# TEXAS EASTERN TRANSMISSION, LP — Notice of Probable Violation

- **operation:** document
- **citation:** CPF 32023033NOPV
- **title:** TEXAS EASTERN TRANSMISSION, LP — Notice of Probable Violation
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2023-11-27
- **effective on:** Not available
- **summary:** CLOSED notice of probable violation citing 192.625(a), 192.625(b)(3).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-32023033nopv.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-32023033nopv.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-32023033nopv
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/32023033NOPV
**body:**

Notice of Probable Violation involving TEXAS EASTERN TRANSMISSION, LP. PHMSA's enforcement data identifies the cited regulations as 192.625(a),  192.625(b)(3). The case was opened on 2023-11-27 and is reported as closed as of 2024-10-03. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

32023033NOPV_Closure Letter_10032024_(22-234926).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32023033NOPV/32023033NOPV_Closure%20Letter_10032024_(22-234926).pdf

32023033NOPV_Closure Letter_10032024_(22-234926)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32023033NOPV/32023033NOPV_Closure%20Letter_10032024_(22-234926)_text.pdf

32023033NOPV_Final Order_01292024_(22-234926).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32023033NOPV/32023033NOPV_Final%20Order_01292024_(22-234926).pdf

32023033NOPV_Final Order_01292024_(22-234926)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32023033NOPV/32023033NOPV_Final%20Order_01292024_(22-234926)_text.pdf

32023033NOPV_Operator Response to Notice_12212023_(22-234926).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32023033NOPV/32023033NOPV_Operator%20Response%20to%20Notice_12212023_(22-234926).pdf

32023033NOPV_PCO_11272023_(22-234926).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32023033NOPV/32023033NOPV_PCO_11272023_(22-234926).pdf

32023033NOPV_PCO_11272023_(22-234926)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32023033NOPV/32023033NOPV_PCO_11272023_(22-234926)_text.pdf

32023033NOPV_Closure Letter_10032024_(22-234926)_text.pdf

VIA ELECTRONIC MAIL TO: cynthia.hansen@enbridge.com;
michael.koby@enbridge.com; salima.Abdula@enbridge.com;
October 3, 2024
Cynthia Hansen,
EVP & President
Gas Transmission and Midstream
Enbridge Inc.
915 North Eldridge Parkway, Suite 1100
Houston, TX 77079
RE: CPF 3-2023-033-NOPV
Dear Ms. Hansen:
On January 29, 2024, the Pipeline and Hazardous Materials Safety Administration (PHMSA)
issued to Texas Eastern Transmission, LP, a subsidiary of Enbridge Inc., a Final Order in the
above-referenced case. This Final Order included a Compliance Order. Based on our review of
the documentation provided, it has been determined that you have complied with the terms of the
Final Order.
Accordingly, this case is now closed, and no further action is contemplated with respect to the
matters involved in this case. Thank you for your cooperation in this matter.
Sincerely,
Gregory A. Ochs
Director, Central Region, Office of Pipeline Safety
Pipeline and Hazardous Materials Safety Administration
cc: Michael Koby, SVP & Chief Operations Officer, GTM, Texas Eastern Transmission, LP
(michael.koby@enbridge.com)
Salima Abdulla, Operational Compliance Manager, Texas Eastern Transmission, LP
(salima.Abdula@enbridge.com)

32023033NOPV_Final Order_01292024_(22-234926)_text.pdf

January 29, 2024
VIA ELECTRONIC MAIL TO: cynthia.hansen@enbridge.com
Cynthia Hansen
Executive Vice President and President
Gas Transmission and Midstream
Enbridge Inc.
915 N. Eldridge Parkway, Suite 1100
Houston, Texas 77079
Re: CPF No. 3-2023-033-NOPV
Dear Ms. Hansen:
Enclosed please find the Final Order issued in the above-referenced case to Texas Eastern
Transmission, LP, a subsidiary of Enbridge Inc. It makes a finding of violation and specifies
actions that need to be taken to comply with the pipeline safety regulations. When the terms of
the compliance order are completed, as determined by the Director, Central Region, this
enforcement action will be closed. Service of the Final Order by e-mail is effective upon the
date of transmission and acknowledgement of receipt as provided under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Alan K. Mayberry
Associate Administrator
for Pipeline Safety
Enclosures (Final Order and NOPV)
cc: Mr. Gregory Ochs, Director, Central Region, Office of Pipeline Safety, PHMSA
Mr. Michael Koby, Senior Vice President and Chief Operating Officer, Gas Transmission
and Midstream, Enbridge Inc., michael.koby@enbridge.com



Mr. Peter Seydewitz, Director, Operational Excellence, GTM Engineering & Asset
Management, Enbridge Inc., peter.seydewitz@enbridge.com
Mr. Leo Rosas, Supervisor, Operational Compliance, Enbridge Inc.,
leo.rosasjr@enbridge.com
CONFIMRATION OF RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
____________________________________
)
In the Matter of )
)
Texas Eastern Transmission, LP, ) CPF No. 3-2023-033-NOPV
a subsidiary of Enbridge Inc., )
)
Respondent. )
____________________________________)
FINAL ORDER
On November 27, 2023, pursuant to 49 C.F.R. § 190.207, the Director, Central Region, Office of
Pipeline Safety (OPS), issued a Notice of Probable Violation (Notice) to Texas Eastern
Transmission, LP, a subsidiary of Enbridge Inc. (Respondent). The Notice proposed finding that
Respondent had violated the pipeline safety regulations in 49 C.F.R. Part 192. The Notice also
proposed certain measures to correct the violation. Enbridge responded on behalf of Respondent
and did not contest the allegation of violation or corrective measures.
Based upon a review of all of the evidence, pursuant to § 190.213, I find Respondent violated the
pipeline safety regulations listed below, as more fully described in the enclosed Notice, which is
incorporated by reference:
49 C.F.R. § 192.625(b)(3) (Item 1) ─ Respondent failed to odorize a lateral
pipeline (Line 15-F), located entirely in a Class 3 area, as required.
This finding of violation will be considered a prior offense in any subsequent enforcement action
taken against Respondent.
Compliance Actions
Pursuant to 49 U.S.C. § 60118(b) and 49 C.F.R. § 190.217, Respondent is ordered to take the
actions proposed in the enclosed Notice to correct the violation. The Director may grant an
extension of time to comply with any of the required items upon a written request timely
submitted by the Respondent and demonstrating good cause for an extension. Upon completion
of the ordered actions, Respondent may request that the Director close the case. Failure to
comply with this Order may result in the assessment of civil penalties under 49 C.F.R. § 190.223
or in referral to the Attorney General for appropriate relief in a district court of the United States.



The terms and conditions of this order are effective upon service in accordance with 49 C.F.R.
§ 190.5.
January 29, 2024
___________________________________ _________________________
Alan K. Mayberry Date Issued
Associate Administrator
for Pipeline Safety
- **truncated:** false
- **body characters:** 6682
