (816) 329-
3800.
At least 10 calendar days prior to the hearing (or by July 10, 2023), both parties must submit and
exchange any additional written materials they intend to present at the hearing and the name and email
address of each attendee. This information should be provided electronically. Materials not submitted
by this date may be excluded. If you have any questions, please do not hesitate to contact me.
Sincerely,
Larry White
Presiding Official



cc: Mr. Matt Sheehy, President and Chief Executive Officer, Tallgrass Energy, LP,
matt@tallgrassenergylp.com
Mr. Ryan McClure, Counsel, Central Region, Office of Pipeline Safety,
ryan.mcclure@dot.gov

32022060NOPV_Consent Agreement Modification_09152025_(22-237394)_text.pdf

U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
____________________________________
In the Matter of )
Tallgrass Energy, LP, ) CPF No. 3-2022-060-NOPV
)
)
)
Respondent. )
____________________________________)
MODIFICATION TO CONSENT AGREEMENT
From March 4 through July 6, 2022, a representative of the Pipeline and Hazardous Materials
Safety Administration (PHMSA), Office of Pipeline Safety (OPS), pursuant to Chapter 601 of
Title 49, United States Code (U.S.C.), inspected Rockies Express Pipeline, LLC (REX)’s
pipeline facilities in Ohio. REX is a subsidiary of Tallgrass Energy Partners, LP (Tallgrass or
Respondent). REX is a 1,698-mile natural gas pipeline system that spans from Rio Blanco
County, Colorado, to Monroe County, Ohio.
As a result of the inspection, the Director, Central Region, OPS (Director), issued to Respondent,
by letter dated December 22, 2022, a Notice of Probable Violation, Proposed Civil Penalty, and
Proposed Compliance Order (Notice).
On July 12, 2023, PHMSA and Respondent (the Parties) entered into a Consent Agreement
(Agreement) to resolve the Notice. The Agreement was approved by the Associate Administrator
for Pipeline Safety, PHMSA, and incorporated by reference into a Consent Order that was issued
pursuant to 49 CFR § 190.219 on July 14, 2023.
Paragraph 28 of the Agreement states that the Agreement may be modified by mutual agreement
of the Parties and that such modifications must be in writing and signed by both parties.
In accordance with Paragraph 28 of the Agreement, the Parties hereby agree to modify Paragraph
21 of the Agreement. The modification to Paragraph 21 does not otherwise change any of the
other terms of the Agreement, which remain in full force and effect unmodified.
I. Modification:
Paragraph 21 of the Agreement is hereby struck and replaced with the following:



21. Item 2 – 49 CFR § 192.179(a)(4): The Notice proposed a compliance order
action to address the non-compliance alleged in Item 2. As a result of the Parties’ informal
discussions, the Parties have agreed to the following:
A. Special Permit Application, or Alternative Spacing Equivalency
Determination, and Limitations
i. ii. As soon as practicable but no more than 180 days from the Effective Date of
this Agreement, Respondent will apply for a mainline valve spacing special
permit (Special Permit) under 49 CFR § 190.341 to allow for sectionalizing
block valves to be spaced outside of the 10 mile (16 kilometer) spacing
requirement for certain pipeline segments in a Class 1 location as set forth in
49 CFR § 192.179(a)(4).
If approved, the proposed Special Permit conditions shall apply, and the
obligations set forth in Paragraph B will terminate.
iii. Unless or until the Special Permit is approved by PHMSA, or PHMSA
otherwise finds that the alternative spacing provides an equivalent level of
safety in accordance with 49 CFR 192.179(a), Respondent will proceed to
comply with obligations set forth in Par. B.i.a. If the Special Permit is denied
by PHMSA or withdrawn by Respondent, Respondent shall also proceed with
the obligations specified in Par. B.i.b, unless PHMSA otherwise finds that the
alternative spacing provides an equivalent level of safety in accordance with
49 CFR 192.179(a).
iv. If PHMSA finds that the alternative spacing provides an equivalent level of
safety in accordance with 49 CFR 192.179(a), paragraph B is no longer
applicable and paragraph 21 has been deemed satisfied in its entirety.
Respondent reserves the right to seek additional special permits or other
alternatives as provided by applicable laws.
B. Compliance Plan
i. In regard to Item 2 of the Notice, Respondent shall perform the following
actions, subject to the limitations set forth in paragraph A (including if
PHMSA otherwise finds that the alternative spacing provides an equivalent
level of safety in accordance with 49 CFR 192.179(a)), applicable to the area
identified in the Notice with sectionalizing block valves spaced outside of the
10 mile (16 kilometer) spacing requirements of 49 CFR § 192.179(a)(4):
Interim Actions Until the Grant of the Special Permit Application or
Determination that the Alternative Valve Spacing Provides Equivalent
Level of Safety in Accordance with 49 CFR 192.179(a).
v. a.



1. Work Plan. Within 90 days of the Effective Date of this Agreement,
Respondent will prepare and submit for the Director approval a Work Plan
and Schedule to implement the Remedial Measures set forth in paragraph
B.i.a.2, unless and until a Special Permit is granted or PHMSA otherwise finds
that the alternative spacing provides an equivalent level of safety in
accordance with 49 CFR 192.179(a).
2. Remedial Measures.
A. Conduct documented monthly aerial right-of-way patrols.
B. Perform documented leak survey with leak survey equipment at least
twice each calendar year but not to exceed 7-1/2 months.
C. Documented in-line inspection conducted within 18 months of the
Effective Date of this Agreement.
D. A documented close interval survey (CIS) will be conducted within 18
months of the Effective Date of this Agreement.
3. The Work Plan and Schedule required by paragraph B.i.a.1 may not be
implemented until it has been approved, in writing, by the Director.
b. Additional Actions Upon Special Permit Denial or Withdrawal
1. Except where PHMSA otherwise finds that the alternative spacing
provides an equivalent level of safety in accordance with 49 CFR 192.179(a),
in the event the Special Permit is denied or withdrawn, and until Respondent
has installed the valves referenced in B.i.b.2 below, Respondent will continue
to implement remedial measures as set forth in B.i.a.2 as appropriate and
applicable and described in the Work Plan and Schedule pursuant to B.i.a.1 of
this Agreement. The Schedule will be updated as necessary.
2. Within 2 years of the date of denial or withdrawal, Respondent will
determine a suitable location for, and install, the necessary valve(s) to meet
the requirements of 49 CFR § 192.179.
3. Respondent’s obligations under B.i.a will terminate upon installation of
the valves as required by B.i.b.2 or termination of this Agreement.
C. Respondent shall provide status updates to the Director on a quarterly basis
describing the progress on all actions being undertaken pursuant to this Agreement.
D. The Director may grant an extension of time for compliance with any of the terms
of the Agreement upon a written request timely submitted demonstrating good cause for
an extension. The Director shall respond in writing to any such request.



II. Ratification:
1. The Parties’ undersigned representatives certify that they are fully authorized to enter into
the terms and conditions of this modification and to execute and legally bind such party to this
document.
2. The Parties hereby agree to all findings, conditions, and terms of this modification.
[Signature Lines on Following Page]



For Tallgrass Energy, LP:
_______________________________
________________________
Date
For PHMSA:
________________________________________
Director, Western Region, Office of Pipeline Safety
________________________
Date

32022060NOPV_Consent Agreement and Order_07142023_(22-237394)_text.pdf

July 14, 2023
VIA ELECTRONIC MAIL TO: matt@tallgrass.com, jennifer.eckels@tallgrassenergylp.com,
crystal.heter@tallgrassenergylp.com
Matt Sheehy
President and Chief Executive Officer
Tallgrass Energy, LP
370 Van Gordon Street
Lakewood, Colorado 80228
CPF No. 3-2022-060-NOPV
Dear Mr. Sheehy:
Enclosed please find a Consent Order incorporating the terms of the Consent Agreement between the
Pipeline and Hazardous Materials Safety Administration (PHMSA) and Tallgrass Energy, LP, which
was executed on July 12, 2023. Service of the Consent Order and Consent Agreement by electronic
mail is deemed effective upon the date of transmission and acknowledgement of receipt, or as
otherwise provided under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Alan K. Mayberry
Associate Administrator
for Pipeline Safety
Enclosure: Consent Order and Consent Agreement
cc: Mr. Gregory Ochs, Director, Central Region, Office of Pipeline Safety, PHMSA
Ms. Catherine Little, Counsel, Bracewell, catherine.little@bracewell.com
CONFIRMATION OF RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
____________________________________
In the Matter of )
Tallgrass Energy, LP, ) CPF No. 3-2022-060-NOPV
)
)
)
Respondent. )
____________________________________)
CONSENT ORDER
By letter dated December 22, 2023, the Pipeline and Hazardous Materials Safety Administration
(PHMSA), Office of Pipeline Safety (OPS), issued a Notice of Probable Violation, Proposed Civil
Penalty, and Proposed Compliance Order (Notice) to Tallgrass Energy, LP (Tallgrass or Respondent).
In response to the Notice, Respondent requested a hearing on Notice Item 2 in full and Notice Item
4 in part. (Response). Tallgrass did not contest the underlying allegation of violation for Notice
Item 3 but requested a hearing for a reduction of the civil penalty associated with it. Respondent did
not contest Notice Item 1. Tallgrass also asked for the opportunity to meet informally with PHMSA
to discuss Items 2, 3, and 4.
Respondent and PHMSA (the Parties) subsequently met to discuss the issues raised in the Response.
As a result of those discussions, as explained in more detail below, the Parties have agreed to a
Consent Agreement which modifies the required compliance actions for Item 2, reduces the civil
penalty associated with Item 3 to $15,800, withdraws from Item 4 part of the proposed violation and
reduces its civil penalty to $50,100, and finds that the required compliance actions for Items 1 and 4
have been satisfied. The total civil penalty agreed to is $116,000.
Accordingly, the Consent Agreement is hereby approved and incorporated by reference into this
Consent Order. Tallgrass is hereby ordered to comply with the terms of the Consent Agreement
pursuant to its terms. Pursuant to 49 U.S.C. § 60101, et seq., failure to comply with this Consent
Order may result in the assessment of civil penalties as set forth in 49 U.S.C. § 60122 and 49 C.F.R.
§ 190.223, or in referral to the Attorney General for appropriate relief in a district court of the
United States.
The terms and conditions of this Consent Order are effective upon service in accordance with
49 C.F.R. § 190.5.
July 14, 2023
___________________________________ __________________________
Alan K. Mayberry Date Issued
Associate Administrator
for Pipeline Safety



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
____________________________________
In the Matter of )
Tallgrass Energy, LP, ) CPF No. 3-2022-060-NOPV
)
)
)
Respondent. )
____________________________________)
CONSENT AGREEMENT
From March 4 through July 6, 2022, a representative of the Pipeline and Hazardous Materials
Safety Administration (PHMSA), Office of Pipeline Safety (OPS), pursuant to Chapter 601 of 49
United States Code (U.S.C.), inspected Rockies Express Pipeline, LLC (REX) in Ohio. REX is a
subsidiary of Tallgrass Energy Partners, LP1 (Tallgrass or Respondent). REX is a 1,698-mile
natural gas pipeline system that spans from Rio Blanco County, Colorado, to Monroe County,
Ohio, with a capacity of 1.8 billion cubic feet per day.2
As a result of the inspection, the Director, Central Region, OPS (Director), issued to Respondent,
by letter dated December 22, 2022, a Notice of Probable Violation, Proposed Compliance Order,
and Proposed Civil Penalty (Notice). In accordance with 49 C.F.R. § 190.207, the Notice
proposed finding that Respondent committed violations of four provisions of 49 C.F.R. Part 192
(Items 1-4), proposed ordering Respondent to take certain measures to correct the alleged
violations, and proposed a total civil penalty of $146,000.
Tallgrass, on behalf of REX, responded to the Notice by letter dated January 23, 2023
(Response). In its Response, Respondent contested Notice Item 2 in full and Notice Item 4 in
part. Respondent did not contest the underlying allegation of violation for Notice Item 3 but
requested a reduction of the associated civil penalty. Respondent requested a hearing and the
opportunity to meet informally with PHMSA to discuss these items. Respondent did not contest
Notice Item 1.
PHMSA and Respondent (the Parties) subsequently met to discuss the issues raised in the
Response. As a result of those discussions and as explained in more detail below, the Parties
have agreed to a Consent Agreement which modifies the required compliance actions for Item 2,
1 See Rockies Express Pipeline, TALLGRASS ENERGY,
https://pipeline.tallgrassenergylp.com/Pages/Content.aspx?pipeline=501&type=SMRY (last accessed June 26,
2023).
2 Id.



reduces the civil penalty associated with Item 3 to $15,800, withdraws from Item 4 part of the
proposed violation and reduces the associated civil penalty to $50,100, and finds that the
required compliance actions for Items 1 and 4 have been satisfied. The total adjusted civil
penalty agreed to is $116,000.
Having agreed that settlement of this proceeding will avoid further administrative proceedings or
litigation and will serve the public interest by promoting safety and protection of the
environment, pursuant to 49 U.S.C. § 60101, et seq. and 49 C.F.R. Part 190, and upon consent
and agreement, the Parties hereby agree as follows:
I. General Provisions
1. Respondent acknowledges that as the operator of the pipeline facilities subject to
the Notice, Respondent and its referenced pipeline facilities are subject to the jurisdiction of the
Federal pipeline safety laws, 49 U.S.C. § 60101, et seq., and the regulations and administrative
orders issued thereunder. For purposes of this Consent Agreement (Agreement), Respondent
acknowledges that it received proper notice of PHMSA’s action in this proceeding and that the
Notice states claims upon which relief may be granted pursuant to 49 U.S.C. § 60101, et seq.,
and the regulations and orders issued thereunder.
2. After Respondent returns this signed Agreement to PHMSA, the Agency’s
representative will present it to the Associate Administrator for Pipeline Safety, recommending
that the Associate Administrator adopt the terms of this Agreement by issuing an administrative
order (Consent Order) incorporating the terms of this Agreement. The terms of this Agreement
constitute an offer of settlement until accepted by the Associate Administrator. Once accepted,
the Associate Administrator will issue a Consent Order incorporating the terms of this Agreement.
3. Respondent consents to the issuance of the Consent Order, and hereby waives any
further procedural requirements with respect to its issuance. Respondent waives all rights to
contest the adequacy of notice, or the validity of the Consent Order or this Agreement, including
all rights to administrative or judicial hearings or appeals, except for the Dispute Resolution
provisions set forth herein. Respondent agrees to withdraw its request for an administrative
hearing regarding the Notice upon receipt of the signed Agreement.
4. This Agreement shall apply to and be binding upon PHMSA and Respondent, its
officers, directors, and employees, and its successors, assigns, or other entities or persons
otherwise bound by law. Respondent agrees to provide a copy of this Agreement and any
incorporated work plans and schedules to all of Respondent’s officers, employees, and agents
whose duties might reasonably include compliance with this Agreement.
5. This Agreement constitutes the final, complete, and exclusive agreement and
understanding between the Parties with respect to the settlement embodied in this Agreement.
The Parties acknowledge that there are no representations, agreements or understandings relating
to settlement other than those expressly contained in this Agreement, except that the terms of this
Agreement may be construed by reference to the Notice.



6. Nothing in this Agreement affects or relieves Respondent of its responsibility to
comply with all applicable requirements of the Federal pipeline safety laws, 49 U.S.C. § 60101,
et seq., and the regulations and orders issued thereunder. Nothing in this Agreement alters
PHMSA's right of access, entry, inspection, and information gathering or PHMSA's authority to
bring enforcement actions against Respondent pursuant to the Federal pipeline safety laws, the
regulations and orders issued thereunder, or any other provision of Federal or State law.
7. For all transfers of ownership or operating responsibility of Respondent’s pipeline
system referenced herein, Respondent will provide a copy of this Agreement to the prospective
transferee at least 30 days prior to such transfer. Respondent will provide written notice of the
transfer to the Director no later than 60 days after the transfer occurs.
8. This Agreement does not waive or modify any Federal, State, or local laws or
regulations that are applicable to Respondent’s pipeline systems. This Agreement is not a
permit, or a modification of any permit, under any Federal, State, or local laws or regulations.
Respondent remains responsible for achieving and maintaining compliance with all applicable
Federal, State, and local laws, regulations and permits.
9. This Agreement does not create rights in, or grant any cause of action to, any third
party not party to this Agreement. The U.S. Department of Transportation is not liable for any
injuries or damages to persons or property arising from acts or omissions of Respondent or its
officers, employees, or agents carrying out the work required by this Agreement. Respondent
agrees to hold harmless the U.S. Department of Transportation, its officers, employees, agents,
and representatives from any and all causes of action arising from any acts or omissions of
Respondent or its contractors in carrying out any work required by this Agreement.
10. Except as set forth herein, this Agreement does not constitute a finding of
violation of any other federal law or regulation and may not be used in any civil proceeding of
any kind as evidence or proof of any fact, fault or liability, or as evidence of a violation of any
law, rule, regulation, or requirement, except in a proceeding to enforce the provisions of this
Agreement or in future PHMSA enforcement actions.
II. Findings of Violation:
11. Item 1 – 49 C.F.R. § 192.5(b)(3)(ii): The Notice alleged that Respondent failed to
properly identify a Class 3 location along its pipeline because it improperly excluded a building
from its class location analysis, the Monroe Local School Bus Depot which is located within 100
yards of the pipeline and occupied by 20 or more persons on at least 5 days a week for 10 weeks
in any 12-month-period. Following PHMSA’s inspection and prior to receiving the Notice,
Respondent modified its procedures to address the issue identified in the Notice, including
providing additional guidance to field personnel when gathering structure data for class location
analyses and updating its class location analysis to include the Monroe Local School Bus Depot.
Without admission, Respondent did not contest the allegation of violation as alleged in the
Notice. As such, PHMSA finds a violation of 49 C.F.R. § 192.5(b)(3)(ii).
12. Item 2 – 49 C.F.R. § 192.179(a)(4): The Notice alleged that Respondent failed to
space sectionalizing block valves so that each point on the transmission pipeline in a Class 1



location was within 10 miles of a valve. Respondent contested this Item on the basis that the
relevant valves were installed 20 miles apart by the prior owner and operator of REX when
measured by the top-of-ground distance between the valves. Following the Parties’ informal
discussion, Respondent, without admission, agrees to accept the violation as alleged in the Notice.
As such, PHMSA finds a violation of 49 C.F.R. § 192.179(a)(4).
13. Item 3 – 49 C.F.R. § 192.609: The Notice alleged that Respondent failed to
immediately make a study whenever an increase in population density indicated a change in class
location for a segment of an existing steel pipeline operating at hoop stress that is more than 40
percent of SMYS, or indicated that the hoop stress corresponding to the established maximum
allowable operating pressure for a segment of existing pipeline is not commensurate with the
present class location. Without admission, Respondent did not contest the allegation of violation
as alleged in the Notice. As such, PHMSA finds a violation of 49 C.F.R. § 192.609.
14. Item 4 – 49 C.F.R. § 192.905(b)(1): The Notice alleged that Respondent failed to
identify two identified sites: the Rockside Winery and Vineyards and a State Highway Patrol
Office. Respondent contested this Item in part, contesting the allegation that the State Highway
Patrol Office should be classified as an identified site. Respondent did not contest the allegation
as it relates to classification of the Rockside Winery and Vineyard as an identified site. Prior to
receiving the Notice, Respondent incorporated both locations into its High Consequence Area
analysis and 2022 integrity management process. During the Parties’ informal discussion,
Respondent presented information that the State Highway Patrol Office does not meet the criteria
of an identified site as defined by 49 C.F.R. § 192.903. Respondent further provided
documentation showing that, without admission, it had voluntarily incorporated the State Highway
Patrol Office into its High Consequence Area analysis as an interim measure until this matter was
resolved. Based on the information provided, PHMSA agrees to withdraw from Item 4 the
allegation that the State Highway Patrol Office should be classified as an identified site. As such,
PHMSA finds one instance of violation of 49 C.F.R. § 192.905(b)(1) for Item 4.
15. Items 1, 2, 3, and 4 as modified above, will be considered by PHMSA as prior
offenses in any future PHMSA enforcement action taken against Respondent for the five (5)-year
period following the Effective Date of this Agreement.
V. Civil Penalty:
16. Item 1 – 49 C.F.R. § 192.5(b)(3)(ii): The Notice proposed assessing a civil
penalty in the amount of $50,100 for Item 1. Respondent did not contest the proposed civil
penalty for this Item. As such, Respondent shall pay a civil penalty in the amount of $50,100 for
Item 1.
17. Item 3 – 49 C.F.R. § 192.609: The Notice proposed assessing a civil penalty in
the amount of $40,000 for Item 3. Respondent requested a reduction of the proposed civil
penalty in light of the fact that Tallgrass self-identified the relevant structures prior to PHMSA’s
inspection and incorporated them into its 2022 class location and HCA analysis. After
consideration of this additional information, PHMSA agrees to a reduced civil penalty based on



reconsideration of the culpability factor to $15,800. Respondent agrees to pay the reduced civil
penalty of $15,800 for the violation in Item 3.
18. Item 4 – 49 C.F.R. § 192.905(b)(1): The Notice proposed assessing a civil penalty
in the amount of $55,900 for Item 4. For the reasons discussed above in Paragraph 14, PHMSA
reduces the number of instances of violation from two to one. As such, PHMSA reduces the civil
penalty to $50,100, based on the reduction to the number of instances of violation. Tallgrass agrees
to pay the reduced civil penalty of $50,100 for the violation in Item 4.
19. Respondent will pay a total adjusted civil penalty in the amount of $116,000,
pursuant to the payment instructions at 49 C.F.R. § 190.227(a), to be paid in full no later than 20
days from the Effective Date of this Agreement.
V. Compliance Order:
20. Item 1 – 49 C.F.R. § 192.5(b)(3)(ii): The Notice proposed certain compliance
order actions to address the non-compliance alleged in Item 1. Respondent did not contest the
Proposed Compliance Order for Item 1. Respondent submitted revised procedures to PHMSA
which provide additional guidance for when 20 or more people at one time are considered to be
in transit and its full class analysis utilizing its revised procedures. Based upon review of these
records, PHMSA finds that the terms of the compliance order action proposed in the Notice for
Item 1 have been satisfied.
21. Item 2 – 49 C.F.R. § 192.179(a)(4): The Notice proposed a compliance order
action to address the non-compliance alleged in Item 2. As a result of the Parties’ informal
discussions, the Parties have agreed to the following:
A. Special Permit Application and Limitations
As soon as practicable but no more than 180 days from the
Effective Date of this Agreement, Respondent will apply for a
mainline valve spacing special permit (Special Permit) under 49
C.F.R. § 190.341 to allow for sectionalizing block valves to be
spaced outside of the 10 mile (16 kilometer) spacing requirement
for certain pipeline segments in a Class 1 location as set forth in 49
C.F.R. § 192.179(a)(4).
If approved, the proposed Special Permit conditions shall apply,
and the obligations set forth in Paragraph B will terminate.
Unless or until the Special Permit is approved by PHMSA,
Respondent will proceed to comply with the obligations set forth in
Paragraph B.i.a. If the Special Permit is denied by PHMSA or
withdrawn by Respondent, Respondent shall also proceed with the
obligations specified in Paragraph B.i.b.
i. ii. iii.



Respondent reserves the right to seek additional special permits.
iv. B. Compliance Plan
i. In regard to Item 2 of the Notice, Respondent shall perform the
following actions, subject to the limitations set forth in paragraph A, applicable to
the area identified in the Notice with sectionalizing block valves spaced outside of
the 10 mile (16 kilometer) spacing requirements of 49 C.F.R. § 192.179(a)(4):
a. Interim Actions Until the Grant of the Special Permit
Application
1. Work Plan. Within 90 days of the Effective Date of this Agreement,
Respondent will prepare and submit for the Director approval a Work
Plan and Schedule to implement the Remedial Measures set forth in
paragraph B.i.a.2, unless and until a Special Permit is granted.
2. Remedial Measures.
A. Conduct documented monthly aerial right-of-way patrols.
B. Perform documented leak survey with leak survey equipment at
least twice each calendar year but not to exceed 7-1/2 months.
C. Documented in-line inspection conducted within 18 months of
the Effective Date of this Agreement.
D. A documented close interval survey (CIS) will be conducted
within 18 months of the Effective Date of this Agreement.
3. The Work Plan and Schedule required by paragraph B.i.a.1, may not be
implemented until it has been approved, in writing, by the Director.
b. Additional Actions Upon Special Permit Denial or Withdrawal
1. In the event the Special Permit is denied or withdrawn, and until
Respondent has installed the valves referenced in B.i.b.2 below,
Respondent will continue to implement remedial measures as set forth
in B.i.a.2 as appropriate and applicable and described in the Work Plan
and Schedule pursuant to B.i.a.1 of this Agreement. The Schedule will
be updated as necessary.
2. Within 2 years of the date of denial or withdrawal, Respondent will
determine a suitable location for, and install, the necessary valve(s) to
meet the requirements of 49 C.F.R. § 192.179.
3. Respondent’s obligations under B.i.a will terminate upon installation of
the valves as required by B.i.b.2 or termination of this Agreement.



C. Respondent shall provide status updates to the Director on a quarterly
basis describing the progress on all actions being undertaken pursuant to this
Agreement.
D. The Director may grant an extension of time for compliance with any of
the terms of the Agreement upon a written request timely submitted
demonstrating good cause for an extension. The Director shall respond in writing
to any such request.
22. Item 4: The Notice proposed certain compliance order actions to address the non-
compliance alleged in Item 4. For the reasons discussed above in Paragraph 14, PHMSA will
reduce the number of instances of violation from two to one by withdrawing the allegation of
violation with respect to the State Highway Patrol Office. Without admission, Respondent has
voluntarily included this location in its High Consequence Area analysis as an interim measure
until this matter was resolved. Tallgrass did not contest the allegation as it relates to
classification of the Rockside Winery and Vineyard as an identified site. Respondent submitted
revised procedures to PHMSA which provide additional information to address facilities
occupied by persons who are confined, are of impaired mobility, or would be difficult to
evacuate. Respondent has also performed a full high consequence area analysis utilizing the
approved revised procedures and provided its analysis to PHMSA. Based upon review of these
records, PHMSA finds that the terms of the compliance order action proposed in the Notice for
Item 4 have been satisfied.
VI. Enforcement:
23. This Agreement is subject to all enforcement authorities available to PHMSA
under 49 U.S.C. § 60101, et seq., and 49 C.F.R. Part 190, including administrative civil penalties
under 49 U.S.C. § 60122, of up to $239,142 per violation for each day the violation continues and
referral of the case to the Attorney General for judicial enforcement, if PHMSA determines that
Respondent is not complying with the terms of this Agreement in accordance with the
determinations made by the Director, or in accordance with decisions of the Associate
Administrator if resolved pursuant to the Dispute Resolution process herein. The maximum civil
penalty amounts are adjusted annually for inflation. See 49 C.F.R. § 190.223. All work plans and
associated schedules set forth or referenced in Section V are automatically incorporated into this
Agreement and are enforceable in the same manner.
VII. Review and Approval Process:
24. With respect to any submission under Section V (Compliance Order) of this
Agreement that requires the approval of the Director, the Director may: (a) approve, in whole or
in part, the submission; (b) approve the submission on specified, reasonable conditions; (c)
disapprove, in whole or in part, the submission; or (d) any combination of the foregoing. If the
Director approves, approves in part, or approves with conditions, Respondent will take all
actions as approved by the Director, subject to Respondent’s right to invoke the dispute
resolution procedures with respect to any conditions the Director identifies. If the Director
disapproves all or any portion of the submission, the Director will provide Respondent a written



notice of the deficiencies. Respondent will correct all deficiencies within the time specified by
the Director and resubmit it for approval.
VIII. Dispute Resolution:
25. The Director and Respondent will informally attempt to resolve any disputes
arising under this Agreement, including any decision of the Director under the terms of Section
V, Compliance Order. If Respondent and the Director are unable to informally resolve the
dispute within 15 calendar days after the dispute is first raised, in writing, to the Director,
Respondent may submit a written request for a determination resolving the dispute from the
Associate Administrator for Pipeline Safety, PHMSA. Such request must be made in writing and
provided to the Director, counsel for the Central Region, and to the Associate Administrator for
Pipeline Safety, no later than 10 calendar days from the 15-day deadline for informal resolution
referenced in this paragraph. Along with its request, Respondent must provide the Associate
Administrator with all information Respondent believes is relevant to the dispute. Decisions of
the Associate Administrator under this paragraph will constitute final agency action. The
existence of a dispute and PHMSA’s consideration of matters placed in dispute will not excuse,
toll, or suspend any term or timeframe for completion of any work to be performed under this
Agreement during the pendency of the dispute resolution process.
IX. Effective Date:
26. The term “Effective Date,” as used herein, is the date on which the Consent Order
is issued by the Associate Administrator, PHMSA, incorporating the terms of this Agreement.
X. Recordkeeping and Information Disclosure:
27. Unless otherwise required in this Agreement, Respondent agrees to maintain
records demonstrating compliance with all requirements of this Agreement for a period of at
least five (5) years following completion of all work to be performed. For any reports, plans, or
other deliverables required to be submitted to PHMSA pursuant to this Agreement, Respondent
may assert a claim of business confidentiality or other protections applicable to the release of