# TEXAS GAS TRANSMISSION, LLC — Notice of Probable Violation

- **operation:** document
- **citation:** CPF 32024062NOPV
- **title:** TEXAS GAS TRANSMISSION, LLC — Notice of Probable Violation
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2024-11-21
- **effective on:** Not available
- **summary:** CLOSED notice of probable violation citing 192.745(b).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-32024062nopv.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-32024062nopv.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-32024062nopv
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/32024062NOPV
**body:**

Notice of Probable Violation involving TEXAS GAS TRANSMISSION, LLC. PHMSA's enforcement data identifies the cited regulation as 192.745(b). The case was opened on 2024-11-21 and is reported as closed as of 2025-03-03. Proposed civil penalty: $50,200. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

32024062NOPV_Operator Request for Hearing and Request for Informal Meeting and Preliminary Statement of Issues (Part 3)_12192024_(23-266139).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32024062NOPV/32024062NOPV_Operator%20Request%20for%20Hearing%20and%20Request%20for%20Informal%20Meeting%20and%20Preliminary%20Statement%20of%20Issues%20(Part%203)_12192024_(23-266139).pdf

32024062NOPV_Operator Response to Notice and Request for Hearing and Request for Informal Meeting and Preliminary Statement of Issues (Part 2)_12192024_(23-266139).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32024062NOPV/32024062NOPV_Operator%20Response%20to%20Notice%20and%20Request%20for%20Hearing%20and%20Request%20for%20Informal%20Meeting%20and%20Preliminary%20Statement%20of%20Issues%20(Part%202)_12192024_(23-266139).pdf

32024062NOPV_Operator Response to Notice and Request Hearing and Request Informal Meeting and Request Case File and Statement of Issues (Part 1)_12192024_(23-266139).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32024062NOPV/32024062NOPV_Operator%20Response%20to%20Notice%20and%20Request%20Hearing%20and%20Request%20Informal%20Meeting%20and%20Request%20Case%20File%20and%20Statement%20of%20Issues%20(Part%201)_12192024_(23-266139).pdf

32024062NOPV_PCP PCO_11212024_(23-266139).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32024062NOPV/32024062NOPV_PCP%20PCO_11212024_(23-266139).pdf

32024062NOPV_PCP PCO_11212024_(23-266139)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32024062NOPV/32024062NOPV_PCP%20PCO_11212024_(23-266139)_text.pdf

32024062NOPV_PHC Hearing Scheduled_02212025_(23-266139).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32024062NOPV/32024062NOPV_PHC%20Hearing%20Scheduled_02212025_(23-266139).pdf

32024062NOPV_PHC Hearing Scheduled_02212025_(23-266139)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32024062NOPV/32024062NOPV_PHC%20Hearing%20Scheduled_02212025_(23-266139)_text.pdf

32024062NOPV_Region Withdrawal of Notice Letter_03032025_(23-266139).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32024062NOPV/32024062NOPV_Region%20Withdrawal%20of%20Notice%20Letter_03032025_(23-266139).pdf

32024062NOPV_Region Withdrawal of Notice Letter_03032025_(23-266139)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32024062NOPV/32024062NOPV_Region%20Withdrawal%20of%20Notice%20Letter_03032025_(23-266139)_text.pdf

32024062NOPV_Region Withdrawal of Notice Letter_03032025_(23-266139)_text.pdf

WITHDRAWAL OF NOTICE LETTER
VIA ELECTRONIC MAIL TO: scott.hallam@bwpipelines.com; tina.baker@bwpipelines.com
March 3, 2025
Mr. Scott Hallam, President & CEO
Boardwalk Pipelines, LP
9 Greenway Plaza, Suite 2800
Houston, TX 77066
RE: CPF 3-2024-062-NOPV
Dear Mr. Hallam:
On November 21, 2024, Texas Gas Transmission, LLC (TGT), a subsidiary of Boardwalk
Pipelines, LP, was issued a Notice of Probable Violation, Proposed Civil Penalty, and Proposed
Compliance Order for the case number referenced above. This Notice cited TGT for one instance
of failing to take prompt remedial action to repair an emergency valve, per the requirements of
49 C.F.R. § 192.745(b).
Based on additional information submitted by Boardwalk in response to the Notice, this letter is
to inform you that PHMSA hereby withdraws the Notice. This case is now closed.
Sincerely,
Gregory A. Ochs
Director, Central Region
Pipeline and Hazardous Materials Safety Administration
cc: Tina Baker, Manager, Compliance Services, BW Pipelines, LP,
tina.baker@bwpipelines.com
CONFIRMATION OF RECEIPT REQUESTED

32024062NOPV_PHC Hearing Scheduled_02212025_(23-266139)_text.pdf

VIA E-MAIL: sam@vnf.com; gregory.ochs@dot.gov
February 21, 2025
Susan Olenchuk
Counsel for Texas Gas Transmission, LLC
Van Ness Feldman LLP
2000 Pennsylvania Avenue, NW
Suite 6000
Washington, DC 20006
Gregory Ochs
Director, Central Region
Pipeline and Hazardous Materials Safety Administration
901 Locust Street
Suite 480
Kansas City, MO 64106
Re: Notice of Hearing CPF No. 3-2024-062-NOPV; Texas Gas Transmission, LLC
Dear Ms. Olenchuk and Mr. Ochs:
In accordance with 49 C.F.R. § 190.211, an informal hearing will be held regarding the Notice of
Probable Violation and Proposed Civil Penalty and Proposed Compliance Order issued by the
Pipeline and Hazardous Materials Safety Administration (PHMSA) in the above-referenced case.
The hearing will take place on May 29, 2025, and will begin after the conclusion of the hearing
in CPF No. 3-2024-064-NOA (which is scheduled to begin at 8:30 a.m. Central Daylight Time
on the same date).1
The hearing will be held at the PHMSA Central Region office, 901 Locust Street, Suite 480,
Kansas City, Missouri 64106. Upon arrival at the building, attendees will be required to present
photo identification to security personnel. A contact phone number for the day of the hearing is
(816) 329-3800.
At least 10 calendar days prior to the hearing (or by May 19, 2025), under § 190.211(d) both
parties must submit and exchange any additional written materials they intend to present at the
hearing and the name and email address of each attendee. This information should be provided
1 If the hearing in CPF No. 3-2024-064-NOA is canceled or re-scheduled prior to the scheduled date, as discussed
with the parties the hearing in this CPF No. 3-2024-062-NOPV will then begin at 8:30 a.m. Central Daylight Time
on May 29, 2025.



electronically. Materials not submitted by this date may be excluded. If you have any questions,
please do not hesitate to contact me.
Respectfully,
Joseph St. Peter
Presiding Official, Office of Chief Counsel
PHMSA
cc: Tony Rizk, P.E., Vice President, Technical Services, Boardwalk Pipelines, LP
tony.rizk@bwpipelines.com
Tina Baker, Manager, Compliance Services, Boardwalk Pipelines, LP
tina.baker@bwpipelines.com
Ryan McClure, Counsel, Central Region, PHMSA,
ryan.mcclure@dot.gov
Mia Petrucci, Law Clerk, Central Region, PHMSA,
mia.petrucci@dot.gov
- **truncated:** false