# SPIRE MISSOURI INC. EAST — Notice of Amendment

- **operation:** document
- **citation:** CPF 32025023NOA
- **title:** SPIRE MISSOURI INC. EAST — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2025-10-14
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 195.402(a), 195.402(c)(5), 195.402(e)(9), 195.422(a), 195.452(l)(1)(ii).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-32025023noa.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-32025023noa.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-32025023noa
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/32025023NOA
**body:**

Notice of Amendment involving SPIRE MISSOURI INC. EAST. PHMSA's enforcement data identifies the cited regulations as 195.402(a),  195.402(c)(5),  195.402(e)(9),  195.422(a),  195.452(l)(1)(ii). The case was opened on 2025-10-14 and is reported as closed as of 2026-01-22. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

32025023NOA_Closure Letter_01222026_(24-297354).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32025023NOA/32025023NOA_Closure%20Letter_01222026_(24-297354).pdf

32025023NOA_Closure Letter_01222026_(24-297354)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32025023NOA/32025023NOA_Closure%20Letter_01222026_(24-297354)_text.pdf

32025023NOA_Notice of Amendment_10142025_(24-297354).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32025023NOA/32025023NOA_Notice%20of%20Amendment_10142025_(24-297354).pdf

32025023NOA_Notice of Amendment_10142025_(24-297354)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32025023NOA/32025023NOA_Notice%20of%20Amendment_10142025_(24-297354)_text.pdf

32025023NOA_Operator Response to Notice_11132025_(24-297354).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32025023NOA/32025023NOA_Operator%20Response%20to%20Notice_11132025_(24-297354).pdf

32025023NOA_Closure Letter_01222026_(24-297354)_text.pdf

U.S. Department
of Transportation
Pipeline and Hazardous
Materials Safety
901 Locust Street, Suite 480
Kansas City, MO 64106
VIA ELECTRONIC MAIL TO: mark.lowe@spireenergy.com;
scott.smith@spireenergy.com, randy.wilson@spireenergy.com
January 22, 2026
Mr. Mark Lowe
Senior Vice President, Engineering, Gas Supply and Operation
Spire Missouri Inc. East
700 Market Street
St. Louis, MO 63101
RE: CPF 3-2025-023-NOA
Dear Mr. Smith:
From October 16 to October 24, 2024, a representative of the Pipeline and Hazardous Materials
Safety Administration (PHMSA), pursuant to Chapter 601 of 49 United States Code (U.S.C.),
conducted an inspection of Spire Midstream’s (Spire) procedures for the highly volatile liquid
(“HVL”) Laclede / Chouteau Island pipeline in Saint Louis, Missouri. On October 14, 2025,
pursuant to 49 CFR § 190.206, PHMSA issued a Notice of Amendment (Notice) which proposed
amendment of Spire’s procedures.
Spire submitted its amended procedures on November 13, 2025. PHMSA has reviewed the
amended procedures, and it appears that the inadequacies outlined in the Notice for Items 1 and 3
have been corrected. With respect to Item 2, Spire provided its Notification of Sale of the NGL
Pipeline to Phillips 66 Pipeline, LLC, effective January 1, 2026; therefore, amended procedures
per Item 2 are no longer required to be submitted. Accordingly, this letter is to inform you that
PHMSA hereby withdraws Item 2 of the Notice. The other Items are now closed.
Sincerely,
David Barrett
Acting Director, Central Region, Office of Pipeline Safety
Pipeline and Hazardous Materials Safety Administration
cc: Mr. Scott Smith, President, Spire Midstream
Mr. Randy Wilson, Director, Pipeline & System Integrity, Spire Missouri Inc. East

32025023NOA_Notice of Amendment_10142025_(24-297354)_text.pdf

NOTICE OF AMENDMENT
VIA ELECTRONIC MAIL TO: scott.smith@spireenergy.com,
randy.wilson@spireenergy.com
October 14, 2025
Mr. Scott R. Smith
President
Spire Midstream
3773 Richmond Avenue, Suite 300
Houston, TX 77046
CPF 3-2025-023-NOA
Dear Mr. Smith:
From October 16 to October 24, 2024, a representative of the Pipeline and Hazardous Materials
Safety Administration (PHMSA), pursuant to Chapter 601 of 49 United States Code (U.S.C.),
conducted an inspection of Spire Midstream’s (Spire) procedures for the highly volatile liquid
(“HVL”) Laclede / Chouteau Island pipeline in Saint Louis, Missouri.
As a result of the inspection, PHMSA has identified the apparent alleged inadequacies found
within Spire’s plans or procedures. The items inspected and the alleged inadequacies are described
below:
1. § 195.452 Pipeline integrity management in high consequence areas.
(a) . . . .
(l) What records must an operator keep to demonstrate compliance?
(1) An operator must maintain, for the useful life of the pipeline, records that
demonstrate compliance with the requirements of this subpart. At a minimum,
an operator must maintain the following records for review during an
inspection:
(i) . . . .
(ii) Documents to support the decisions and analyses, including any
modifications, justifications, deviations and determinations made,



variances, and actions taken, to implement and evaluate each element of
the integrity management program listed in paragraph (f) of this section.
Spire’s written Integrity Management Program (“IMP”) was inadequate because it did not
specifically require maintaining for the useful life of the pipeline documents to support the
decisions and analyses to implement and evaluate each element of the integrity management
program listed in paragraph (f) of § 195.452. Specifically, while the IMP had the general language
of § 195.452(l)(1) in Section 15.3, the procedures did not specifically require documentation of
decision-making in regard to the individual elements required by § 195.452(f). In particular,
Spire’s IMP did not direct documentation of the identification and selection of preventive and
mitigative measures (“PMMs”), required by § 195.452(f)(6).
During the inspection, Spire representatives enumerated specific PMMs that Spire implemented,
but when requested by PHMSA, Spire was unable to provide documentation to support its PMM
analysis and decision making, to include who made the PMM determinations, when they were
made, or the basis of the decision making.
Spire must amend its procedures to ensure that documents to support the decisions and analyses
for selecting PMMs are recorded and maintained in a written record for the useful life of the
pipeline, to include the reasoning for the determinations, what hazards the measures are intended
to address, the personnel making the decisions, and the dates that they were made and
implemented.
2. § 195.422 Pipeline repairs.
(a) Each operator shall, in repairing its pipeline systems, insure that the repairs are
made in a safe manner and are made so as to prevent damage to persons or
property.
Spire’s procedures pertaining to welding and other “hot work” activities were inadequate to ensure
that repairs are made in a safe manner and performed in a way that prevents damage to persons or
property. Specifically, Spire’s procedures were inconsistent regarding the need to purge product
or take other steps to reduce the particular hazards associated with working on an active HVL
pipeline. Operating Procedures Manual (OPM) Appendix D, Spire Standard NGL-10701J Purging
of Highly Volatile Liquid (HVL) Mains for Repair or Abandonment stated: “Before HVL lines
can be repaired or abandoned, all product must first be removed from the pipeline. See NGL
Operations Procedure 3020.” Procedure 3020 described purging of the HVL lines. In addition,
OPM section 403 stated that maintenance personnel shall be trained “to safely repair pipeline
facilities using special precautions such as isolation and purging where HVL is involved.”
However, other portions of Spire’s procedures discussed hot work without any reference to
purging or other special precautions. Welding specification W-100.G “In Service Welding
Procedure” stated that it is applicable to Spire NGL, Inc., implying that welding may be performed
on the HVL line while it is pressurized and/or conveying product. Welding specification W-100.1
and procedure NGL-10500L both discussed hot tapping, and W-100.1 also stated “Low hydrogen
electrodes (E7018) shall be used on pressurized ("in-service") mains, static or flowing.”



Cadwelding procedures also failed to address whether any special precautions were needed when
working on HVL pipelines.
Spire must amend its procedures to clearly and consistently identify under what conditions in-
service welding, such as installation of repair sleeves, cadwelding of cathodic test leads, or other
applicable activities, may be performed on the HVL lines.
3. § 195.402 Procedural manual for operations, maintenance, and emergencies.
(a) General. Each operator shall prepare and follow for each pipeline system a
manual of written procedures for conducting normal operations and maintenance
activities and handling abnormal operations and emergencies…
(b) . . . .
(c) Maintenance and normal operations. The manual required by paragraph (a) of
this section must include procedures for the following to provide safety during
maintenance and normal operations:
(1) . . . .
(5) Investigating and analyzing pipeline accidents and failures, including sending
the failed pipe, component, or equipment for laboratory testing or
examination where appropriate, to determine the cause(s) and contributing
factors of the failure and to minimize the possibility of a recurrence.
(d) . . . .
(e) Emergencies. The manual required by paragraph (a) of this section must include
procedures for the following to provide safety when an emergency condition
occurs:
(1) . . . .
(9) Providing for a post accident review of employee activities to determine
whether the procedures were effective in each emergency and taking
corrective action where deficiencies are found.
Spire’s procedures regarding the post-accident investigation process were inadequate because they
lacked sufficient detail to comply with § 195.402(e)(9). During the inspection, the operator
reported that there is a Safety Management Systems (SMS) group which is intended to carry out
root cause analysis for accidents. PHMSA reviewed a draft document referred to as “SOP Element
5” addressing this process. However, the draft SOP at the time of inspection only referenced
natural gas procedures and requirements. Spire’s OPM at the time of inspection did not mention
the SMS group’s responsibilities. The operator reported that Spire’s Claims Department would be
responsible for preserving and submitting specimens needed for laboratory analysis, such as
metallurgical examination of failed pipe fragments, but the OPM did not address this.
Spire must amend its procedures to clearly and consistently define which parties are responsible
for each component of the accident investigation and the post-accident review of emergency
procedure effectiveness, ensure that relevant documents are appropriately cross-referenced, and
incorporate hazardous liquid procedures and requirements into the SMS process where applicable.
Response to this Notice



This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 CFR § 190.206. Enclosed as part
of this Notice is a document entitled Response Options for Pipeline Operators in Enforcement
Proceedings.
Please refer to this document and note the response options. Be advised that all material you submit
in response to this enforcement action is subject to being made publicly available. If you believe
that any portion of your responsive material qualifies for confidential treatment under 5 U.S.C. §
552(b), along with the complete original document you must provide a second copy of the
document with the portions you believe qualify for confidential treatment redacted and an
explanation of why you believe the redacted information qualifies for confidential treatment under
5 U.S.C. § 552(b).
Following the receipt of this Notice, you have 30 days to submit written comments, revised
procedures, or a request for a hearing under § 190.211. If you do not respond within 30 days of
receipt of this Notice, this constitutes a waiver of your right to contest the allegations in this Notice
and authorizes the Associate Administrator for Pipeline Safety to find facts as alleged in this Notice
without further notice to you and to issue an Order Directing Amendment. If your plans or
procedures are found inadequate as alleged in this Notice, you may be ordered to amend your plans
or procedures to correct the inadequacies (49 CFR § 190.206). If you are not contesting this Notice,
we propose that you submit your amended procedures to my office within thirty (30) days of
receipt of this Notice. This period may be extended by written request for good cause. Once the
inadequacies identified herein have been addressed in your amended procedures, this enforcement
action will be closed.
It is requested (not mandated) that Spire maintain documentation of the safety improvement costs
associated with fulfilling this Notice of Amendment (preparation/revision of plans, procedures)
and submit the total to the Director, Central Region, Pipeline and Hazardous Materials Safety
Administration. In correspondence concerning this matter, please refer to CPF 3-2025-023-NOA
and, for each document you submit, please provide a copy in electronic format whenever possible.
Sincerely,
David Barrett
Acting Director, Central Region, Office of Pipeline Safety
Pipeline and Hazardous Materials Safety Administration
cc: Randy Wilson, Director, Pipeline & System Integrity
Enclosure: Response Options for Pipeline Operators in Enforcement Proceedings