# ENABLE GAS TRANSMISSION, LLC — Corrective Action Order

- **operation:** document
- **citation:** CPF 420031001H
- **title:** ENABLE GAS TRANSMISSION, LLC — Corrective Action Order
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2003-02-26
- **effective on:** Not available
- **summary:** CLOSED corrective action order.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-420031001h.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-420031001h.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-420031001h
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/420031001H
**body:**

Corrective Action Order involving ENABLE GAS TRANSMISSION, LLC. The dataset does not identify a cited regulation for this case. The case was opened on 2003-02-26 and is reported as closed as of 2014-01-06. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

420031001H_Closure_01062014.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420031001H/420031001H_Closure_01062014.pdf

420031001H_Closure_01062014_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420031001H/420031001H_Closure_01062014_text.pdf

420031001H_Closure_01062014_text.pdf

CERTIFIED MAIL - RETURN RECEIPT REQUESTED
January 6, 2014
Mr. Pete Kirsch
Sr. VP - Pipeline Operations and Engineering
Enable Gas Transmission, LLC
1111 Louisiana Street
Houston, TX 77002
CPF No. 4-2003-1001H
Dear Mr. Kirsch,
On February 14, 2003, Enable Gas Transmission, LLC (Enable), formerly Centerpoint Energy
Gas Transmission Company, experienced a failure of its Line 4-1-4 12-inch diameter pipeline
approximately 27.33 miles downstream of the Enid Compressor Station in Oklahoma. As a
result of the incident, the Pipeline and Hazardous Materials Safety Administration (PHMSA)
issued a Corrective Action Order (CAO), 4-2003-1001H, dated February 26, 2003, requiring
Enable to take corrective actions with respect to its pipeline system.
The cause of the failure was determined to be selective seam corrosion on the pipeline and
Enable presented a 10 year plan of identification and corrective measures designed to prevent
additional in-service failures. PHMSA monitored the actions taken within the integrity
verification process and reviewed records at Enable’s headquarters. PHMSA has determined that
Enable has substantially completed the requirements of the CAO.
Consequently, PHMSA has closed the CAO, CPF 4-2003-1001H.
Sincerely,
R. M. Seeley
Director, Southwest Region
Pipeline and Hazardous Materials Safety Administration