# TEXAS GAS TRANSMISSION, LLC — Notice of Probable Violation

- **operation:** document
- **citation:** CPF 32024048NOPV
- **title:** TEXAS GAS TRANSMISSION, LLC — Notice of Probable Violation
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2024-05-21
- **effective on:** Not available
- **summary:** CLOSED notice of probable violation citing 192.907(a).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-32024048nopv.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-32024048nopv.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-32024048nopv
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/32024048NOPV
**body:**

Notice of Probable Violation involving TEXAS GAS TRANSMISSION, LLC. PHMSA's enforcement data identifies the cited regulation as 192.907(a). The case was opened on 2024-05-21 and is reported as closed as of 2025-04-28. Proposed civil penalty: $50,200. Assessed civil penalty: $0. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

32024048NOPV_Final Order_04282025_(23-264228).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32024048NOPV/32024048NOPV_Final%20Order_04282025_(23-264228).pdf

32024048NOPV_Final Order_04282025_(23-264228)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32024048NOPV/32024048NOPV_Final%20Order_04282025_(23-264228)_text.pdf

32024048NOPV_Operator Post-Hearing Brief_12192024_(23-264228).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32024048NOPV/32024048NOPV_Operator%20Post-Hearing%20Brief_12192024_(23-264228).pdf

32024048NOPV_Operator Pre-Hearing Submission_11122024_(23-264228).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32024048NOPV/32024048NOPV_Operator%20Pre-Hearing%20Submission_11122024_(23-264228).pdf

32024048NOPV_Operator Request for Hearing and Statement of Issues and Request for Informal Meeting (Part 3)_06182024_(23-264228).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32024048NOPV/32024048NOPV_Operator%20Request%20for%20Hearing%20and%20Statement%20of%20Issues%20and%20Request%20for%20Informal%20Meeting%20(Part%203)_06182024_(23-264228).pdf

32024048NOPV_Operator Response to Notice and Request for Hearing and Statement of Issues and Request for Informal Meeting (Part 1)_06182024_(23-264228).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32024048NOPV/32024048NOPV_Operator%20Response%20to%20Notice%20and%20Request%20for%20Hearing%20and%20Statement%20of%20Issues%20and%20Request%20for%20Informal%20Meeting%20(Part%201)_06182024_(23-264228).pdf

32024048NOPV_Operator Response to Notice and Request for Hearing and Statement of Issues and Request for Informal Meeting (Part 2)_06182024_(23-264228).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32024048NOPV/32024048NOPV_Operator%20Response%20to%20Notice%20and%20Request%20for%20Hearing%20and%20Statement%20of%20Issues%20and%20Request%20for%20Informal%20Meeting%20(Part%202)_06182024_(23-264228).pdf

32024048NOPV_PCP_05212024_(23-264228).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32024048NOPV/32024048NOPV_PCP_05212024_(23-264228).pdf

32024048NOPV_PCP_05212024_(23-264228)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32024048NOPV/32024048NOPV_PCP_05212024_(23-264228)_text.pdf

32024048NOPV_PHC Hearing Scheduled_07252024_(23-264228).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32024048NOPV/32024048NOPV_PHC%20Hearing%20Scheduled_07252024_(23-264228).pdf

32024048NOPV_PHC Hearing Scheduled_07252024_(23-264228)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32024048NOPV/32024048NOPV_PHC%20Hearing%20Scheduled_07252024_(23-264228)_text.pdf

32024048NOPV_PHC Hearing Scheduled_07252024_(23-264228)_text.pdf

July 25, 2024
VIA ELECTRONIC MAIL TO: tony.rizk@bwpipelines.com and gregory.ochs@dot.gov
Mr. Tony G. Rizk, P.E.
Vice President, Technical Services, Boardwalk Pipelines
Texas Gas Transmission, LLC
9 Greenway Plaza, Suite 2800
Houston, TX 77046
Mr. Gregory Ochs
Director, Central Region
Pipeline and Hazardous Materials Safety Administration
901 Locust Street, Suite 480
Kansas City, MO 64106-2641
Re: Notice of Hearing, Texas Gas Transmission, LLC
CPF No. 3-2024-048-NOPV
Dear Mr. Rizk and Mr. Ochs:
In accordance with 49 C.F.R. § 190.211, an informal hearing will be held regarding the Notice of
Probable Violation and Proposed Civil Penalty issued by the Pipeline and Hazardous Materials Safety
Administration in the above-referenced case. The hearing will take place on November 19, 2024,
beginning at 8:30 a.m. Central Time.
The hearing will be held at the PHMSA Central Region office, 901 Locust Street, Suite 480, Kansas
City, Missouri 64106. Upon arrival at the building, attendees will be required to present photo
identification to security personnel. A contact phone number for the day of the hearing is (816) 329-
3800.
At least 10 calendar days prior to the hearing (or by November 12, 2024), both parties must submit and
exchange any additional written materials they intend to present at the hearing and the name and email
address of each attendee. This information should be provided electronically. Materials not submitted
by this date may be excluded. If you have any questions, please do not hesitate to contact me.
Sincerely,
Larry White
Presiding Official



cc: Mr. Stanley Horton, President/CEO, Boardwalk Petrochemical Pipeline, LLC,
stan.horton@bwpipelines.com
Mr. Ryan McClure, Counsel, Central Region, Office of Pipeline Safety,
ryan.mcclure@dot.gov
Ms. Mia Petrucci, Law Clerk, Central Region, Office of Pipeline Safety,
mia.petrucci@dot.gov

32024048NOPV_Final Order_04282025_(23-264228)_text.pdf

April 28. 2025
VIA ELECTRONIC MAIL TO: scott.hallam@bwpipelines.com
Scott Hallam
Chief Executive Officer
Boardwalk Pipelines, LP
9 Greenway Plaza, Suite 2800
Houston Texas 77046
Re: CPF No. 3-2024-048-NOPV
Dear Mr. Hallam:
Enclosed please find the Final Order issued in the above-referenced case. It withdraws the
Notice of Probable Violation issued on May 21, 2024. Accordingly, this case is now closed.
Service of the Final Order by e-mail is effective upon the date of transmission and
acknowledgement of receipt as provided under 49 CFR § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Alan K. Mayberry
Associate Administrator
for Pipeline Safety
Enclosure
cc: Mr. Gregory Ochs, Director, Central Region, Office of Pipeline Safety, PHMSA;
Susan Olenchuk, Van Ness Feldman LLP, Counsel to Texas Gas Transmission,
LLC, sam@vnf.com;
Michael McMahon, Senior Vice President and Chief Legal and Regulatory Officer,
Boardwalk Pipelines, LP, mike.mcmahon@bwpipelines.com;



Jeff Sanderson, Senior Vice President, Operations, Engineering and Construction,
Boardwalk Pipelines, LP, jeff.sanderson@bwpipelines.com;
Tony Rizk, P.E., Vice President, Technical Services, Boardwalk Pipelines, LP,
tony.rizk@bwpipelines.com;
Tina Baker, Manager, Compliance Services, Boardwalk Pipelines, LP,
tina.baker@bwpipelines.com
CONFIRMATION OF RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
____________________________________
In the Matter of )
Texas Gas Transmission, LLC, ) CPF No. 3-2024-048-NOPV
)
)
)
Respondent. )
____________________________________)
FINAL ORDER
From March 6 through July 24, 2023, pursuant to 49 U.S.C. § 60117, a representative of the
Pipeline and Hazardous Materials Safety Administration (PHMSA), Office of Pipeline Safety
(OPS), conducted a pipeline safety inspection of Texas Gas Transmission, LLC’s (TGT or
Respondent) facilities and records in Texas, Louisiana, Arkansas, Mississippi, and Tennessee.
TGT operates an interstate natural gas pipeline facility in the southeast United States.
As a result of the inspection, the Director, Central Region, OPS (Director), issued to Respondent,
by letter dated May 21, 2024, a Notice of Probable Violation and Proposed Civil Penalty
(Notice). In accordance with 49 CFR § 190.207, the Notice proposed finding that Respondent
had committed one violation of 49 CFR Part 192 and proposed assessing a civil penalty of
$50,200 for the alleged violation.
Boardwalk Pipelines, LP responded to the Notice on behalf of Respondent by letter dated June
18, 2024 (Response).
1 Respondent contested the allegation of violation and the proposed civil
penalty. TGT and the Director both submitted additional written materials on November 12,
2024 (Pre-hearing submissions). A hearing was subsequently held on November 19, 2024 in
Kansas City, Missouri, before a Presiding Official from the PHMSA Office of Chief Counsel.
At the hearing, Respondent was represented by counsel. After the hearing, Respondent provided
additional written material for the record by letter dated December 19, 2024 (Post-hearing
submission). The Director provided a recommendation for final order on January 10, 2025
(Recommendation), and TGT submitted a reply to the Recommendation on January 21, 2024
(Reply).
1 TGT is a subsidiary of Boardwalk Pipelines, LP.



WITHDRAWAL OF ALLEGATION
The Notice alleged that Respondent violated 49 CFR Part 192, as follows:
Item 1. The Notice alleged that Respondent violated 49 CFR § 192.907(a), which states:
§ 192.907 What must an operator do to implement this subpart?
(a) General. No later than December 17, 2004, an operator of a covered
pipeline segment must develop and follow a written integrity management program
that contains all the elements described in § 192.911 and that addresses the risks on
each covered transmission pipeline segment. The initial integrity management
program must consist, at a minimum, of a framework that describes the process for
implementing each program element, how relevant decisions will be made and by
whom, a time line for completing the work to implement the program element, and
how information gained from experience will be continuously incorporated into the
program. The framework will evolve into a more detailed and comprehensive
program. An operator must make continual improvements to the program.
The Notice alleged that Respondent violated section 192.907(a) when it failed to follow its
Integrity Management Program (IMP) Procedure Manual (Manual) on its EIS 18-2 pipeline
segment (Hwy 61 to Weaver Road) near Clarksdale, Mississippi. The Notice specifically alleged
TGT failed to follow Appendix 4, Step 11, Task 2 (“Resubmission of Data (if required)”) of its
IMP Manual by not determining whether the anomalies discovered by field personnel during
integrity assessment digs, but not detected by the in-line inspection (ILI) vendor, constituted a
need for the ILI vendor to re-grade the anomalies and re-submit the data.
TGT contested Item 1 in its written submissions and at the hearing. Respondent argued OPS did
not meet the burden of proof to show that TGT failed to follow its IMP Manual.2 TGT asserted
the evidence in the record shows that it did make a determination not to re-grade the ILI data
from the May 2021 ILI tool run implicated by the Notice.3 TGT states that it determined that re-
grading the anomalies was not necessary and would not have changed the ILI run results.4 TGT
explained the additional gouges found at excavation sites (i.e., the field data) were detected by
the ILI tool but not “called out” because the gouges did not meet the sizing or attribute reporting
parameters of the ILI tool.5 TGT explained that the additional gouges discussed at the hearing
did not indicate any significant variations or severe discrepancies existed between the ILI and
field data, and that re-grading anomalies that an ILI tool is not capable of grading would not
produce a different result.
6 TGT also stated that its IMP Manual does not require re-grading in
2 See Post-hearing submission at 2-5, 11.
3 Id. at 5-10.
4 See Reply at 5.
5 Id.
6 Id. Post-hearing submission at 11.



this circumstance.7 TGT explained that it confirmed the existence of the gouges during field
excavations and repaired them.8 TGT argued that OPS’ disagreement with TGT’s determination
that re-grading the ILI data was not necessary, does not mean TGT failed to follow its IMP
Manual.9 TGT also asserted that multiple documents in the record prove that it made a sound
determination not to require re-grading or re-submission of the ILI data under the IPM Manual
provision cited in the Notice.10 Respondent argued that “. . . OPS attempted to recast the
allegation in the Notice as a failure by Texas Gas to document its decision not to re-grade the ILI
data.”11 TGT also requested that the proposed civil penalty in the Notice correspondingly be
withdrawn, or in the alternative, that it be recalculated and reduced to reflect the occurrence of
only a potential recordkeeping violation.12
The allegation in the Notice relates to TGT’s IMP Procedure Manual Appendix 4, Step 11, Task
2.13 This portion of TGT’s IMP Manual addresses discrepancies between ILI run results and
anomalies found during later field excavation activities. The relevant portion the IMP Manual
OPS alleges TGT violated reads as follows:
If the field data significantly varies with the vendor data regarding
location and anomaly attributes, the MGR ILI Technology &
Analytics will have to decide whether the vendor should resubmit
the data. Severe discrepancies between the actual anomaly and the
predicted attributes can be indicative of the data caliber in the entire
report.
The company will determine whether this constitutes a need for the
ILI vendor to re-grade all anomalies. If re-grading required, Steps
4-9 shall be repeated.
14
The above procedure implicating section 190.907(a) establishes that after an ILI run is
conducted, TGT must determine whether any significant variations in the data regarding location
and anomaly attributes are present after comparing the ILI run data to field data. If significant
7 Reply at 5.
8 Id.
9 Post-hearing submission at 11.
10 Id. at 11-12
11 Id. at 3.
12 Id. at 1, 12. See also Reply at 5-6.
13 Notice at 2; Post-hearing submission at Attachment A.
14 Violation Report at Exhibit 1; Post-hearing submission at Attachment A.



variations are present, TGT must then decide whether to have the ILI vendor resubmit the data
and whether, if severe discrepancies exist, all anomalies need to be re-graded.15
OPS’ allegation in the Notice as to the existence of significant variations between the field and
ILI data is based on five gouges discussed during the hearing that were identified during post-ILI
run field excavation activities.16 OPS alleged the gouges had potential wall metal loss over a 15
percent threshold that TGT had voluntarily requested be “called out” in the ILI run data, but
which the ILI report did not identify.
17 OPS therefore asserted that significant variations existed
between the ILI data and the field data.
18
TGT disputed that the variations in data discussed by OPS at the hearing were considered
significant.19 TGT stated “[t]he claims that the ILI vendor did not detect the additional gouges
and that the field data varied significantly from the ILI data and contained severe discrepancies
lacks evidentiary support.”20 In support of its position, TGT explained there were not location
and anomaly discrepancies in the ILI data as compared to the corresponding field data.21 TGT
explained that the gouges discussed during the hearing had been detected by the ILI tool but not
“called out” because they were outside of the sizing and attribute parameters of the ILI tool.22
TGT stated the gouges were actually detected by the tool via deviations reflected in applicable
data and that that information was provided to its own field personal during later field excavation
15 There was agreement of both parties that TGT made a determination not to re-grade the ILI anomaly data as
described in the IMP Manual provision cited in the Notice. Post-hearing submission at 1-3, 5-10. See also
Recommendation at 7. OPS acknowledged at the hearing and in its Recommendation that TGT made such
determination, stating it “ . . . does not dispute that TGT decided to not ask the ILI vendor to regrade and resubmit
the data.” Recommendation at 7. See also Hearing Transcript (Tr.) at: 11-12; 15: 13-22; 16: 1-16; 40: 10-19. OPS
characterized the allegation at issue at the hearing as involving TGT’s failure to follow its IMP Manual via an
alleged lack of documentation evidencing TGT’s determination. Id. TGT pointed to documentation of its
evaluation of the ILI data and its determination to not request re-submission or re-grading of the ILI report as
including: dig sheets describing the attributes and locations of called anomalies as well as the detected additional
gouges; Pipe Evaluation Information forms; a Completed Integrity Assessment Excavation Summary (2021 ILI);
unity plots; and, data screenshots showing deviations in the ILI data apparently caused by the gouges discussed at
the hearing. See Post-hearing submission at 11-12. However, as based on the discussion below regarding the lack
of evidence to prove there were significant variations in the ILI data, this Final Order need not address the adequacy
of TGT’s documentation of its determination addressing the May 2021 ILI run data. The Notice also did not allege
a violation of section 192.947(d), which requires a pipeline operator to maintain for the useful life of a pipeline “. . .
[d]ocuments to support any decision . . .” made under its IMP.
16 See Tr. at 26: 20-22; 27: 1-2; 36: 12-17; 44: 19-22; 45: 1-4 and 15-22; 46: 1-2; 51; 17-22. Recommendation at 2,
4-11.
17 Id.
18 Tr. at 32: 17-22; 34: 4-14; 35: 21-22; 36: 1-3.
19 See e.g., Tr. at 69: 9-17; 75: 19-22, 76: 1-13; 80: 9-15. See also Post-hearing submission at 1-2, 11.
20 Post-hearing submission at 11.
21 Post-hearing submission at 9-11.
22 See Tr. at 61-66; 76: 1-13. Reply at 3-5.



activities, and also to OPS prior to issuance of the Notice.23 TGT posited that OPS was
attempting to correlate the limitations of the ILI tool parameters as representing the existence of
significant variations when comparing ILI data to field data.24 TGT asserted that where gouges
that were detected by the ILI tool but do not meet the sizing or attribute reporting parameters of
the ILI tool, that re-submission or re-grading would not actually result in any differences in the
ILI report (explaining there would be no purpose in re-submitting or re-grading the May 2021
ILI data).25
A review of the record indicates neither the Notice nor OPS’ testimony at the hearing cite to an
ascertainable threshold, whether in TGT’s IMP Manual, in Part 192, or in other applicable
reference, to establish what represents a significant variation between the field data and the ILI
data. OPS explained at the hearing its opinion of the definition of a significant variation as
applicable to this ILI run (i.e., that the five gouges discussed at the hearing were not identified in
the ILI report).
26 The Recommendation also did not identify an applicable reference to be able to
ascertain a threshold proving the existence of significant variations. The Recommendation
indicated that OPS views the ILI data in this case as significantly varying under TGT’s IMP
Manual because certain gouges exceeded metal loss thresholds TGT asked the ILI vendor to
identify.27
In sum, the record lacks substantial evidence to prove that the May 2021 ILI data significantly
varied from the field data (or the existence of any severe discrepancies) such that a determination
as to the necessity of re-submission or re-grading of the ILI data was required under TGT’s IMP
Manual. TGT presented evidence and testimony explaining the ILI report did not “call out” the
gouges discussed at the hearing because the gouges did not meet sizing or attribute reporting
parameters of the ILI tool. OPS did not provide evidence proving the presence of significant
variations between the ILI and field data under any provision of TGT’s IMP Manual or Part 192,
nor evidence to overcome TGT’s evidence addressing the ILI tool sizing and attribute reporting
parameters discussed above.
Accordingly, after considering all of the evidence, I find that OPS did not meet its burden of
proving the allegation in the Notice. Based upon the foregoing, I hereby order that the Notice be
withdrawn.
ASSESSMENT OF PENALTY
23 Post-hearing submission at 2. Tr. at 63: 1-20.
24 Post-hearing submission at 10-11.
25 TGT explained that the “ILI vendor does not re-grade metal loss anomalies caused by gouges because their
irregular profiles are not repeatable.” Post-hearing submission at 10. See also Reply at 2-3, 5; Tr. at 91: 2-18.
26 See Tr. at 23: 9-11; 29: 3-7; 30: 19-22; 31: 21-22; 32: 1-3 and 17-20; 34: 4-14; 35: 21-22; 36:1-3; 40: 5-19; 45:
18-22. See also Recommendation at 2-6.
27 Recommendation at 6 (“Central Region views the field data obtained by TGT . . . as varying significantly from the
vendor’s data.”).



The Notice proposed a civil penalty of $50,200 for Respondent’s alleged violation of
49 CFR § 192.907(a). Since the Notice has been withdrawn, the proposed penalty is not
assessed.
___________________________________ __________________________
Alan K. Mayberry Date Issued
Associate Administrator
for Pipeline Safety