# ST LOUIS PIPELINE OPERATING LLC — Notice of Probable Violation

- **operation:** document
- **citation:** CPF 32025029NOPV
- **title:** ST LOUIS PIPELINE OPERATING LLC — Notice of Probable Violation
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2025-08-15
- **effective on:** Not available
- **summary:** CLOSED notice of probable violation citing 195.266, 195.406(a), 195.505(h).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-32025029nopv.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-32025029nopv.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-32025029nopv
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/32025029NOPV
**body:**

Notice of Probable Violation involving ST LOUIS PIPELINE OPERATING LLC. PHMSA's enforcement data identifies the cited regulations as 195.266,  195.406(a),  195.505(h). The case was opened on 2025-08-15 and is reported as closed as of 2026-01-27. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

32025029NOPV_Closure Letter_01272026_(24-297350).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32025029NOPV/32025029NOPV_Closure%20Letter_01272026_(24-297350).pdf

32025029NOPV_Closure Letter_01272026_(24-297350)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32025029NOPV/32025029NOPV_Closure%20Letter_01272026_(24-297350)_text.pdf

32025029NOPV_Final Order_11102025_(24-297350).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32025029NOPV/32025029NOPV_Final%20Order_11102025_(24-297350).pdf

32025029NOPV_Final Order_11102025_(24-297350)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32025029NOPV/32025029NOPV_Final%20Order_11102025_(24-297350)_text.pdf

32025029NOPV_PCO_08152025_(24-297350).pdf: https://primis.phmsa.dot.gov/enforcement-documents/32025029NOPV/32025029NOPV_PCO_08152025_(24-297350).pdf

32025029NOPV_PCO_08152025_(24-297350)_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/32025029NOPV/32025029NOPV_PCO_08152025_(24-297350)_text.pdf

32025029NOPV_Closure Letter_01272026_(24-297350)_text.pdf

U.S. Department
of Transportation
Pipeline and Hazardous
Materials Safety
901 Locust Street, Suite 480
Kansas City, MO 64106
VIA ELECTRONIC MAIL TO: tampapc@outlook.com;
berry.croft@panamericanpipelines.com; stlouispipelinegm@outlook.com
January 27, 2026
Robert Rose, President
St. Louis Pipeline Operating, LLC
4120 Higel Street
Sarasota, FL 34242
RE: CPF 3-2025-029-NOPV
Dear Mr. Rose:
On November 10, 2025, the Pipeline and Hazardous Materials Safety Administration (PHMSA)
issued to St. Louis Pipeline Operating, LLC’s (SLPCO) a Final Order, pursuant to 49 CFR
§ 190.213. This Order included a Compliance Order. Based on a review of the documentation
provided and PHMSA’s observations during a site visit in November 2025, it has been determined
that the Order should be closed. Accordingly, this case is now closed.
Sincerely,
David Barrett
Acting Director, Central Region, OPS
Pipeline and Hazardous Materials Safety Administration
cc: Berry Croft, Facility Supervisor, St Louis Pipeline Operating LLC,
berry.croft@panamericanpipelines.com; stlouispipelinegm@outlook.com

32025029NOPV_Final Order_11102025_(24-297350)_text.pdf

U.S. Department
of Transportation
Pipeline and Hazardous
Materials Safety
Administration
1200 New Jersey Avenue, SE
Washington, DC 20590
November 10, 2025
VIA ELECTRONIC MAIL TO: tampapc@outlook.com
Robert Rose, President
St. Louis Pipeline Operating, LLC
4120 Higel Street
Sarasota, FL 34242
Re: CPF No. 3-2025-029-NOPV
Dear Mr. Rose:
Enclosed please find the Final Order issued in the above-referenced case. It makes findings of
violation and specifies actions that need to be taken to comply with the pipeline safety
regulations. When the terms of the compliance order are completed, as determined by the
Director, Central Region, this enforcement action will be closed. Service of the Final Order by e-
mail is effective upon the date of transmission and acknowledgement of receipt as provided
under 49 CFR § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Linda Daugherty
Acting Associate Administrator
for Pipeline Safety
Enclosures (Final Order and NOPV)
cc: David Barrett, Acting Director, Central Region, Office of Pipeline Safety, PHMSA
Greg Lipscomb, St. Louis Pipeline Operating, LLC,
greg.lipscomb@panamericanpipelines.com
Berry Croft, General Manager, St Louis Pipeline Operating LLC,
berry.croft@panamericanpipelines.com, stlouispipelinegm@outlook.com



Edric Kidd, National Pipeline Manager, St Louis Pipeline Operating LLC,
edric.kidd@panamericanpipelines.com
CONFIRMATION OF RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
____________________________________
In the Matter of )
St. Louis Pipeline Operating, LLC, ) CPF No. 3-2025-029-NOPV
)
)
)
Respondent. )
____________________________________)
FINAL ORDER
On August 15, 2025, pursuant to 49 CFR § 190.207, the Acting Director, Central Region, Office
of Pipeline Safety (OPS), issued a Notice of Probable Violation (Notice) to St. Louis Pipeline
Operating, LLC (Respondent). The Notice proposed finding that Respondent had violated the
pipeline safety regulations in 49 CFR Part 195. The Notice also proposed certain measures to
correct the violations. Respondent did not contest the allegations of violation or corrective
measures.
Pursuant to 49 CFR § 190.213, I find Respondent violated the pipeline safety regulations listed
below, as more fully described in the enclosed Notice, which is incorporated by reference:
49 CFR § 195.266 (Item 1) ─ Respondent failed to maintain complete records
that show 1) the total number of girth welds and the number nondestructively
tested, including the number of rejects and the disposition of each rejected weld;
2) the amount, location, and cover of each size of pipe installed; and 3) the
location of each valve for the Lambert Airport Project.
49 CFR § 195.406(a)(2) (Item 2) ─ Respondent failed to provide maximum
operating pressure records regarding the design pressure of the components on the
Lambert Airport Project.
These findings of violation will be considered prior offenses in any subsequent enforcement
action taken against Respondent.
Compliance Actions
Pursuant to 49 U.S.C. § 60118(b) and 49 CFR § 190.217, Respondent is ordered to take the
actions proposed in the enclosed Notice to correct the violations. The Director may grant an
extension of time to comply with any of the required items upon a written request timely



submitted by the Respondent and demonstrating good cause for an extension. Upon completion
of the ordered actions, Respondent may request that the Director close the case. Respondent
previously submitted evidence to show appropriate actions have been taken to correct the
violations. This evidence is currently under review by the Director. Failure to comply with this
Order may result in the assessment of civil penalties under 49 CFR § 190.223 or in referral to the
Attorney General for appropriate relief in a district court of the United States.
Warning Item
With respect to Item 3, the Notice alleged a probable violation of 49 CFR § 195.505(h), but did
not propose a civil penalty or compliance order for this item. Therefore, this is considered to be a
warning item. If OPS finds a violation of this provision in a subsequent inspection, Respondent
may be subject to future enforcement action.
The terms and conditions of this order are effective upon service in accordance with 49 CFR
§ 190.5.
___________________________________ __________________________
Linda Daugherty Date Issued
Acting Associate Administrator
for Pipeline Safety



U.S. Department
of Transportation
Pipeline and Hazardous
Materials Safety
901 Locust Street, Suite 480
Kansas City, MO 64106
NOTICE OF PROBABLE VIOLATION
and
PROPOSED COMPLIANCE ORDER
VIA ELECTRONIC MAIL TO: tampapc@outlook.com; stlouispipelinegm@outlook.com;
Edric.kidd@panamericanpipelines.com
August 15, 2025
Robert Rose, President
St. Louis Pipeline Operating, LLC
4120 Higel Street
Sarasota, FL 34242
CPF 3-2025-029-NOPV
Dear Mr. Rose:
From May 20, 2024 through October 18, 2024, representatives of the Pipeline and Hazardous
Materials Safety Administration (PHMSA), Office of Pipeline Safety (OPS), pursuant to Chapter
601 of 49 United States Code (U.S.C.), conducted an inspection of St. Louis Pipeline Operating,
LLC’s (SLPCO) records and facilities in Madison County, Illinois and St. Louis County,
Missouri.
As a result of the inspection, it is alleged that SLPCO has committed probable violations of the
Pipeline Safety Regulations, Title 49, Code of Federal Regulations (CFR). The items inspected
and the probable violations are:
1. § 195.266 Construction records.
A complete record that shows the following must be maintained by the operator
involved for the life of each pipeline facility:
(a) The total number of girth welds and the number nondestructively tested,
including the number rejected and the disposition of each rejected weld.
(b) The amount, location; and cover of each size of pipe installed.
(c) The location of each crossing of another pipeline.
(d) The location of each buried utility crossing.



(e) The location of each overhead crossing.
(f) The location of each valve and corrosion test station.
SLPCO failed to demonstrate that it maintained complete records that show the total number of
girth welds and the number of nondestructive tested, including the number of rejects and the
disposition of each rejected weld, as required by § 195.266(a). In addition, SLPCO failed to
demonstrate that it maintained records of the amount, location; and cover of each size of pipe
installed, as required by § 195.266(b). Furthermore, SLPCO failed to demonstrate that it
maintained records for the location of each valve, as required by § 195.266(f).
PHMSA inspectors requested during the on-site inspection the Lambert Airport Project records
for weld reports, facility drawings, construction drawings, as-built drawings, and Non-
Destructive Testing (NDT) reports, which would show the information required by
§§ 195.266(a), (b), and (f). SLPCO did not produce records during the on-site inspection.
PHMSA issued a Request for Specific Information (RFSI) to SLPCO on October 7, 2024,
requesting these records. SLPCO representatives verbally confirmed receipt of the RFSI.
However, SLPCO did not provide responsive documents to PHMSA, Central Region. Thus,
SLPCO failed to demonstrate that it maintained records complaint with §§ 195.266 (a), (b), and
(f). These records are critical to future decision making as it relates to, §§ 195.452(e) and (g)
determining risk factors for assessment scheduling and information analysis.
2. § 195.406 Maximum operating pressure.
(a) Except for surge pressures and other variations from normal operations, no
operator may operate a pipeline at a pressure that exceeds any of the following:
(1) The internal design pressure of the pipe determined in accordance with
§ 195.106. However, for steel pipe in pipelines being converted under § 195.5,
if one or more factors of the design formula (§ 195.106) are unknown, one of
the following pressures is to be used as design pressure:
(i) Eighty percent of the first test pressure that produces yield under section
N5.0 of Appendix N of ASME B31.8 (incorporated by reference, see
§ 195.3), reduced by the appropriate factors in §§ 195.106(a) and (e); or
(ii) If the pipe is 323.8 mm (12¾ in) or less outside diameter and is not tested
to yield under this paragraph, 200 p.s.i. (1379 kPa) gage.
(2) The design pressure of any other component of the pipeline.
(3) Eighty percent of the test pressure for any part of the pipeline which has
been pressure tested under Subpart E of this part.
(4) Eighty percent of the factory test pressure or of the prototype test pressure
for any individually installed component which is excepted from testing
under § 195.305.
(5) For pipelines under §§ 195.302(b)(1) and (b)(2)(i), that have not been
pressure tested under Subpart E of this part, 80 percent of the test pressure
or highest operating pressure to which the pipeline was subjected for 4 or
more continuous hours that can be demonstrated by recording charts or logs
made at the time the test or operations were conducted.
2



SLPCO failed to ensure its Lambert Airport Project did not operate at a pressure that exceeded
the design pressure of all pipeline components pursuant to § 195.406(a)(2). Specifically,
PHMSA requested records supporting the design pressure of the components of the SLPCO
pipelines. SLPCO provided the of Maximum Operating Pressure Record, but did not provide
adequate documentation related to the design pressures of the components in the pipeline system.
As a follow-up, PHMSA sent a Request for Specific Information to SLPCO on October 7, 2024,
which was verbally confirmed as received by its National Pipeline Manager. However, PHMSA
did not receive responsive documents. Absent documentation of the design pressure of the
components of the pipeline, SLPCO could not ensure its Lambert Airport Project did not operate
at a pressure that exceeded the design pressure of any other component of the pipeline, pursuant
to § 195.406(a)(2).
3. § 195.505 Qualification program.
Each operator shall have and follow a written qualification program. The program
shall include provisions to:
(a) . . . .
(h) After December 16, 2004, provide training, as appropriate, to ensure that
individuals performing covered tasks have the necessary knowledge and skills to
perform the tasks in a manner that ensures the safe operation of pipeline
facilities;
SLPCO failed to follow its written qualification program by not providing training, as
appropriate, to ensure that an individual performing a covered task had the necessary knowledge
and skills to perform the covered task in a safe manner, as required by § 195.505(h). During the
PHMSA inspection on October 17, 2024, a PHMSA inspector asked a SLPCO employee to take
readings from a rectifier. SLPCO records indicated the employee was qualified to perform the
OQ Task Code 003.0, “Obtain a Voltage and Current Output Reading from a Rectifier to Verify
Proper Performance (1:1),” but the employee did not demonstrate adequate knowledge of how to
perform the task safely and correctly. The employee acknowledged his lack of experience with
the task and indicated that he did not feel comfortable performing it, so the PHMSA inspector
withdrew the request. Additionally, when preparing to enter a deep vault to demonstrate valve
operation as covered in Task Code 063.4, “Locally Operate Valves on a Liquid Pipeline System
(1:1),” the PHMSA inspector stopped the SLPCO employee from proceeding due to a lack of
Confined Entry Permit and proper equipment to enter. SLPCO submitted a Confined Space
Training Review Form dated July 24, 2023 to PHMSA afterwards, but during the in-field
inspection of the pipeline, the employee did not know the requirements for entering a confined
space.
Proposed Civil Penalty
Under 49 U.S.C. § 60122 and 49 CFR § 190.223, you are subject to a civil penalty not to exceed
$272,926 per violation per day the violation persists, up to a maximum of $2,729,245 for a
related series of violations. For violation occurring on or after December 28, 2023 and before
December 30, 2024, the maximum penalty may not exceed $266,015 per violation per day the
violation persists, up to a maximum of $2,660,135 for a related series of violations. For violation
3



occurring on or after January 6, 2023 and before December 28, 2023, the maximum penalty may
not exceed $257,664 per violation per day the violation persists, up to a maximum of $2,576,627
for a related series of violations. For violation occurring on or after March 21, 2022 and before
January 6, 2023, the maximum penalty may not exceed $239,142 per violation per day the
violation persists, up to a maximum of $2,391,412 for a related series of violations. For violation
occurring on or after May 3, 2021 and before March 21, 2022, the maximum penalty may not
exceed $225,134 per violation per day the violation persists, up to a maximum of $2,251,334 for
a related series of violations. For violation occurring on or after January 11, 2021 and before
May 3, 2021, the maximum penalty may not exceed $222,504 per violation per day the violation
persists, up to a maximum of $2,225,034 for a related series of violations. For violation
occurring on or after July 31, 2019 and before January 11, 2021, the maximum penalty may not
exceed $218,647 per violation per day the violation persists, up to a maximum of $2,186,465 for
a related series of violations.
We have reviewed the circumstances and supporting documents involved in this case, and have
decided not to propose a civil penalty assessment at this time.
Proposed Compliance Order
With respect to Items 1 and 2 pursuant to 49 U.S.C. § 60118, the Pipeline and Hazardous Materials
Safety Administration proposes to issue a Compliance Order to St. Louis Pipeline Operating, LLC.
Please refer to the Proposed Compliance Order, which is enclosed and made a part of this Notice.
Warning Item
With respect to Item 3, we have reviewed the circumstances and supporting documents involved
in this case and have decided not to conduct additional enforcement action or penalty assessment
proceedings at this time. We advise you to promptly correct these items. Failure to do so may
result in additional enforcement action.
Enclosed as part of this Notice is a document entitled Response Options for Pipeline Operators
in Enforcement Proceedings. Please refer to this document and note the response options. All
material you submit in response to this enforcement action may be made publicly available. If
you believe that any portion of your responsive material qualifies for confidential treatment
under 5 U.S.C. § 552(b), along with the complete original document you must provide a second
copy of the document with the portions you believe qualify for confidential treatment redacted
and an explanation of why you believe the redacted information qualifies for confidential
treatment under 5 U.S.C. § 552(b).
Following your receipt of this Notice, you have 30 days to respond as described in the enclosed
Response Options. If you do not respond within 30 days of receipt of this Notice, this constitutes
a waiver of your right to contest the allegations in this Notice and authorizes the Associate
Administrator for Pipeline Safety to find facts as alleged in this Notice without further notice to
4



you and to issue a Final Order. If you are responding to this Notice, we propose that you submit
your correspondence to my office within 30 days from receipt of this Notice. The Region
Director may extend the period for responding upon a written request timely submitted
demonstrating good cause for an extension.
In your correspondence on this matter, please refer to CPF 3-2025-029-NOPV and, for each
document you submit, please provide a copy in electronic format whenever possible.
Sincerely,
David Barrett
Acting Director, Central Region, OPS
Pipeline and Hazardous Materials Safety Administration
cc: Barry Croft, Facility Supervisor, St Louis Pipeline Operating LLC,
stlouispipelinegm@outlook.com
Edric Kidd, National Pipeline Manager, St Louis Pipeline Operating LLC,
Edric.kidd@panamericanpipelines.com
Enclosures: Proposed Compliance Order
Response Options for Pipeline Operators in Enforcement Proceedings
5



PROPOSED COMPLIANCE ORDER
Pursuant to 49 United States Code § 60118, the Pipeline and Hazardous Materials Safety
Administration (PHMSA) proposes to issue to St. Louis Pipeline Operating, LLC, a Compliance
Order incorporating the following remedial requirements to ensure the compliance of St. Louis
Pipeline Operating, LLC, with the pipeline safety regulations:
A. In regard to Item number 1 of the Notice pertaining to failure to maintain construction
records, St. Louis Pipeline Operating, LLC must submit within 90 days of receipt of the
Final Order to the Director, PHMSA Central Region, Office of Pipeline Safety, complete
weld records, to include: the total number of girth welds, welds nondestructively tested,
welds rejected and the disposition of each rejected weld; the amount, location, and depth
of cover of each size of pipe installed; and the location of each valve and corrosion test
station. For any of the aforementioned information that SPLCO does not have or cannot
submit, SLPCO must provide a written plan within 90 days of receipt of the Final Order
to the Director, PHMSA Central Region, Office of Pipeline Safety, to supply the
information that would have been recorded in the required records.
B. In regard to Item number 2 of the Notice pertaining to failure to ensure it did not operate
at a pressure that exceeded the design pressure of any other component of the pipeline,
St. Louis Pipeline Operating, LLC, must submit within 90 days of receipt of the Final
Order to the Director, PHMSA Central Region, Office of Pipeline Safety, records to
support the established maximum operating pressure (MOP) such as the internal design
pressure of the pipe, the design pressure of any other component of the pipeline, and the
test pressure of the pipe and any component. In addition, any other records that show the
current maximum operating pressure. For any of the aforementioned information that
SPLCO does not have or cannot submit, SLPCO must provide a written plan within 90
days of receipt of the Final Order to the Director, PHMSA Central Region, Office of
Pipeline Safety, to demonstrate the pipeline components are commensurate with the
MOP.
C. It is requested (not mandated) that St. Louis Pipeline Operating, LLC, maintain
documentation of the safety improvement costs associated with fulfilling this Compliance
Order and submit the total the Director, PHMSA Central Region, Office of Pipeline
Safety. It is requested that these costs be reported in two categories: 1) total cost
associated with preparation/revision of plans, procedures, studies and analyses, and 2)
total cost associated with replacements, additions and other changes to pipeline
infrastructure.
6