{"operation":"document","citation":"CPF 420115002M","title":"WSP USA INC. — Notice of Amendment","source_type":"enforcement","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2011-01-27","effective_on":null,"summary":"CLOSED notice of amendment citing 195.452(f), 195.452(k).","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-enforcement-420115002m.json","markdown":"https://regulus.evalyn.ai/document/phmsa-enforcement-420115002m.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-enforcement-420115002m","source_url":"https://primis.phmsa.dot.gov/enforcement-data/case/420115002M","body":"Notice of Amendment involving WSP USA INC.. PHMSA's enforcement data identifies the cited regulations as 195.452(f),  195.452(k). The case was opened on 2011-01-27 and is reported as closed as of 2011-04-04. Open the official case record for notices, responses, orders, and the latest status.\n\nOfficial case documents:\n\n420115002M_Closure_04042011.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420115002M/420115002M_Closure_04042011.pdf\n\n420115002M_Closure_04042011_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420115002M/420115002M_Closure_04042011_text.pdf\n\n420115002M_NOA_01272011.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420115002M/420115002M_NOA_01272011.pdf\n\n420115002M_NOA_01272011_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420115002M/420115002M_NOA_01272011_text.pdf\n\n420115002M_Operator Response to NOA_02182011.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420115002M/420115002M_Operator%20Response%20to%20NOA_02182011.pdf\n\n420115002M_Closure_04042011_text.pdf\n\nCERTIFIED MAIL - RETURN RECEIPT REQUESTED\nApril 4, 2011\nMr. Tim Reichwein\nVice President Operations\nPB Energy Storage Services, Inc\n16285 Park Ten Place\nHouston, Texas 77084\nCPF 4-2011-5002M\nDear Mr. Reichwein:\nOn October 4-7, 2010, representatives of the Pipeline and Hazardous Materials Safety\nAdministration (PHMSA) inspected PB Energy Storage Services Inc. Integrity Management\nProgram. As a result of the inspection, PBE was issued a Notice of Amendment on January 27,\n2011. This Notice proposed amendment of your procedures to assure safe operation of your\npipeline facilities.\nPBE submitted its amended procedures on February 21, 2011. My staff reviewed the amended\nprocedures, and it appears that the inadequacies outlined in this Notice of Amendment have been\ncorrected.\nThis letter is to inform you no further action is necessary and this case is now closed. Thank you\nfor your cooperation.\nSincerely,\nR. M. Seeley\nDirector, Southwest Region\nPipeline and Hazardous\nMaterials Safety Administration","truncated":false,"body_characters":2048}