# NATURAL GAS PIPELINE CO OF AMERICA (KMI) — Notice of Probable Violation

- **operation:** document
- **citation:** CPF 420051012
- **title:** NATURAL GAS PIPELINE CO OF AMERICA (KMI) — Notice of Probable Violation
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2005-06-15
- **effective on:** Not available
- **summary:** CLOSED notice of probable violation citing 192.745.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-420051012.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-420051012.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-420051012
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/420051012
**body:**

Notice of Probable Violation involving NATURAL GAS PIPELINE CO OF AMERICA (KMI). PHMSA's enforcement data identifies the cited regulation as 192.745. The case was opened on 2005-06-15 and is reported as closed as of 2006-10-18. Proposed civil penalty: $9,500. Assessed civil penalty: $9,500. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

420051012_Final Order_04102006.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420051012/420051012_Final%20Order_04102006.pdf

CPF_NO_4-2005-1012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420051012/CPF_NO_4-2005-1012.pdf

CPF_NO_4_2005_1012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420051012/CPF_NO_4_2005_1012.pdf

420051012_Final Order_04102006.pdf

US. D e m
of TfOnSportaHan
~lpulno and
nazardou,Md.rkb~ AdminirtroHon
400 fimmntl sweet. S.W.
-. D.C. 20580
Dwayne M. Burton
Vice President, Gas Pipelines Operations
Natural Gas Pipeline Company of America
Kinder Morgan, Inc.
500 Dallas St., Suite 1000
Houston, TX 77002-47 1 8
Re: CPF No. 4-2005-1012
Dear Mr. Burton:
Enclosed is the Final Order issued by the Associate Administrator for Pipeline Safety
in the above-referenced case. It makes a finding of violation, assesses a civil penalty of
$9,500, and specifies actions to be taken to comply with the pipeline safety regulations. The
penalty payment terms are set forth in the Final Order. When the civil penalty is paid and the
terms of the compliance order completed, as determined by the Director, Southwest Region,
this enforcement action will be closed. Your receipt of the Final Order constitutes service
under 49 C.F.R. 3 190.5.
Sincerely,
James Reynolds
Pipeline Compliance Registry
Office of Pipeline Safety
Enclosure
CERTIFIED MAIL - RETURN RECEIPT REOUESTED



DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, DC 20590
In the Matter of
1
Natural Gas Pipeline Company of America, ) CPF No. 4-2005-1012
a subsidiary of Kinder Morgan, Inc., 1
1
Respondent 1
FINAL ORDER
On June 14-18, 2004, pursuant to 49 U.S.C. fj 601 17, a representative of the Pipeline and
Hazardous Materials Safety Administration's Office of Pipeline Safety (PHMSA) conducted an
on-site pipeline safety inspection of Respondent's facilities and records in Texas and Oklahoma.
As a result of the inspection, the Director, Southwest Region, PHMSA, issued to Respondent, by
letter dated June 15,2005, a Notice of Probable Violation, Proposed Civil Penalty, and Proposed
Compliance Order (Notice). In accordance with 49 C3.R. 5 190.207, the Notice proposed
finding that Respondent had violated 49 C.F.R. 5 192.745 and proposed assessing a civil penalty
of $9,500 for the alleged violation. The Notice also proposed ordering Respondent to take
certain measures to correct the alleged violation.
Respondent responded to the Notice by letter dated July 20, 2005 (Response). Respondent
contested the allegation of violation, offered information to explain the allegation, and requested
that the proposed civil penalty be eliminated. Respondent did not request a hearing, and
therefore has waived its right to one.
FMDING OF VIOLATION
The Notice alleged Respondent violated 49 C.F.R. 6 192.745(a) by failing to partially operate
several transmission line valves and document their operation. Section 192.745(a) requires
Respondent to inspect and partially operate each transmission line valve that might be required
during an emergency at intervals not exceeding 15 months, but at least once each calendar year.
In its Response, Respondent acknowledged that inspection forms used to record several valve
inspections did not show that the valves had been partially operated. Respondent stated that the
valves were operated at the time of their inspection, but the employee performing the inspection
inadvertently did not record their operation on the designated inspection form. Respondent
submitted copies of the original inspection forms subsequently corrected to show that the valves



had been operated at the time of their inspection. Respondent also submitted three affidavits, all
dated July 12, 2005, signed by Respondent's Operations Specialist, Respondent's Operations
Supervisor and a contractor. The affidavits state that the valves were operated by Respondent's
Operations Specialist in accordance with Respondent's procedures at the time of the valves'
inspection.
The original valve inspection forms witnessed by PHMSA inspectors during their inspection did
not record that the valves had been operated in accordance with § 192.745(a}. When PHMSA
inspectors drew attention to the apparent noncompliance, Respondent corrected the forms by
having the employee responsible for the inspections mark on the forms that the valves had been
operated. Although Respondent stated in its response that the employee merely "finished
completing" the forms in front of the inspectors, the original valve inspections were performed
several months before the PHMSA inspection in June 2004. In a few cases, the valve inspections
occurred almost two years before the PHMSA inspection. Accordingly, I cannot find that the
employee was merely completing the forms when he made changes to the forms during the
PHMSA inspection. Nor do I find the affidavits submitted, which were signed between several
months and almost two years after the valve inspections occurred, ere sufficient to demonstrate
compliance with 5 192.745(a) and Respondent's procedures, which require Respondent to
inspect and partially operate the valves at intervals not exceeding 15 months (but at least once
each calendar year) and to document compliance on the designated inspection form.
Accordingly, I find Respondent violated 5 192.745(a) by failing to partially operate transmission
line valves that might be necessary during an emergency and document the operation.
ASSESSMENT OF PENALTY
Under 49 U.S.C. tj 60122, Respondent is subject to a civil penalty not to exceed $100,000 per
violation for each day of the violation up to a maximum of $1,000,000 for any related series of
violations. The Notice proposed a total civil penalty of $9,500 for the violation of 8 192.745ta).
49 U.S.C. 5 60122 and 49 C.F.R. § 190.225 require that, in determining the amount of the civil
penalty, I consider the following criteria: nature, circumstances, and gravity of the violation,
degree of Respondent's culpability, history of Respondent's prior offenses, Respondent's ability
to pay the penalty, good faith by Respondent in attempting to achieve compliance, the effect on
Respondent's ability to continue in business, and such other matters as justice may require.
Respondent did not provide information in mitigation of the proposed civil penalty beyond its
challenge to the violation. A -violation of 5 192.745(a) concerns the safety of valves that may be
needed during an emergency. Emergency valves must be operable at all times in order to
prevent and minimize danger to the public and environment during an emergency. Respondent's
failure to ensure the safe and reliable operation of emergency valves threatened public safety and
the environment.
Accordingly, having reviewed the record and considered the assessment criteria, I assess
Respondent a total civil penalty of $9,500 for the violation of $ 192.745ta). Respondent has the
ability to pay this penalty without adversely affecting its ability to continue in business.



Payment of the civil penalty must be made within 20 days of service. Payment may be made by
sending a certified check or money order (containing the CPF Number for this case) payable to
"U.S. Department of Transportation" to the Federal Aviation Administration, Mike Monroney
Aeronautical Center, Financial Operations Division (AMZ-300), P.O. Box 25082, Oklahoma
City, OK 73225.
Federal regulations (49 C.F.R. 5 89.21@)(3)) also permit this payment to he made by wire
transfer, through the Federal Reserve Communications System (Fedwire), to the account of the
U. S. Treasury. Detailed instructions are contained in the enclosure. Questions concerning wire
transfers should be directed to: Financial Operations Division (AMZ-300), Federal Aviation
Administration, Mike Monroney Aeronautical Center, P.O. Box 25082, Oklahoma City, OK
73 125; (405) 954-8893.
Failure to pay the $9,500 civil penalty will result in a c d of interest at the current annual rate
in accordance with 31 U.S.C. $ 3717, 31 C.F.R 901.9 and 49 C.F.R. 4 89.23. Pursuant to
those same authorities, a late penalty charge of six percent (6%) per annum will be charged if
payment is not made within 1 10 days of service. Furthermore, failure to pay the civil penalty
may result in referral of the matter to the Attorney General for appropriate action in a United
States District Court.
The Notice proposed a compliance order with respect to the violation of 49 C.F.R. 4 192.745(a).
Under 49 U.S.C. 4 601 18(a), each person who engages in the transportation of gas or who owns
or operates a pipeline facility is required to comply with the applicable safety standards
established under Chapter 60 1. Pursuant to the authority of 49 U.S.C. 5 60 1 1 8(b) and 49 C.F.R.
4 190.217, Respondent is ordered to take the following actions to ensure compliance with the
pipeline safety regulations applicable to its operations. Respondent must-
1. Achieve compliance with 49 C.F.R. $ 192.745(a) for each transmission line valve in the
Fritch District that might be required during an emergency. For the purpose of this
Order, the Fritch District includes Balko, Stinnet and Pampa Districts. Demonstrate
compliance by submitting sufficient evidence to show that each valve has been inspected
during the most recent calendar year(s) in accordance with 192.745(a) and
Respondent's Operations and Maintenance (ObM) procedure number 301 and Planning
Guide procedure 1-0306.
2. Complete Item 1 and submit documentation of compliance within 30 days of receipt of
this Order to the Director, Southwest Region, Office of Pipeline Safety, 870 1 S. Gessner
Dr., Suite 1 110, Houston, TX 77074-2949.
The Director, Southwest Region, may grant an extension of time to comply with any of the
required items upon a written request timely submitted by the Respondent demonstrating good
cause for an extension.



s
Failure to comply with this Final. Order may result in the assessment of civil penalties of up to
$1 00,000 per violation per day, or in the referral of the case for judicial enforcement.
Under 49 C.F.R. § 190.215, Respondent has a right to submit a Petition for Reconsideration of
this Final Order. The petition must be received within 20 days of Respondent's receipt of this
Final Order and must contain a brief statement of the issue(s). The filing of the petition
automatically stays the payment of any civil penalty assessed. All other terms of the order,
including any required corrective action, remain in full effect unless the Associate Administrator,
upon request, grants a stay. The terms and conditions of this Final Order are effective on receipt.
I
Date Issued
iate Administrator