# WSP USA INC. — Notice of Probable Violation

- **operation:** document
- **citation:** CPF 420055041
- **title:** WSP USA INC. — Notice of Probable Violation
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2005-10-13
- **effective on:** Not available
- **summary:** CLOSED notice of probable violation citing 195.452(b).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-420055041.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-420055041.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-420055041
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/420055041
**body:**

Notice of Probable Violation involving WSP USA INC.. PHMSA's enforcement data identifies the cited regulation as 195.452(b). The case was opened on 2005-10-13 and is reported as closed as of 2008-02-19. Proposed civil penalty: $5,000. Assessed civil penalty: $0. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

420055041_FinalOderClosure_02192008.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420055041/420055041_FinalOderClosure_02192008.pdf

420055041_finaloderclosure_02192008_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420055041/420055041_finaloderclosure_02192008_text.pdf

420055041_finaloderclosure_02192008_text.pdf

U S Department
of Transportation
Pipeline and Hazardous
Materials Safety
Administration
i 200 New Jersey Ave 5 E
Washington DC 20590
FEB Z 92008
Mr. Raghu S. Raghuraman
Vice President
PB Energy Storage Services, Inc.
11757 Katy Freeway, Suite 600
Houston, TX 77079
Re: CPF No. 4-2005-5041
Dear Mr. Raghuraman:
Enclosed is the Final Order issued in the above-referenced case, The Final Order withdraws the
violation alleged in the Notice of Probable Violation and Proposed Civil Penalty. Accordingly,
this case is now closed. Your receipt of the Final Order constitutes service under 49 C. F. R.
5 190. 5.
Sincerely,
Jeffrey D. Wiese
Associate Administrator
for Pipeline Safety
Enclosure
CERTIFIED MAIL — RETURN RECEIPT RE UESTED



DEPARTMENT OF TRANSPORTATION
PIPEI INE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D. C. 20590
In the Matter of
PB Energy Storage Services, Inc.
,
Respondent
CPF No. 4-2005-5041
FINAL ORDER
On May 10 through 13, 2005, pursuant to 49 U. S. C. ) 60117, representatives of the Pipeline and
Hazardous Materials Safety Administration, Office of Pipeline Safety (OPS), conducted an on-
site pipeline safety inspection of Respondent's integrity management program (IMP) in Houston,
Texas. As a result of the inspection, the Director, Southwest Region, OPS, issued to
Respondent, by letter dated October 13, 2005, a Notice of Probable Violation and Proposed Civil
Penalty (Notice). In accordance with 49 C. F. R. $ 190. 207, the Notice proposed finding that
Respondent had violated 49 C, F, R. $ 195. 452(b) and proposed assessing a civil penalty of
$5, 000 for the alleged violation,
Respondent responded to the Notice by letter dated November 7, 2005 (Response). Respondent
contested the allegation of violation, offered information in explanation, and requested that the
proposed civil penalty be eliminated. Respondent did not request a hearing, and therefore has
waived its right to one.
WITHDRAWAL OF ALLEGATION
Item 1 in the Notice alleged that Respondent violated 49 C. F. R. ) 195. 452(b), which states:
g 195. 452 — Pipeline integrity management in high consequence areas.
(a) 8'hich pipelines are covered by this section? This section applies to each
hazardous liquid pipeline and carbon dioxide pipeline that could affect a high
consequence area. . . . Covered pipelines are categorized as follows;. . .
(2) Category 2 includes pipelines existing on May 29, 2001, that were
owned or operated by an operator who owned or operated less than 500 miles
of pipeline subject to this part. . . ,
(b) 8%at program and practices must operators use to manage pipeline
integrity? Each operator of a pipeline covered by this section must:



(1) Develop a written integrity management program that addresses the
risks on each segment of pipeline in the first column of the following table not
later than the date in the second column. . .
Pi eline
Date
Cate o 2
Febru 18, 2003
(2) Include in the program an identification of each pipeline or pipeline
segment in the first column of the following table not later than the date in the
second column. . .
Pi eline
Cate or 2
Date
November 18, 2002
The Notice alleged that Respondent violated 49 C. F. R. $ 195. 452(b) by failing to meet the
deadlines in the integrity management rule for identification of covered segments and
development of an IMP. Specifically, the Notice alleged that Respondent acquired Category 2
pipeline facilities in April 2004, but did not identify covered segments or implement an IMP for
those facilities until November 15, 2004.
In its Response, Respondent acknowledged that it acquired the facilities in April 2004 and
completed development of its IMP in November 2004. Respondent explained, however, that
between April and November 2004 Respondent followed the IMP procedures of the prior
operator. Respondent noted that its own IMP referenced the existence of the prior operator's
IMP procedures and that documentation of the prior operator's program was available at the time
of the inspection. Respondent submitted documentation of the prior operator's program as well
as portions of its own IMP where the prior operator's program had been referenced.
AAer reviewing the documentation submitted, I find that Respondent operated the pipeline
facilities in question under the previous operator's IMP from April 2004 through November
2004, Based upon the foregoing, I am withdrawing the allegation of violation.
The terms and conditions of this Final Order shall be effective upon receipt.
FEB 1 9 2008
Date Issued
Jeffrey D. iese
Associate Administrator
for Pipeline Safety
- **truncated:** false