# WEST TEXAS GAS INC — Notice of Probable Violation

- **operation:** document
- **citation:** CPF 420111006
- **title:** WEST TEXAS GAS INC — Notice of Probable Violation
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2011-05-24
- **effective on:** Not available
- **summary:** CLOSED notice of probable violation citing 190.213.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-420111006.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-420111006.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-420111006
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/420111006
**body:**

Notice of Probable Violation involving WEST TEXAS GAS INC. PHMSA's enforcement data identifies the cited regulation as 190.213. The case was opened on 2011-05-24 and is reported as closed as of 2011-11-22. Proposed civil penalty: $108,700. Assessed civil penalty: $108,700. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

420111006_Final Order_11222011.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420111006/420111006_Final%20Order_11222011.pdf

420111006_Final Order_11222011_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420111006/420111006_Final%20Order_11222011_text.pdf

420111006_NOPV PCP_05242011.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420111006/420111006_NOPV%20PCP_05242011.pdf

420111006_NOPV PCP_05242011_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420111006/420111006_NOPV%20PCP_05242011_text.pdf

420111006_Final Order_11222011_text.pdf

NOV 22 2011
Mr. J. L. Davis
President and CEO
West Texas Gas, Inc.
211 North Colorado Street
Midland, TX 79701
Re: CPF No. 4-2011-1006
Dear Mr. Davis:
Enclosed please find the Final Order issued in the above-referenced case. It makes a finding of
violation and assesses a civil penalty of $108,700. This letter acknowledges receipt of payment
of the full penalty amount, by wire transfer, dated June 13, 2011. This enforcement action is
now closed. Service of the Final Order by certified mail is deemed effective upon the date of
mailing, or as otherwise provided under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Jeffrey D. Wiese
Associate Administrator
for Pipeline Safety
Enclosure
cc: Mr. Alan Mayberry, Deputy Associate Administrator for Field Operations, Pipeline Safety
Mr. Rod M. Seeley, Director, Southwest Region, PHMSA
CERTIFIED MAIL - RETURN RECEIPT REQUESTED [71791000164202897532]



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
____________________________________
In the Matter of )
West Texas Gas, Inc., ) CPF No. 4-2011-1006
)
)
)
Respondent. )
____________________________________)
FINAL ORDER
On September 13, 2006, pursuant to 49 U.S.C. § 60118(b), the Associate Administrator, Office
of Pipeline Safety (OPS), Pipeline and Hazardous Materials Safety Administration (PHMSA),
issued a Final Order to West Texas Gas, Inc. (WTG), finding that WTG committed violations of
the pipeline safety regulations, including 49 C.F.R. §§ 192.553(b), 192.555(b)(1), and
192.603(b), for failing to follow uprating requirements to increase the Maximum Allowable
Operating Pressure (MAOP) of WTG’s Dalhart District pipeline system, an interstate natural gas
pipeline in Dalhart, Texas (Final Order).
1 WTG operates natural gas distribution systems,
natural gas transmission lines, oil & gas production, gas gathering and processing, and refined
products distribution facilities in Texas and Oklahoma.2
PHMSA assessed a civil penalty of $60,000 in the Final Order and directed WTG to take specific
actions to comply with the cited regulations. Specifically, the Final Order required WTG to
determine the MAOP of the Dalhart District pipeline system in accordance with
49 C.F.R. § 192.619 and to submit the results and supporting documentation to the Director,
Southwest Region, OPS (Director). WTG was also required to reduce the operating pressure of
the line, if necessary, to ensure that the system operated within the MAOP established in
accordance with 49 C.F.R. § 192.619 (Compliance Item #3).
3
On June 22, 2010, OPS conducted a follow-up inspection to determine compliance with the Final
Order. As a result of the inspection, the Director issued to Respondent, by letter dated
May 24, 2011, a Notice of Probable Violation and Proposed Civil Penalty (Notice) alleging non-
compliance with Item #3 of the Compliance Order issued in CPF No. 4-2004-1007. In
accordance with 49 C.F.R. § 190.207, the Notice proposed finding that WTG had violated the
Final Order and assessing a civil penalty of $108,700 pursuant to 49 U.S.C. § 60122.4
1 See, In the Matter of West Texas Gas, Inc., CPF No. 4-2004-1007 (September 13, 2006).
2 See http://www.westtexasgas.com/profile_history.htm (last accessed October 31, 2011).
3 Final Order, at 8.



2
WTG responded to the Notice by letter dated June 13, 2011 (Response). WTG did not contest
the probable violation and paid the proposed civil penalty of $108,700, as provided in 49 C.F.R.
§ 190.227. Payment of the penalty serves to close the case with prejudice to Respondent.
FINDING OF VIOLATION
In its Response, WTG did not contest the allegation in the Notice that it violated Compliance
Item 3 of the Final Order, which required Respondent to:
Determine the MAOP of the Dalhart District pipeline system in
accordance with 49 C.F.R. § 192.619 and submit the results and
supporting documentation to the Director, Southwest Region. If necessary,
reduce operating pressure of the pipeline system to ensure that the pipeline
system is operated within MAOP in accordance with 49 C.F.R. § 192.619.
Complete this item within 30 days of receipt of this Order.
The Dalhart 22" mainline system had a documented MAOP of 150 psig that WTG established by
pressure testing in accordance with §192.619(a)(2)(ii). WTG was required by Compliance Item
#3 to maintain the pressure on the pipeline at or below 150 psig until WTG could establish or
confirm a higher MAOP in accordance with applicable uprating regulations.
On May 1, 2007, PHMSA received a letter from WTG addressing the uprating of a portion of the
Dalhart line and clarifying that the 20-mile Northern Segment of the Dalhart 22" mainline
(Northern Segment), which was not included in this uprating process, would continue to operate
at the lower pressure of 150 psig.5
On July 2, 2008, PHMSA received another letter from WTG stating that the 84 miles of the 22"
mainline system was now configured in three segments and further confirming that the Northern
Segment would remain in service at an MAOP of 150 psig. 6
As mentioned above, in June 2010, OPS conducted a follow-up inspection to review pressure
records dated between September 13, 2006 (date of the Final Order) and June 2010, for the
Brewster and the Valley Farmer's Check Station. OPS discovered that WTG had exceeded the
150 psig MAOP for the Northern Segment for 159 days between October 13, 2006, and
June 22, 2010, in direct violation of the Final Order. During the inspection, WTG personnel
stated that the pressure had been increased on this portion of the line by manually adjusting
regulator set-points to increase line flow during periods of high demand.7
4 49 U.S.C. § 60122 authorizes PHMSA to issue a civil penalty for a violation of the statute, a regulation, or an
order.
5 OPS Pipeline Safety Violation Report (May 24, 2011), Exhibit B.
6 Violation Report, Exhibit C.
7 Violation Report, at 3.



3
The Final Order required WTG to maintain a pressure of 150 psig for the Northern Segment until
it could establish a higher MAOP pursuant to the uprating regulations. By operating this section
of the line above the MAOP of 150 psig, WTG violated the Final Order.
ASSESSMENT OF PENALTY
Under 49 U.S.C. § 60122, Respondent is subject to an administrative civil penalty not to exceed
$100,000 per violation for each day of the violation, up to a maximum of $1,000,000 for any
related series of violations. In determining the amount of a civil penalty under 49 U.S.C.
§ 60122 and 49 C.F.R. § 190.225, I must consider the following criteria: the nature,
circumstances, and gravity of the violation, including adverse impact on the environment; the
degree of Respondent’s culpability; the history of Respondent’s prior offenses; the Respondent’s
ability to pay the penalty and any effect that the penalty may have on its ability to continue doing
business; and the good faith of Respondent in attempting to comply with the pipeline safety
regulations. In addition, I may consider the economic benefit gained from the violation without
any reduction because of subsequent damages, and such other matters as justice may require.
Compliance Item 3: The Notice proposed a civil penalty of $108,700 for failing to comply with
the Final Order issued on September 13, 2006. WTG did not contest the amount of the civil
penalty and paid the full amount on June 13, 2011.
The proposed civil penalty of $108,700 is based on the civil penalty assessment factors listed in
49 C.F.R. § 190.225, including but not limited to, gravity, circumstances, culpability, duration of
the violation, and prior compliance history. WTG’s failure to comply with the Final Order posed
a significant threat to pipeline integrity by raising the operating pressure of the line above the
required MAOP. In terms of culpability, the evidence in the record provides no plausible
explanation as to why WTG disregarded the requirements of the Final Order. For this reason, I
find Respondent fully culpable for its repeat violations, which extended over a period of 159
days. Finally, PHMSA considered WTG’s prior enforcement history in calculating the proposed
civil penalty. Having reviewed the penalty factors and the facts of this case, I find that the
proposed civil penalty of $108,700 is justified. Accordingly, I assess Respondent a civil penalty
of $108,700, which has already been remitted.
The terms and conditions of this Final Order are effective upon service in accordance with
49 C.F.R. § 190.5.
___________________________________ __________________________
Jeffrey D. Wiese Date Issued
Associate Administrator
for Pipeline Safety
- **truncated:** false
- **body characters:** 9671