# RIO VISTA ENERGY PARTNERS, LP — Notice of Probable Violation

- **operation:** document
- **citation:** CPF 420055007
- **title:** RIO VISTA ENERGY PARTNERS, LP — Notice of Probable Violation
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2005-01-07
- **effective on:** Not available
- **summary:** CLOSED notice of probable violation citing 195.402(a).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-420055007.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-420055007.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-420055007
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/420055007
**body:**

Notice of Probable Violation involving RIO VISTA ENERGY PARTNERS, LP. PHMSA's enforcement data identifies the cited regulation as 195.402(a). The case was opened on 2005-01-07 and is reported as closed as of 2008-02-07. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

420055007_Final Order_10142005.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420055007/420055007_Final%20Order_10142005.pdf

CPF420055007 Penn Octane Corporation.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420055007/CPF420055007%20Penn%20Octane%20Corporation.pdf

420055007_Final Order_10142005.pdf

@
U.S. Deponntent
of Trqnsportction
Pipeline ond
HqzordoLrs Jvldt€rEG!s Sdfefy
qdminEsrystion
4C0 Seventh Sy:et, S.vV
Washrngicn, D.C 205-e0
O.C:i i ,i :.,;i;*
Mr. Charles Handly
Executive Vice President
Penn Octane Corporation
820 Gessner Road, Suite 1285
Houston, TX 77024-4471
Re: CPF No. 4-2005-5007
Dear Mr. Handly:
Enclosed is the Final Order issued by the Associate Administrator for Pipeline Safety in
the above-referenced case. It makes findings of violation and specifies actions to be taken to
comply with the pipeline safety regulations. When the terms of the compliance order are
completed, as determined by the Director, Southwest Region, this enforcement action will be
closed. Your receiot of this Final Order constitutes service of that document under
49 C.F.R. $ 190.5.
Sincerely,
f\ /d
i,',*. fV>-
James Reynolds
Pipelinc Compliance RegistrY
Office of Pipeline Safety
Enclosure
cc: R.M. Seeley
Director, Southwest Region, OPS
CERTIFIE,D MAIL RETURN RECEIPT REOUESTED



DEPARTMENT OF TRANSPORTATION
PIPELINE AND FIAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF' PIPELINE SAFETY
WASHINGTON. DC 20590
In the Matter of
Penn Octane Corporation,
Respondent
CPF No. 4-2005-5007
FINAL ORDER
On March 29-31,2004, pursuant to 49 U.S.C. $ 601i7, a representative of the Office of Pipeline
Safety (OPS) conductcd an on-site pipeline saiety rnspection of Respondent's facilities and
records in Brownville, Texas" As a resrrlt of the inspection, the Director, Southwest Region,
OPS, issued to Respondent, by letter dated .lanuary 7, 2005, a Notice of Probable Violation and
Proposed Compliance Order (Notice)" In accordance with 49 C.F.R. $ 190.207, the Notice
proposed finding that Respondent had committed violations of 49 C.F.R. I 195.402(a) and
proposed that Respondent take ceftain measures to corect the alleged violations.
Respondent respondcd to the Notice by ietter dated January 2.5,2005 (Response). Respondent
did not contest the allegations of violation and provided information concerning the corrective
action it is taking. Respondent did not request a hearing, and therefore has waived its right to
one.
FINDINGS OF VIOLATION
In its Response, Respondent did not contest the violations alleged in the Notice. Accordingly, I
find that Rcspondent violated the following section of 49 C.F.R. Part 195, as more fully
described in the Noticc:
49 C.F.R. Q 195.a02(a) fzriling to have rvritten procedures for: (A) maintaining pressure
during pressure tests in accordance with $ i95.304; (B) pressure testing components in
accordance rvith $ 195.305; (C) using:r test medium in accordance with $ 195.306; (D)
testing tie-ins pursuant to $ 195.308; and (E) making and retaining a record of each
pressLlrc test in accordance with $ 195.310.
These findings of violation will be considered prior offenses in any subsequent enforcetncnt
action taken aeainst Respondent.



L
COfuIPLIANICE ORDER
The Notice proposed a compliance ordcr for the violations of 49 C.F.R. $ 195.a02(a). Under
49 U.S.C. $ 601 18(a), cach person rvho engages in the transpodation of hazardous liquids or who
owns or operates a pipeline facility is required to comply with the applicable safety standards
established under Chaptcr 60i. Pursuant to the authority of 49 U.S.C. $ 60118(b) and
49C.F.R. $ 190.217, Respondent is ordcrcd to take the following actions to ensure compliance
with the pipeline safety regulations applicable to its operations. Respondent must-
1. Establish written procedures for maintaining test pressure in accordance with $ 195.304.
2. Establish written procedures for testing components in accordance with $ 195.305.
3. Establish written procedures for using a test medium in accordance with I 195.306.
4. Establish written procedures for testing tie-ins pursuant to $ 195.308,
5. Establish written procedures for making and maintaining a record of each pressure test in
accordance with $ 195.310.
6, Implement the established procedures into the Operating and Maintenance Manual.
7. Complete each of the above items within 30 days of receipt of this Final Order and
submit documcntation of completion to the Director, Southwest Region, Office of
Pipeline Safety, Department of Transpoftation, 8701 South Gessner Drive, Suite 1110,
Houston, Texas 77074-2948.
The Director, Southwest Region, OPS may grant an extension of time to comply with any of the
required items upon a written request trmely submitted by the Respondent demonstrating good
cause for an extension.
Failure to comply r,vith this Final Order may result in the assessment of civil penalties of up to
$100,000 per violation per day, or in the referral of the case for judicial enforcement.
Under 49 C.F.R. " 190.215, Respondent has a right to submit a Petition for Reconsidcration of
this Final Order. The petition must be rcceived within 20 days of Respondent's receipt of this
Final Order and must contain a brief statement of thc issue(s). The terms of the order, including
anv required corrective action. remain in full effect unless the Associate Administrator, upon
,rqir.i4 grants a stay. The tenns ancl conclitions of this Final Order are effective on receipt.
ilCT 1 4, 1'-:1i5
Date Issued
Stacey $erard "Associafp Admtnistrator
for Pipeline Safety