# PHILLIPS 66 PIPELINE LLC — Notice of Probable Violation

- **operation:** document
- **citation:** CPF 420055034
- **title:** PHILLIPS 66 PIPELINE LLC — Notice of Probable Violation
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2005-08-31
- **effective on:** Not available
- **summary:** CLOSED notice of probable violation citing 195.264(a), 195.402(e)(9), 195.404(a)(1), 195.579(a), 195.579(c).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-420055034.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-420055034.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-420055034
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/420055034
**body:**

Notice of Probable Violation involving PHILLIPS 66 PIPELINE LLC. PHMSA's enforcement data identifies the cited regulations as 195.264(a),  195.402(e)(9),  195.404(a)(1),  195.579(a),  195.579(c). The case was opened on 2005-08-31 and is reported as closed as of 2006-09-01. Proposed civil penalty: $12,000. Assessed civil penalty: $12,000. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

420055034_Final Order_09012006.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420055034/420055034_Final%20Order_09012006.pdf

CPF_No_4-2005-5034.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420055034/CPF_No_4-2005-5034.pdf

420055034_Final Order_09012006.pdf

U.S. Department 400 Seventh Street, S.W.
of Transportation Washington, D.C. 20590
Pipeline and Hazardous
Materials Safety Administration
Ms. Meg Yaege
President
ConocoPhillips Pipeline Company
600 N. Dairy Ashford
Houston, TX 77079
Re: CPF No. 4-2005-5034
Dear Ms. Yaege:
Enclosed is the Final Order issued by the Associate Administrator for Pipeline Safety in the
above-referenced case. It makes findings of violation and assesses a civil penalty of $12,000. I
acknowledge receipt of and accept your wire transfer for $1 2,000 as payment in full of the civil
penalty assessed in the Final Order. The Final Order also acknowledges your completion of the
proposed compliance order items to comply with the pipeline safety regulations. This case is
now closed. Your receipt of the Final Order constitutes service. of that document under 49
C.F.R. 190.5
Sincerely,
James Reynolds
Pipeline Compliance Registry
Office of Pipeline Safety
Enclosure
cc: R.M. Seeley
Director, Southwest Region, OPS
CERTIFIED MAIL -RETURN RECEIPT REQUESTED



DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, DC 20590
ppp
)
In the Matter of )
)
ConocoPhillips Pipeline Company ) CPF NO. 4-2005-5034
1
Respondent )
FINAL ORDER
On August 3 1,2005, in accordance with 49 C.F.R. 8 190.207, the Director, Southwest Region,
Office of Pipeline Safety (OPS), issued Respondent a Notice of Probable Violation, Proposed
Civil Penalty and Proposed Compliance Order (Notice). The Notice proposed finding that
Respondent had committed violations of 49 C.F.R. Part 195 and proposed assessing a civil
penalty of $12,000 for one of the alleged violation. The Notice also proposed that Respondent
take certain measures to correct one of the alleged violations. Respondent submitted a wire
transfer in the amount of the proposed civil penalty ($12,000), waiving further right to respond
and authorizing the entry of this Final Order.
Pursuant to 49 C.F.R. 8 190.213 and 49 U.S.C. 8 60122, I find that Respondent violated the
following sections of 49 C.F.R. Part 195, as more fully described in the Notice:
49 C.F.R. 8 195.402(e)(9) (Notice Item 2) -failing to perform a post accident review for
the April 2003 12-inch Wood River line break.
49 C.F.R. 8 195.579(a) (Notice Item 4) -failing to measure internal corrosion of the
pipeline at the Borger Crude Terminal.
These findings of violation will be considered prior offenses in any subsequent enforcement
action taken against Respondent. Having reviewed the record and considered the assessment
criteria, I assess Respondent a civil penalty of $12,000 for violation of 8 195.579(a), already paid
by Respondent.
The Notice also proposed a Compliance Order with respect to the violation of 8 195.402(e)(9).
Under 49 U.S.C. 8 601 18(a), each person who engages in the transportation of hazardous liquids
or who owns or operates a pipeline facility is required to comply with the applicable safety



standards established under Chapter 60 1. The Regional Director has indicated that Respondent
has taken the following actions specified in the Proposed Compliance Order. Respondent has
performed a post accident review for the April 2003 12-inch Wood River line break and
submitted documentation of the review.
Accordingly, since compliance has been achieved with respect to this violation, the compliance
terms are not included in this Order.
WARNING ITEMS
The Notice did not propose a civil penalty or corrective action for Items 1, 3 and 5 in the Notice;
therefore, these are considered warning items. Respondent is warned that if it does not take
appropriate action to correct these items, enforcement action will be taken if a subsequent
inspection reveals a violation. The warnings were for -
49 C.F.R. tj 195.264 (Notice Item 1) -failing to maintain tank dike volumes at the same
level of the tank capacities volumes at the COP Greenville facility. Tank dike volumes
have been reduced over time by sediment or erosion; and
49 C.F.R. tj 195.404(a) (Notice Item 3) -failing to maintain current facility piping
diagrams; and
49 C.F.R. tj 195.579(c) (Notice Item 5) -failing to inspect the internal surface of a pipe
for evidence of corrosion when the pipe had been removed from the pipeline.
The terms and conditions of this Final Order are effective on receipt.
Date Issued
Pipeline Safety