# NORTHERN NATURAL GAS CO — Notice of Probable Violation

- **operation:** document
- **citation:** CPF 32024012NOPV
- **title:** NORTHERN NATURAL GAS CO — Notice of Probable Violation
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2024-02-06
- **effective on:** Not available
- **summary:** CLOSED notice of probable violation citing 192.5(b)(3)(ii), 192.605(a), 192.710(b)(1).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-32024012nopv.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-32024012nopv.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-32024012nopv
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/32024012NOPV
**body:**

Notice of Probable Violation involving NORTHERN NATURAL GAS CO. PHMSA's enforcement data identifies the cited regulations as 192.5(b)(3)(ii),  192.605(a),  192.710(b)(1). The case was opened on 2024-02-06 and is reported as closed as of 2025-03-11. Proposed civil penalty: $68,800. Assessed civil penalty: $68,800. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

32024012NOPV_Closure Letter_03112025_(23-264235).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32024012NOPV/32024012NOPV_Closure%20Letter_03112025_(23-264235).pdf

32024012NOPV_Closure Letter_03112025_(23-264235)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32024012NOPV/32024012NOPV_Closure%20Letter_03112025_(23-264235)_text.pdf

32024012NOPV_Final Order_04052024_(23-264235).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32024012NOPV/32024012NOPV_Final%20Order_04052024_(23-264235).pdf

32024012NOPV_Final Order_04052024_(23-264235)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32024012NOPV/32024012NOPV_Final%20Order_04052024_(23-264235)_text.pdf

32024012NOPV_Operator Response to Notice_02292024_(23-264235).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32024012NOPV/32024012NOPV_Operator%20Response%20to%20Notice_02292024_(23-264235).pdf

32024012NOPV_PCP PCO_02062024_(23-264235).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32024012NOPV/32024012NOPV_PCP%20PCO_02062024_(23-264235).pdf

32024012NOPV_PCP PCO_02062024_(23-264235)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32024012NOPV/32024012NOPV_PCP%20PCO_02062024_(23-264235)_text.pdf

32024012NOPV_Closure Letter_03112025_(23-264235)_text.pdf

VIA ELECTRONIC MAIL TO: mark.hewett@nngco.com; thomas.correll@nngco.com;
Brian.Mundt@nngco.com
March 11, 2025
Mr. Mark Hewett
President & CEO
Northern Natural Gas Company
1111 S. 103rd Street
Omaha, Nebraska 68124
RE: CPF 3-2024-012-NOPV
Dear Mr. Hewett:
On April 5, 2024, the Pipeline and Hazardous Materials Safety Administration (PHMSA) issued
to Northern Natural Gas Company (NNG) a Final Order pursuant to 49 CFR § 190.213. This
Order included a Compliance Order and Civil Penalty assessment. Based on our review of the
documentation provided and confirmation of payment of the civil penalty, it has been determined
that NNG has complied with the terms of this Order.
Accordingly, this case is now closed, and no further action is contemplated with respect to the
matters involved in this case. Thank you for your cooperation in this matter.
Sincerely,
Gregory A. Ochs
Director, Central Region, Office of Pipeline Safety
Pipeline and Hazardous Materials Safety Administration
cc: Brian Mundt, VP Operations, NNG, brian.mundt@nngco.com
Thomas Correll, Director, Pipeline Safety, NNG, thomas.correll@nngco.com

32024012NOPV_Final Order_04052024_(23-264235)_text.pdf

April 5, 2024
VIA ELECTRONIC MAIL TO: mark.hewett@nngco.com
Mr. Mark Hewett
President and Chief Executive Officer
BHE Pipeline Group
1111 South 103rd Street
Omaha, Nebraska 68124
Re: CPF No. 3-2024-012-NOPV
Dear Mr. Hewett:
Enclosed please find the Final Order issued in the above-referenced case. It makes findings of
violation, finds that the civil penalty amount of $68,800 has been paid in full, and specifies
actions that need to be taken to comply with the pipeline safety regulations. When the terms of
the compliance order are completed, as determined by the Director, Central Region, this
enforcement action will be closed. Service of the Final Order by e-mail is effective upon the
date of transmission and acknowledgement of receipt as provided under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Alan K. Mayberry
Associate Administrator
for Pipeline Safety
Enclosures (Final Order and NOPV)
cc: Mr. Gregory Ochs, Director, Central Region, Office of Pipeline Safety, PHMSA
Ms. Laura Demman, President, Northern Natural Gas Co., laura.demman@nngco.com
Mr. Brian Mundt, Vice President of Operations, Northern Natural Gas Co.,
brian.mundt@nngo.com
Mr. Thomas Correll, Vice President, Pipeline Safety and Risk, Northern Natural Gas Co.,
thomas.correll@nngco.com
CONFIRMATION OF RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
__________________________________________
In the Matter of )
Northern Natural Gas Company, ) CPF No. 3-2024-012-NOPV
a subsidiary of Berkshire Hathaway )
Energy Company, )
)
)
)
Respondent. )
__________________________________________)
FINAL ORDER
On February 6, 2024, pursuant to 49 C.F.R. § 190.207, the Director, Central Region, Office of
Pipeline Safety (OPS), issued a Notice of Probable Violation (Notice) to Northern Natural Gas
Company (Respondent). The Notice proposed finding that Respondent had violated the pipeline
safety regulations in 49 C.F.R. Part 192. The Notice also proposed certain measures to correct
the violations. Respondent did not contest the allegations of violation or corrective measures,
provided additional information, and paid the proposed civil penalty on March 5, 2024.
Based upon a review of all of the evidence, pursuant to § 190.213, I find Respondent violated the
pipeline safety regulations listed below, as more fully described in the enclosed Notice, which is
incorporated by reference:
49 C.F.R. § 192.5(b)(3)(ii) (Item 1) ─ Respondent failed to identify three sites
(located in Sartell, MN; Houghton, MI; and Mankato, MN) as class 3 locations.
49 C.F.R. § 192.605(a) (Item 2) ─ Respondent failed to follow its manual of
written procedures as required. Specifically, Respondent failed to follow its
procedure 140.101, section 3.11.3 regarding four initial baseline assessment plans
in moderate consequence areas.
These findings of violation will be considered prior offenses in any subsequent enforcement
action taken against Respondent. In accordance with 49 C.F.R. § 190.223, Respondent is
assessed the proposed civil penalty amount of $68,800, which Respondent has already paid in
full.



Compliance Actions
Pursuant to 49 U.S.C. § 60118(b) and 49 C.F.R. § 190.217, Respondent is ordered to take the
actions proposed in the enclosed Notice to correct the violations. The Director may grant an
extension of time to comply with any of the required items upon a written request timely
submitted by the Respondent and demonstrating good cause for an extension. Upon completion
of the ordered actions, Respondent may request that the Director close the case. Failure to
comply with this Order may result in the assessment of civil penalties under 49 C.F.R. § 190.223
or in referral to the Attorney General for appropriate relief in a district court of the United States.
Warning Item
With respect to Item 3, the Notice alleged a probable violation of 49 C.F.R. § 192.710(b)(1) but
did not propose a civil penalty or compliance order for this item. Therefore, this is considered to
be a warning item. If OPS finds a violation of this provision in a subsequent inspection,
Respondent may be subject to future enforcement action.
The terms and conditions of this order are effective upon service in accordance with 49 C.F.R.
§ 190.5.
April 5, 2024
___________________________________ _________________________
Alan K. Mayberry Date Issued
Associate Administrator
for Pipeline Safety
- **truncated:** false