# NORTHERN NATURAL GAS CO — Notice of Amendment

- **operation:** document
- **citation:** CPF 32024010NOA
- **title:** NORTHERN NATURAL GAS CO — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2024-02-06
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 192.607(d)(1), 192.607(f), 192.624(c)(1)(ii), 192.624(c)(1)(iii), 192.710(d), 192.917(c).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-32024010noa.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-32024010noa.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-32024010noa
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/32024010NOA
**body:**

Notice of Amendment involving NORTHERN NATURAL GAS CO. PHMSA's enforcement data identifies the cited regulations as 192.607(d)(1),  192.607(f),  192.624(c)(1)(ii),  192.624(c)(1)(iii),  192.710(d),  192.917(c). The case was opened on 2024-02-06 and is reported as closed as of 2024-05-24. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

32024010NOA_Closure Letter_05242024_(23-264235).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32024010NOA/32024010NOA_Closure%20Letter_05242024_(23-264235).pdf

32024010NOA_Closure Letter_05242024_(23-264235)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32024010NOA/32024010NOA_Closure%20Letter_05242024_(23-264235)_text.pdf

32024010NOA_Notice of Amendment_02062024_(23-264235).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32024010NOA/32024010NOA_Notice%20of%20Amendment_02062024_(23-264235).pdf

32024010NOA_Notice of Amendment_02062024_(23-264235)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32024010NOA/32024010NOA_Notice%20of%20Amendment_02062024_(23-264235)_text.pdf

32024010NOA_Operator Response to Notice_02292024_(23-264235).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32024010NOA/32024010NOA_Operator%20Response%20to%20Notice_02292024_(23-264235).pdf

32024010NOA_Closure Letter_05242024_(23-264235)_text.pdf

VIA ELECTRONIC MAIL TO: mark.hewett@nngco.com, thomas.correll@nngco.com;
david.geck@nngco.com;
May 24, 2024
Mr. Mark Hewett
President/CEO
Northern Natural Gas Company
1111 S. 103rd Street
Omaha, NE 68124
RE: CPF No. 3-2024-010-NOA
Dear Mr. Hewett:
From April 10 through May 4, 2023, representatives of the Pipeline and Hazardous Materials
Safety Administration (PHMSA), along with representatives from the Michigan Public Service
Commission, Minnesota Office of Pipeline Safety, and the Iowa Utility Board acting as Interstate
Agents pursuant to Chapter 601 of 49 United States Code (U.S.C.) inspected Northern Natural
Gas Company’s (NNG) procedures for the new gas integrity rule in Omaha, Nebraska. As a
result of the inspection, Northern Natural Gas Company was issued a Notice of Amendment on
February 6, 2024, which proposed amendment of its procedures. Northern Natural Gas Company
submitted its amended procedures on May 2, 2024, which my staff has reviewed and it appears
that the inadequacies outlined in the Notice of Amendment have been corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank you
for your cooperation.
Sincerely,
Gregory A. Ochs
Director, Central Region, OPS
Pipeline and Hazardous Materials Safety Administration
cc: Thomas Correll (thomas.correll@nngco.com)
David Geck (david.geck@nngco.com)
Laura Demman (laura.demman@nngco.com)
Brian Mundt (brian.mundt@nngo.com)

32024010NOA_Notice of Amendment_02062024_(23-264235)_text.pdf

NOTICE OF AMENDMENT
VIA ELECTRONIC MAIL TO: mark.hewett@nngco.com; thomas.correll@nngco.com;
david.geck@nngco.com; john.gormley@nngco.com; Laura.Demman@nngco.com;
Brian.Mundt@nngco.com
February 6, 2024
Mr. Mark Hewett
President & CEO
Northern Natural Gas Company
1111 S. 103rd Street
Omaha, NE 68124
CPF 3-2024-010-NOA
Dear Mr. Hewett:
From April 10 through May 4, 2023, representatives of the Pipeline and Hazardous Materials
Safety Administration (PHMSA), along with representatives from the Michigan Public Service
Commission, Minnesota Office of Pipeline Safety, and the Iowa Utility Board acting as Interstate
Agents, pursuant to Chapter 601 of 49 United States Code (U.S.C.), inspected Northern Natural
Gas Company’s (NNG) procedures for the new gas integrity rule1 in Omaha, Nebraska.
As a result of the inspection, PHMSA has identified the apparent inadequacies found within
NNG’s plans or procedures. The items inspected and the inadequacies are described below:
1 Docket No. PHMSA–2011–0023; Amdt. Nos. 191–26; 192–125 Pipeline Safety: Safety of Gas Transmission
Pipelines: MAOP Reconfirmation, Expansion of Assessment Requirements, and Other Related Amendments



1. 2. 3. § 192.607 Verification of Pipeline Material Properties and Attributes: Onshore steel
transmission pipelines.
(a) . . . .
(d) Special requirements for nondestructive Methods. Procedures developed in
accordance with paragraph (c) of this section for verification of material properties
and attributes using nondestructive methods must:
(1) Use methods, tools, procedures, and techniques that have been validated by a
subject matter expert based on comparison with destructive test results on material
of comparable grade and vintage.
NNG’s procedures did not provide adequate guidance for nondestructive testing in
accordance with the requirements of § 192.607(d)(1). Specifically, NNG’s procedure
80.803 section 3.7 simply repeated the code requirements; it did not include any
specificity or guidance with respect to the types of in-situ tools that would be used and
the proper calibration of such tools.
§ 192.607 Verification of Pipeline Material Properties and Attributes: Onshore steel
transmission pipelines.
(a) . . . .
(f) Components. For mainline pipeline components other than line pipe, an operator
must develop and implement procedures in accordance with paragraph (c) of this
section for establishing and documenting the ANSI rating or pressure rating (in
accordance with ASME/ANSI B16.5 (incorporated by reference, see
§ 192.7)) . . . .
NNG’s procedure 80.803 section 5.3 did not adequately provide guidance for traceable,
verifiable, and complete (TVC) records of components required under § 192.607(f).
While the procedure restated the requirements of the regulation, the procedure did not
specify details such as whether personnel can get TVC information strictly from records,
or whether personnel have to visually inspect the component itself to get the information.
Additionally, for above-ground facilities, such as meter stations and compressor stations,
NNG’s procedures did not define what would be considered a “mainline pipeline
component other than line pipe” for the purpose of compliance with § 192.607(f).
NNG must amend its written procedures to comply with the requirements of §
192.607(f).
§ 192.624 Maximum allowable operating pressure reconfirmation: Onshore steel
transmission pipelines.
(a) . . . .
(c) Maximum allowable operating pressure determination. Operators of a pipeline
segment meeting a condition in paragraph (a) of this section must reconfirm its
MAOP using one of the following methods:
(1) Method 1: Pressure test. Perform a pressure test and verify material



4. properties records in accordance with § 192.607 and the following requirements:
(i) . . . .
(ii) Material properties records. Determine if the following material properties
records are documented in traceable, verifiable, and complete records: Diameter,
wall thickness, seam type, and grade (minimum yield strength, ultimate tensile
strength).
NNG’s procedure 80.801 section 5.3 did not adequately include all of the required
attributes for obtaining TVC information as it pertains to Method 1 under MAOP
reconfirmation as required by § 192.624(c)(1)(ii). Specifically, procedure 80.801 section
5.3.1 indicated that the attributes to be TVC’d include diameter, wall thickness, seam
type, and grade (yield strength). The procedure must also include getting the TVC
records for ultimate tensile strength.
NNG must amend its written procedures to comply with the requirements of §
192.624(c)(1)(ii) in accordance with § 192.605(a).
§ 192.624 Maximum allowable operating pressure reconfirmation: Onshore steel
transmission pipelines.
(a) . . . .
(c) Maximum allowable operating pressure determination. Operators of a pipeline
segment meeting a condition in paragraph (a) of this section must reconfirm its
MAOP using one of the following methods:
(1) Method 1: Pressure test. Perform a pressure test and verify material
properties records in accordance with § 192.607 and the following requirements:
(i) . . . . .
(iii) Material properties verification. If any of the records required by
paragraph (c)(1)(ii) of this section are not documented in traceable, verifiable, and
complete records, the operator must obtain the missing records in accordance with
§ 192.607. An operator must test the pipe materials cut out from the test manifold
sites at the time the pressure test is conducted. If there is a failure during the
pressure test, the operator must test any removed pipe from the pressure test failure
in accordance with § 192.607.
NNG’s procedure 80.801 section 5.3 did not adequately require obtaining TVC
information on a pressure test header for reconfirmation per § 192.624(c)(1)(iii).
Specifically, procedure 80.801 section 5.3.1 indicated that NNG personnel must test pipe
cut out from the pressure test manifold sites in accordance to NNG’s procedure 80.803.
However, procedure 80.803 section 3.1 specified that this only applies to pressure test
headers that are within one mile of the pipe to be tested. There is no geographic
requirement for testing the pressure test manifold as required in § 192.624(c)(1)(iii) and
therefore, NNG’s one mile limitation should be removed from its procedures.
NNG must amend its written procedures to comply with the requirements of §
192.624(c)(1)(iii) in accordance with § 192.605(a).



5. 6. § 192.710 Transmission lines: Assessments outside of high consequence areas.
(a) . . . .
(d) Data analysis. An operator must analyze and account for the data obtained from
an assessment performed under paragraph (c) of this section to determine if a
condition could adversely affect the safe operation of the pipeline using personnel
qualified by knowledge, training, and experience. In addition, when analyzing inline
inspection data, an operator must account for uncertainties in reported results (e.g.,
tool tolerance, detection threshold, probability of detection, probability of
identification, sizing accuracy, conservative anomaly interaction criteria, location
accuracy, anomaly findings, and unity chart plots or equivalent for determining
uncertainties and verifying actual tool performance) in identifying and
characterizing anomalies.
NNG’s procedures for data analysis did not provide adequate guidance on how NNG
integrates the information from the assessments performed in locations outside of a high
consequence area (HCA) as required by § 192.710(d). Specifically, NNG’s procedure
140.201 section 5.2 only provided a basic overview of NNG’s process for data
integration. NNG did not provide specifics for how to perform data integration and the
procedure did not include a process for graphically integrating all data. During PHMSA’s
inspection, NNG’s personnel verbally explained to PHMSA representatives NNG’s
actual detailed data integration process, but none of what was verbally described was
included in the written procedure.
NNG must amend its written procedures to comply with the requirements of § 192.710(d)
in accordance with § 192.605(a).
§ 192.917 How does an operator identify potential threats to pipeline integrity and
use the threat identification in its integrity program?
(a) . . . .
(c) Risk assessment. An operator must conduct a risk assessment that follows
ASME/ANSI B31.8S, section 5, and considers the identified threats for each covered
segment. An operator must use the risk assessment to prioritize the covered
segments for the baseline and continual reassessments (§§ 192.919, 192.921,
192.937), and to determine what additional preventive and mitigative measures are
needed (§ 192.935) for the covered segment….
NNG’s risk model prioritizing moderate consequence areas (MCAs) and HCAs did not
adequately consider the identified threats for each covered segment, per § 192.917(c).
Specifically, the weighting factors used to determine risk for two threats (internal
corrosion and stress corrosion cracking) were assigned abnormally low weights in the
model which were not technically justified. This is an issue because if a failure occurred
due to either of those risks, the risk model ranking would not be affected.
NNG must amend its written risk assessment procedures and re-run the risk model to also



amend the written baseline assessment schedule for MCAs to comply with the
requirements of § 192.917(c) in accordance § 192.907(a), which requires implementation
of Subpart O, and §192.911, which provides the elements of an integrity management
program.
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.206. Enclosed as
part of this Notice is a document entitled Response Options for Pipeline Operators in
Enforcement Proceedings.
Please refer to this document and note the response options. Be advised that all material you
submit in response to this enforcement action is subject to being made publicly available. If you
believe that any portion of your responsive material qualifies for confidential treatment under 5
U.S.C. § 552(b), along with the complete original document you must provide a second copy of
the document with the portions you believe qualify for confidential treatment redacted and an
explanation of why you believe the redacted information qualifies for confidential treatment
under 5 U.S.C. § 552(b).
Following the receipt of this Notice, you have 30 days to submit written comments, revised
procedures, or a request for a hearing under § 190.211. If you do not respond within 30 days of
receipt of this Notice, this constitutes a waiver of your right to contest the allegations in this
Notice and authorizes the Associate Administrator for Pipeline Safety to find facts as alleged in
this Notice without further notice to you and to issue an Order Directing Amendment. If your
plans or procedures are found inadequate as alleged in this Notice, you may be ordered to amend
your plans or procedures to correct the inadequacies (49 C.F.R. § 190.206). If you are not
contesting this Notice, we propose that you submit your amended procedures to my office within
90 days of receipt of this Notice. This period may be extended by written request for good cause.
Once the inadequacies identified herein have been addressed in your amended procedures, this
enforcement action will be closed.
It is requested (not mandated) that NNG maintain documentation of the safety improvement
costs associated with fulfilling this Notice of Amendment (preparation/revision of plans,
procedures) and submit the total to Gregory A Ochs, Director, Central Region, Pipeline and
Hazardous Materials Safety Administration. In correspondence concerning this matter, please
refer to CPF 3-2024-010-NOA and, for each document you submit, please provide a copy in
electronic format whenever possible.
Sincerely,
Gregory A. Ochs
Director, Central Region
Pipeline and Hazardous Materials Safety Administration
Enclosure: Response Options for Pipeline Operators in Enforcement Proceedings



cc: David Geck (david.geck@nngco.com)
Thomas Correll (thomas.correll@nngco.com)
John Gormley (john.gormley@nngco.com)
Laura Demman (laura.demman@nngco.com)
Brian Mundt (brian.mundt@nngo.com)
- **truncated:** false
- **body characters:** 15122