# DTM GAS STORAGE COMPANY — Notice of Amendment

- **operation:** document
- **citation:** CPF 32024025NOA
- **title:** DTM GAS STORAGE COMPANY — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2024-03-15
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 192.505(d), 192.905(c), 192.911(l), 192.915(b)(2).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-32024025noa.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-32024025noa.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-32024025noa
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/32024025NOA
**body:**

Notice of Amendment involving DTM GAS STORAGE COMPANY. PHMSA's enforcement data identifies the cited regulations as 192.505(d),  192.905(c),  192.911(l),  192.915(b)(2). The case was opened on 2024-03-15 and is reported as closed as of 2024-06-14. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

32024025NOA_Closure Letter_06142024_(23-265890).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32024025NOA/32024025NOA_Closure%20Letter_06142024_(23-265890).pdf

32024025NOA_Closure Letter_06142024_(23-265890)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32024025NOA/32024025NOA_Closure%20Letter_06142024_(23-265890)_text.pdf

32024025NOA_Notice of Amendment_03152024_(23-265890).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32024025NOA/32024025NOA_Notice%20of%20Amendment_03152024_(23-265890).pdf

32024025NOA_Notice of Amendment_03152024_(23-265890)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32024025NOA/32024025NOA_Notice%20of%20Amendment_03152024_(23-265890)_text.pdf

32024025NOA_Operator Response to Notice (REVISED)_05172024_(23-265890).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32024025NOA/32024025NOA_Operator%20Response%20to%20Notice%20(REVISED)_05172024_(23-265890).pdf

32024025NOA_Operator Response to Notice (REVISED)_06122024_(23-265890).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32024025NOA/32024025NOA_Operator%20Response%20to%20Notice%20(REVISED)_06122024_(23-265890).pdf

32024025NOA_Operator Response to Notice_04122024_(23-265890).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32024025NOA/32024025NOA_Operator%20Response%20to%20Notice_04122024_(23-265890).pdf

32024025NOA_Closure Letter_06142024_(23-265890)_text.pdf

VIA ELECTRONIC MAIL TO: chris.zona@dtmidstream.com;
patrick.raichel@dtmidstream.com
June 14, 2024
Mr. Christopher Zona,
Chief Operating Officer
DTM Gas Storage Company
500 Woodward Ave., 29th Floor
Detroit, MI 48226
RE: CPF 3-2024-025-NOA
Dear Mr. Zona:
From July 10 through July 14, 2023, representatives of the Michigan Public Service Commission,
acting as an interstate agent for the Pipeline and Hazardous Materials Safety Administration
(PHMSA), pursuant to Chapter 601 of 49 United States Code (U.S.C.), inspected DTM Gas
Storage Company’s (DTM) procedures for operation and maintenance. As a result of the
inspection, DTM was issued a Notice of Amendment on March 15, 2024, which proposed
amendment of your procedures
DTM submitted its amended procedures on June 12 and 13, 2024 My staff has reviewed the
amended procedures, and it appears that the inadequacies outlined in this Notice of Amendment
have been corrected.
This letter is to inform you that no further action is necessary, and this case is now closed. Thank
you for your cooperation.
Sincerely,
Gregory A Ochs
Director, Central Region, Office of Pipeline Safety
Pipeline and Hazardous Materials Safety Administration
cc: Patrick Raichel (patrick.raichel@dtmidstream.com)

32024025NOA_Notice of Amendment_03152024_(23-265890)_text.pdf

NOTICE OF AMENDMENT
VIA ELECTRONIC MAIL TO: chris.zona@dtmidstream.com; patrick.raichel@dtmidstream.com
March 15, 2024
Mr. Christopher Zona,
Chief Operating Officer
DTM Gas Storage Company
500 Woodward Ave., 29th Floor
Detroit, MI 48226
CPF 3-2024-025-NOA
Dear Mr. Zona:
From July 10 through July 14, 2023, representatives of the Michigan Public Service Commission,
acting as an interstate agent for the Pipeline and Hazardous Materials Safety Administration
(PHMSA), pursuant to Chapter 601 of 49 United States Code (U.S.C.), inspected DTM Gas
Storage Company’s (DTM) procedures for operation and maintenance.
As a result of the inspection, PHMSA has identified the apparent inadequacies found within
DTM’s plans or procedures. The items inspected and the inadequacies are described below:
1. § 192.505 Strength test requirements for steel pipeline to operate at a hoop stress of 30
percent or more of SMYS.
(a) . . . .
(d) For fabricated units and short sections of pipe, for which a post installation test is
impractical, a preinstallation strength test must be conducted by maintaining the
pressure at or above the test pressure for at least 4 hours.
DTM’s specification “MS-ENG-040, Section 17 – Pressure Testing” was inadequate because it did
not appropriately define “short sections of pipe” or when “a post installation test is impractical.”
Per DTM’s specification, piping assemblies were to be tested in place as much as practical, but the
procedure allowed up to seven tie-in welds per system (as defined by DTM) or more, if approved
by Company Engineering. The procedure also defined “short sections of pipe” to be sections of
pipe up to 500 feet long. DTM’s specification “MS-ENG-040, Section 17 – Pressure Testing”
required modification to properly describe the maximum number of welds and maximum



allowable length of pipe for preinstallation pressure testing, so that it is clear when a post-
installation hydrostatic test becomes necessary.
DTM must amend its written procedures to comply with the requirements of § 192.505(d), in
accordance with § 192.13(c).
2. § 192.905 How does an operator identify a high consequence area?
(a) . . . .
(c) Newly identified areas. When an operator has information that the area around a
pipeline segment not previously identified as a high consequence area could satisfy
any of the definitions in § 192.903, the operator must complete the evaluation using
method (1) or (2). If the segment is determined to meet the definition as a high
consequence area, it must be incorporated into the operator's baseline assessment
plan as a high consequence area within one year from the date the area is identified.
DTM’s procedures for newly identified segments or new high consequence areas (HCA) did not
indicate that those locations would be incorporated into the baseline assessment plan (BAP) within
a year of the date of identification. The process for newly found HCAs to be incorporated into the
BAP must be addressed as required by § 192.911(a).
3. § 192.911 What are the elements of an integrity management program?
(a) . . . .
(l) A quality assurance process as outlined in ASME/ANSI B31.8S, section 12.
DTM’s quality assurance plan did not meet the requirements of ASME/ANSI B31.8S section 12.
Specifically, the plan did not have any documentation requirements for its internal audits for
quality assurance. Section 12 of ASME/ANSI B.31.8S requires that “corrective actions to improve
the integrity management program or quality plan shall be documented and the effectiveness of
their implementation monitored.” Section 192.911(I) requires that procedures for this requirement
be addressed within the quality assurance plan.
4. § 192.915 What knowledge and training must personnel have to carry out an integrity
management program?
(a) . . . .
(b) Persons who carry out assessments and evaluate assessment results. The integrity
management program must provide criteria for the qualification of any person -
(1) . . . .
(2) Who reviews and analyzes the results from an integrity assessment and
evaluation;
DTM’s procedures for assessments, via a pressure test, did not define the criteria for the
qualification of the person who reviews and analyzes the results from an integrity assessment
evaluation. DTM’s Procedure 903.2 addressed the pressure test assessment methods, but did not
specify who evaluates the results of the pressure tests and what qualification they require.
Although the procedure did reference DTM’s O&M Procedure 501, which required that an
integrity engineer must be involved, the procedure still failed to include any requirements defining



what those criteria for that engineer must be or that engineer’s responsibility. A process for
defining the responsibility and the qualifications of individuals reviewing those tests must be
addressed in the procedures as required by § 192.907(a).
Response to this Notice
This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.206. Enclosed as
part of this Notice is a document entitled Response Options for Pipeline Operators in Enforcement
Proceedings.
Please refer to this document and note the response options. Be advised that all material you
submit in response to this enforcement action is subject to being made publicly available. If you
believe that any portion of your responsive material qualifies for confidential treatment under 5
U.S.C. § 552(b), along with the complete original document you must provide a second copy of
the document with the portions you believe qualify for confidential treatment redacted and an
explanation of why you believe the redacted information qualifies for confidential treatment under
5 U.S.C. § 552(b).
Following the receipt of this Notice, you have 30 days to submit written comments, revised
procedures, or a request for a hearing under § 190.211. If you do not respond within 30 days of
receipt of this Notice, this constitutes a waiver of your right to contest the allegations in this Notice
and authorizes the Associate Administrator for Pipeline Safety to find facts as alleged in this
Notice without further notice to you and to issue an Order Directing Amendment. If your plans or
procedures are found inadequate as alleged in this Notice, you may be ordered to amend your plans
or procedures to correct the inadequacies (49 C.F.R. § 190.206). If you are not contesting this
Notice, we propose that you submit your amended procedures to my office within 30 days of
receipt of this Notice. This period may be extended by written request for good cause. Once the
inadequacies identified herein have been addressed in your amended procedures, this enforcement
action will be closed.
It is requested that DTM maintain documentation of the safety improvement costs associated with
fulfilling this Notice of Amendment (preparation/revision of plans, procedures) and submit the
total to Gregory A Ochs, Director, Central Region, Pipeline and Hazardous Materials Safety
Administration. In correspondence concerning this matter, please refer to CPF 3-2024-025-NOA
and, for each document you submit, please provide a copy in electronic format, whenever possible.
Sincerely,
Gregory A Ochs
Director, Central Region, Office of Pipeline Safety
Pipeline and Hazardous Materials Safety Administration
Enclosure: Response Options for Pipeline Operators in Enforcement Proceedings
cc: Patrick Raichel (patrick.raichel@dtmidstream.com)
- **truncated:** false
- **body characters:** 10517