# SOUTHERN STAR CENTRAL GAS PIPELINE, INC — Notice of Amendment

- **operation:** document
- **citation:** CPF 32024013NOA
- **title:** SOUTHERN STAR CENTRAL GAS PIPELINE, INC — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2024-02-02
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 192.739(a)(2).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-32024013noa.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-32024013noa.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-32024013noa
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/32024013NOA
**body:**

Notice of Amendment involving SOUTHERN STAR CENTRAL GAS PIPELINE, INC. PHMSA's enforcement data identifies the cited regulation as 192.739(a)(2). The case was opened on 2024-02-02 and is reported as closed as of 2024-03-07. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

32024013NOA_Closure Letter_03072024_(22-233365).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32024013NOA/32024013NOA_Closure%20Letter_03072024_(22-233365).pdf

32024013NOA_Closure Letter_03072024_(22-233365)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32024013NOA/32024013NOA_Closure%20Letter_03072024_(22-233365)_text.pdf

32024013NOA_Notice of Amendment_02022024_(22-233365).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32024013NOA/32024013NOA_Notice%20of%20Amendment_02022024_(22-233365).pdf

32024013NOA_Notice of Amendment_02022024_(22-233365)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32024013NOA/32024013NOA_Notice%20of%20Amendment_02022024_(22-233365)_text.pdf

32024013NOA_Notice of Amendment_02022024_(22-233365)_text.pdf

NOTICE OF AMENDMENT
VIA ELECTRONIC MAIL TO: shawn.patterson@southernstar.com;
craig.thomas@southernstar.com
February 2, 2024
Shawn Patterson
President and CEO
Southern Star Central Gas Pipeline, Inc.
4700 State Route 56
Owensboro, KY 42301
CPF No. 3-2024-013-NOA
Dear Mr. Patterson:
From March 2 through September 30, 2022, a representative of the Pipeline and Hazardous
Materials Safety Administration (PHMSA), Office of Pipeline Safety (OPS), pursuant to Chapter
601 of 49 United States Code (U.S.C.), conducted on-site inspections of Southern Star Central
Gas Pipeline, Inc.’s (Southern Star) natural gas transmission pipelines and facilities located in
the states of Oklahoma, Missouri, Kansas, Texas, Nebraska, Colorado, and Wyoming.
As a result of the inspection, PHMSA has identified the apparent inadequacy found within
Southern Star’s plans or procedures. The item inspected and the inadequacy is described below:
1. § 192.739 Pressure limiting and regulating stations: Inspection and testing.
(a) Each pressure limiting station, relief device (except rupture discs), and pressure
regulating station and its equipment must be subjected at intervals not exceeding 15
months, but at least once each calendar year, to inspections and tests to determine
that it is—
(1) . . . .
(2) Adequate from the standpoint of capacity and reliability of operation for the
service in which it is employed;



Southern Star Procedure 60.02.02, entitled “Testing and Maintaining Overpressure
Protection Devices Procedure,” was inadequate to ensure the reliable operation of
overpressure protection devices. Specifically, Procedure 60.02.02 did not provide clear
requirements for the evaluation of mechanical overpressure protection device inspections.
The process detailed in Procedure 60.02.02 did not require evaluation of major
adjustments from the perspective of reliability after devices failed to actuate at the proper
set point.
Mechanical overpressure protection devices that require major adjustments often
malfunction again shortly after adjustments. Malfunctions cause the devices to fail to
relieve at the proper pressure. Additionally, Procedure 60.02.02 failed to (1) outline
testing parameters or results that may indicate a reliability problem with mechanical
devices; and (2) prescribe a process to follow up on reliability issues when needed.
Southern Star revised its procedures on June 29, 2023, including additional requirements
for follow-up inspections when set point drift indicated a reliability issue with an
overpressure device. Therefore, no further action or response is required.
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.206. Enclosed as
part of this Notice is a document entitled Response Options for Pipeline Operators in
Enforcement Proceedings.
Please refer to this document and note the response options. Be advised that all material you
submit in response to this enforcement action is subject to being made publicly available. If you
believe that any portion of your responsive material qualifies for confidential treatment under 5
U.S.C. § 552(b), along with the complete original document you must provide a second copy of
the document with the portions you believe qualify for confidential treatment redacted and an
explanation of why you believe the redacted information qualifies for confidential treatment
under 5 U.S.C. § 552(b).
Following the receipt of this Notice, you have 30 days to submit written comments, revised
procedures, or a request for a hearing under § 190.211. As mentioned above, Southern has
already submitted its amended procedures to PHMSA, including additional requirements for
follow-up inspections when set point drift indicated a reliability issue with an overpressure
device, which reflect the amendments required by this Notice. These amended procedures were
reviewed and found to be adequate by PHMSA; therefore, no further action or response is
required. If no additional response is received within 30 days of receipt of this Notice, this
enforcement will be automatically closed.



It is requested that Southern Star Central Gas Pipeline, Inc. maintain documentation of the safety
improvement costs associated with fulfilling this Notice of Amendment (preparation/revision of
plans, procedures) and submit the total to Gregory Ochs, Director, Central, Pipeline and
Hazardous Materials Safety Administration. In correspondence concerning this matter, please
refer to CPF 3-2024-013-NOA and, for each document you submit, please provide a copy in
electronic format whenever possible.
Sincerely,
Gregory A. Ochs
Director, Central, OPS
Pipeline and Hazardous Materials Safety Administration
cc: Craig Thomas, Manager Integrity Management & PHMSA Compliance,
craig.thomas@southernstar.com
Enclosure: Response Options for Pipeline Operators in Enforcement Proceedings

32024013NOA_Closure Letter_03072024_(22-233365)_text.pdf

VIA ELECTRONIC MAIL TO: shawn.patterson@southernstar.com;
craig.thomas@southernstar.com
March 7, 2024
Shawn Patterson
President and CEO
Southern Star Central Gas Pipeline, Inc.
4700 State Route 56
Owensboro, Kentucky 42301
RE: CPF No. 3-2024-013-NOA
Dear Mr. Patterson:
From March 2 through September 30, 2022, a representative of the Pipeline and Hazardous
Materials Safety Administration (PHMSA), Office of Pipeline Safety (OPS), pursuant to Chapter
601 of 49 United States Code (U.S.C.), conducted on-site inspections of Southern Star Central
Gas Pipeline, Inc.’s (Southern Star) natural gas transmission pipelines and facilities located in
the states of Oklahoma, Missouri, Kansas, Texas, Nebraska, Colorado, and Wyoming. As a
result of the inspection, Southern Star was issued a Notice of Amendment on February 2, 2024,
which proposed amendment of its procedures. Southern Star has submitted its amended
procedures which my staff has reviewed and it appears that the inadequacies outlined in the
Notice of Amendment have been corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank you
for your cooperation.
Sincerely,
Gregory A. Ochs
Director, Central, OPS
Pipeline and Hazardous Materials Safety Administration
cc: Craig Thomas, Manager Integrity Management & PHMSA Compliance,
craig.thomas@southernstar.com
- **truncated:** false
- **body characters:** 7437