# PHILLIPS 66 PIPELINE LLC — Warning Letter

- **operation:** document
- **citation:** CPF 420085008W
- **title:** PHILLIPS 66 PIPELINE LLC — Warning Letter
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2008-03-17
- **effective on:** Not available
- **summary:** CLOSED warning letter citing 195.412(a), 195.442(a).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-420085008w.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-420085008w.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-420085008w
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/420085008W
**body:**

Warning Letter involving PHILLIPS 66 PIPELINE LLC. PHMSA's enforcement data identifies the cited regulations as 195.412(a),  195.442(a). The case was opened on 2008-03-17 and is reported as closed as of 2008-03-17. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

420085008W_warning_03172008.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420085008W/420085008W_warning_03172008.pdf

420085008W_warning_03172008.pdf

8701 South Gessner, Suite 1110
u.s. Department Houston, TX 77074
of Transportation
pipeline and
Hazardous Materials Safety
Administration
WARNING LETTER
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
March 17, 2008
Ms. Margaret A. Yaege, President
ConocoPhillips Pipeline Company
P.O. Box 2197
Houston, TX 77252-2197
CPF 4-2008-5008W
Dear Ms. Yaege:
On March 13-15, 2007 a representative of the Pipeline and Hazardous Materials Safety
Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code inspected a
segment of your ConocoPhillips Skelly-Belvieu 8-inch pipeline involved in an accident that
occurred on March 12, 2007 near Weatherford, TX.
As a result of the inspection, it appears that you have committed probable violations of the
Pipeline Safety Regulations, Title 49, Code of Federal Regulations. The items inspected and
the probable violation(s) are:
1. 195.412 Inspection of rights-of-way and crossings under navigable waters.
(a) Each operator shall, at intervals not exceeding 3 weeks, but at least 26 times
each calendar year, inspect the surface conditions on or adjacent to each pipeline
right-of-way. Methods of inspection include walking, driving, flying or other
appropriate mean of traversing the right-of-way.
It does not appear that the ConocoPhillips aerial patrol was performed on the pipeline segment
specified in the operator's records, or that an error was made in the patrol documentation of
activity along the pipeline corridor.
An accident occurred on March 12, 2007 where a contractor, C&J Construction, damaged the
ConocoPhillips Skelly-Belvieu 8-inch pipeline while excavating to construct a pipeline for
Crosstex Energy. ConocoPhillips records indicate that an aerial patrol of the Skelly-Belvieu 8



inch pipeline between Boonesville Station and Carlos Station was performed on March 7, 2007.
This patrol reported "NO NEW ACTIVITY" The prior aerial patrol on February 27 noted a line
crossing south of Pride Station but no activity was documented in the area of the accident.
According to records, a second interstate pipeline operator with a pipeline crossing in the area
of the accident also patrolled on March 7, 2007. However, this aerial patrol documented a
"Large trencher is cutting across line," and immediately took actions to dispatch personnel to the
site and mark their pipeline in the same general area where the ConocoPhillips pipeline was
damaged. While the location of the construction provided by the contractor and described on
the one-call ticket does not appear to be accurate, the aerial patrol for the second interstate
pipeline operator served its intended purpose by spotting the construction activity and alerting
operations personnel on the ground so that actions could be taken to avert potential damage to
their pipeline. Given that the second interstate pipeline's aerial patrol spotted the construction
activity in the same area and on the same day as the ConocoPhillips patrol, it is difficult to
understand why the ConocoPhillips aerial patrol reported no activity.
2. 195.442 Damage prevention program.
(a) Except as provided in paragraph (d) of this section, each operator of a buried
pipeline must carry out, in accordance with this section, a written program to
prevent damage to that pipeline from excavation activities. For the purpose of this
section, the term "excavation activities" includes excavation, blasting, boring,
tunneling, backfilling, the removal of aboveground structures by either explosive
or mechanical means, and other earthmoving operations.
The ConocoPhillips procedures for damage prevention from excavation activities include forms
to document the response by the operator's line locators to one-call notifications. Some of
these forms were not properly completed so that the one-call response or excavation involving
the ConocoPhillips pipeline was clearly documented.
A PHMSA review of the ConocoPhillips documentation for responses to one-call notifications
revealed that the documents that are part of the damage prevention procedures did not contain
all of the information specified on the form. In addition, some of the notes on the one call tickets
intended to document the ConocoPhillips response were cryptic and difficult to understand.
While it does not appear that the poor documentation was a contributor to the March 12, 2007
accident involving the Skelly-Belvieu 8-inch pipeline, ConocoPhillips should ensure that all
required forms and information are completed as required by the operator's written damage
prevention program.
Under 49 United States Code, § 60122, you are subject to a civil penalty not to exceed
$100,000 for each violation for each day the violation persists up to a maximum of $1,000,000
for any related series of violations. We have reviewed the circumstances and supporting
documents involved in this case, and have decided not to conduct additional enforcement action
or penalty assessment proceedings at this time. We advise you to correct the item(s) identified
in this letter. Failure to do so will result in ConocoPhillips Pipeline being subject to additional
enforcement action.
No reply to this letter is required. If you choose to reply, in your correspondence please refer to
CPF 4-2008-5008W. Be advised that all material you submit in response to this enforcement
2



action is subject to being made publicly available. If you believe that any portion of your
responsive material qualifies for confidential treatment under 5 U.S.C. 552(b), along with the
complete original document you must provide a second copy of the document with the portions
you believe qualify for confidential treatment redacted and an explanation of Why you believe
the redacted information qualifies for confidential treatment under 5 U.S.C. 552(b).
Sincerely,
R. M. Seeley
Director, Southwest Region
Pipeline and Hazardous
Materials Safety Administration
3
- **truncated:** false
- **body characters:** 6377