# NATURAL GAS PIPELINE CO OF AMERICA — Corrective Action Order

- **operation:** document
- **citation:** CPF 420051011H
- **title:** NATURAL GAS PIPELINE CO OF AMERICA — Corrective Action Order
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2005-05-26
- **effective on:** Not available
- **summary:** CLOSED corrective action order.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-420051011h.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-420051011h.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-420051011h
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/420051011H
**body:**

Corrective Action Order involving NATURAL GAS PIPELINE CO OF AMERICA. The dataset does not identify a cited regulation for this case. The case was opened on 2005-05-26 and is reported as closed as of 2011-01-05. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

420051011H_Closure_01052011.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420051011H/420051011H_Closure_01052011.pdf

420051011H_Closure_01052011_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420051011H/420051011H_Closure_01052011_text.pdf

cpf_420051011H.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420051011H/cpf_420051011H.pdf

420051011H_Closure_01052011_text.pdf

CERTIFIED MAIL - RETURN RECEIPT REQUESTED
January 5, 2011
Mr. M. Dwayne Burton
Vice President Gas Pipeline Operations and Engineering
Natural Gas Pipeline Company of America
500 Dallas Street, Suite 1000
Houston, TX 77002
CPF 4-2005-1011H
Dear Mr. Burton:
On May 13, 2005, Natural Gas Pipeline of America (NGPL) experienced a failure of its Gulf
Coast Mainline 36-inch #3 natural gas pipeline near Marshall, TX. As a result of the incident the
Pipeline and Hazardous Materials Administration (PHMSA) issued a Corrective Action Order
(CAO), 4-2005-1011H, dated May 26, 2005, requiring NGPL to take corrective actions with
respect to its Gulf Coast Mainline natural gas pipeline system.
The cause of the failure was determined to be Near-Neutral Stress Corrosion Cracking (SCC)
and NGPL presented a plan of corrective measures with annual updates designed to prevent
additional in-service failures. Through field and record inspections over the past five years,
PHMSA has determined that NGPL has substantially completed the requirements of the CAO.
Because of the ongoing nature of SCC issues, NGPL agreed to incorporate the processes of
detecting, evaluating, and remediating SCC developed during the work performed under the
CAO into your Operations and Maintenance procedures. Consequently, PHMSA believes that it
is not necessary to continue to monitor this work under the authority of the CAO. This case is
now closed.
Sincerely,
R. M. Seeley
Director, Southwest Region
Pipeline and Hazardous
Materials Safety Administration