# MAGELLAN PIPELINE COMPANY, LP — Notice of Amendment

- **operation:** document
- **citation:** CPF 420065021M
- **title:** MAGELLAN PIPELINE COMPANY, LP — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2006-05-02
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 195.452(e), 195.452(f)(6), 195.452(i)(1), 195.452(j)(4), 195.452(k).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-420065021m.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-420065021m.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-420065021m
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/420065021M
**body:**

Notice of Amendment involving MAGELLAN PIPELINE COMPANY, LP. PHMSA's enforcement data identifies the cited regulations as 195.452(e),  195.452(f)(6),  195.452(i)(1),  195.452(j)(4),  195.452(k). The case was opened on 2006-05-02 and is reported as closed as of 2009-09-09. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

420065021M_OrderDirectingAmendment_07092009.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420065021M/420065021M_OrderDirectingAmendment_07092009.pdf

420065021M_OrderDirectingAmendment_07092009_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420065021M/420065021M_OrderDirectingAmendment_07092009_text.pdf

420065021M_OrderDirectingAmendment_07092009_text.pdf

JUL 09 2009
Mr. Richard A. Olson
Vice President, Transportation Operations
Magellan Midstream Partners, L.P.
One Williams Center
P.O. Box 22186
Tulsa, OK 74121-2186
Re: CPF No. 4-2006-5020
CPF No. 4-2006-5021M
Dear Mr. Olson:
Enclosed are the Final Order and the Order Directing Amendment issued by the Pipeline and
Hazardous Materials Safety Administration in the above-referenced companion cases. The Final
Order makes findings of violation, assesses a civil penalty of $147,500, and specifies certain
actions that need to be taken by Magellan to comply with the pipeline safety regulations. The
Order Directing Amendment makes a finding of inadequate procedures and requires that
Magellan make certain amendments to its written integrity management program.
The penalty payment terms are set forth in the Final Order. When the civil penalty has been paid
and the terms of the Compliance Order completed, as determined by the Director, Southwest
Region, PHMSA, CPF No. 4-2006-5020 will be closed. When the terms of the Order Directing
Amendment have been completed, as determined by the Director, Southwest Region, CPF No. 4-
2006-5021M will be closed. Your receipt of the Final Order and Order Directing Amendment
constitute service of those documents under 49 C.F.R. § 190.5.
Thank you for your cooperation in these matters.
Sincerely,
Jeffrey D. Wiese
Associate Administrator
for Pipeline Safety
Enclosure
cc: Paul E. Pratt, Esq., Magellan Midstream Partners, L.P.
Mr. Rod M. Seeley, Director, Southwest Region, PHMSA
CERTIFIED MAIL – RETURN RECEIPT REQUESTED [7005 0390 0005 6162 5012]



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
____________________________________
In the Matter of )
Magellan Midstream Partners, L.P., ) CPF No. 4-2006-5021M
)
)
)
Respondent. )
____________________________________)
ORDER DIRECTING AMENDMENT
Between April 11-15 and May 2-6, 2005, pursuant to 49 U.S.C. § 60117, representatives of the
Pipeline and Hazardous Materials Safety Administration’s Office of Pipeline Safety (OPS), and
its state agent, the Minnesota Office of Pipeline Safety, conducted an on-site pipeline safety
inspection of the integrity management program procedures and records of Magellan Midstream
Partners, L.P. (Magellan or Respondent), at the company’s offices in Tulsa, Oklahoma.
Magellan is a major energy supplier in the United States whose assets include an 8,500-mile
petroleum products and a 1,100-mile ammonia pipeline system.
As a result of the inspection, the Director, Southwest Region, OPS (Director), issued to
Respondent, by letter dated May 2, 2006, a Notice of Amendment (NOA). The NOA alleged
inadequacies in Respondent’s integrity management program and proposed to require the
company to revise its procedures.
Respondent responded to the NOA by letter dated June 2, 2006. Respondent initially contested
the allegations and requested a hearing. A joint hearing was held on September 21, 2006, in
Houston, Texas, on this case and the companion Notice of Probable Violation, Proposed Civil
Penalty, and Proposed Compliance Order (CPF No. 4-2006-5020). At the hearing, Magellan
withdrew its request to discuss the matters involved in this case and submitted a written
withdrawal of its hearing request by letter dated November 1, 2006. Respondent submitted
amended procedures to the Director by letter dated November 30, 2006, and provided
supplemental clarifications and amendments by emails in February and March 2007.
The Director has reviewed the amended procedures and additional materials submitted by
Respondent. Based on the result of this review, I find that Respondent’s amendments adequately
address Items 1, 2, 4, and 5 in the NOA. For the reasons below, I find that the revised
procedures still do not adequately address Item 3.



Item 3: The NOA alleged that Respondent’s integrity management program procedures were
inadequate with respect to 49 C.F.R. § 195.452(f)(6) and (i)(4). That regulation states:
§ 195.452 Pipeline integrity management in high consequence areas.
(a) . . . .
(f) What are the elements of an integrity management program? An
integrity management program begins with the initial framework. An
operator must continually change the program to reflect operating
experience, conclusions drawn from results of the integrity assessments, and
other maintenance and surveillance data, and evaluation of consequences of
a failure on the high consequence area. An operator must include, at
minimum, each of the following elements in its written integrity
management program . . .
(6) Identification of preventive and mitigative measures to protect
the high consequence area (see paragraph (i) of this section) . . . .
(i) What preventive and mitigative measures must an operator take to
protect the high consequence area? (1) General requirements. An operator
must take measures to prevent and mitigate the consequences of a pipeline
failure that could affect a high consequence area . . . .
(4) Emergency Flow Restricting Devices (EFRD). If an operator
determines that an EFRD is needed on a pipeline segment to protect a
high consequence area in the event of a hazardous liquid pipeline
release, an operator must install the EFRD. In making this
determination, an operator must, at least, consider the following
factors—the swiftness of leak detection and pipeline shutdown
capabilities, the type of commodity carried, the rate of potential leakage,
the volume that can be released, topography or pipeline profile, the
potential for ignition, proximity to power sources, location of nearest
response personnel, specific terrain between the pipeline segment and
the high consequence area, and benefits expected by reducing the spill
size.
Item 3 of the NOA alleged that Magellan’s procedures were inadequate because the decision-
making process for installing emergency flow restricting devices (EFRDs) did not include
justification for the spill volume exceedance decision point and application of the 28% factor to
the calculated drain-down volume. The NOA alleged that at the time of the OPS inspection, the
inspection team found inadequate technical justification for Respondent’s decision-making
process regarding installation of EFRDs, which was based on whether or not the assumed drain-
down volume exceeded the 15 minute full-flow spill volume. Additionally, the inspection team
found inadequate technical justification for limiting the assumed drain-down volume to 28% of
the total calculated drain-down volume. The NOA alleged that use of the 28% multiplier could
result in failing to identify locations where installation of EFRDs was necessary to protect High
Consequence Areas (HCAs).



2
The amended procedures submitted by Respondent adequately modified the EFRD installation
decision-making process to include justification regarding spill volume exceedance decision
points and to document the procedures on Respondent’s process flowsheets. Respondent did not,
however, provide adequate justification for the use of the 28% factor in determining potential
spill volume.
During the inspection, Magellan represented that the 28% figure came from a report conducted
by EDM Services for the California State Fire Marshal in March 1993, which is titled,
“Hazardous Liquid Pipeline Risk Assessment.” The report is based on 10 years (1981 through
1990) of pipeline failures and leaks in California.
For several reasons, I find that that 28% drain-down volume factor used in the California study
cannot be applied universally to other pipeline systems, including Magellan’s lines that were the
subject of this inspection. First, the factor was based upon limited historical accident data from
specific pipelines in California between 1981 and 1990. Second, specific topographical, pipeline
configuration, and operational differences existed between the pipelines studied in California and
those operated by Magellan. Third, the California study utilized the 28% factor as part of a
totally different type of risk analysis (i.e., a “cost-benefit” analysis) than the one involved in
PHMSA’s integrity management program (i.e., a “could-affect” analysis). Fourth, applying the
28% factor from the California study, which had already accounted for topography,
inappropriately reduced the maximum drain-down volume even further
Use of the 28% drain-down factor under these circumstances risks failing to identify locations
where installation of an EFRD is necessary to protect HCAs in accordance with § 195.452(f)(6)
and (i)(4).
Accordingly, based on the results of this review, I find that Respondent’s integrity management
program procedures are inadequate to ensure safe operation of its pipeline system in accordance
with the integrity management regulations. Pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R.
§ 190.237, Respondent is ordered to make the following revisions to its integrity management
program procedures. Respondent must—
1. Modify emergency flow restricting device (EFRD) installation procedures and apply
a justified factor to the calculated drain-down volume, in accordance with
§ 195.452(f)(6) and (i)(4), performing EFRD needs analysis using justified methods.
2. Submit the amended procedures to the Director within 30 days following receipt of
this Order Directing Amendment. With respect to the submission of amended
procedures, the Director may notify Respondent if any or all of the procedures have
been amended satisfactorily. If further modification is necessary, the Director may
require Respondent to modify the submission to cure the deficiencies. If the Director
finds deficiencies and orders further modification, Respondent must proceed to take
all action to correct its procedures to comply with the Director’s order. Respondent
must correct all deficiencies within the time specified by the Director and resubmit
the procedures for review.



3
3. If a resubmitted item is disapproved in whole or in part, the Director may again
require Respondent to correct the deficiencies in accordance with the foregoing
procedure, or the Director may otherwise proceed to enforce the terms of this Order.
The Director may grant an extension of time to comply with any of the required items upon a
written request timely submitted by the Respondent demonstrating good cause for an extension.
Failure to comply with this Order may result in administrative assessment of civil penalties not
to exceed $100,000 for each violation for each day the violation continues or in referral to the
Attorney General for appropriate relief in a district court of the United States.
The terms and conditions of this Order Directing Amendment shall be effective upon receipt.
___________________________________ __________________
Jeffrey D. Wiese Date Issued
Associate Administrator
for Pipeline Safety
- **truncated:** false