# MAGELLAN PIPELINE COMPANY, LP — Corrective Action Order

- **operation:** document
- **citation:** CPF 420115006H
- **title:** MAGELLAN PIPELINE COMPANY, LP — Corrective Action Order
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2011-03-01
- **effective on:** Not available
- **summary:** CLOSED corrective action order.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-420115006h.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-420115006h.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-420115006h
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/420115006H
**body:**

Corrective Action Order involving MAGELLAN PIPELINE COMPANY, LP. The dataset does not identify a cited regulation for this case. The case was opened on 2011-03-01 and is reported as closed as of 2012-07-18. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

420115006H_CAO_03012011.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420115006H/420115006H_CAO_03012011.pdf

420115006H_CAO_03012011_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420115006H/420115006H_CAO_03012011_text.pdf

420115006H_Closure_07182012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420115006H/420115006H_Closure_07182012.pdf

420115006H_Closure_07182012_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420115006H/420115006H_Closure_07182012_text.pdf

420115006H_Closure_07182012_text.pdf

CERTIFIED MAIL - RETURN RECEIPT REQUESTED
July 18, 2012
Mr. Michael Pearson
Senior Vice President of Technical Services
Magellan Pipeline Company, L.P.
One Williams Center
Mail Drop 27
Tulsa, OK 74172
CPF 4-2011-5006H
Dear Mr. Pearson:
On February 24, 2011, Magellan Pipeline Company, L.P. (Magellan) experienced a failure of its
18-inch diameter products pipeline in Texas City, TX. As a result of the accident the Pipeline
and Hazardous Materials Administration (PHMSA) issued a Corrective Action Order (CAO), 4-
2011-5006H, dated March 1, 2011, requiring Magellan to take corrective actions with respect to
its pipeline system.
The cause of the failure was determined to be seam failure in the ERW pipe and Magellan
presented a plan of corrective measures designed to prevent additional in-service failures.
PHMSA monitored the repairs made and reviewed the hydrostatic test performed as required, to
determine that Magellan has substantially completed the requirements of the CAO.
Consequently, PHMSA has closed the CAO, CPF 4-2011-5006H.
Sincerely,
R. M. Seeley
Director, Southwest Region
Pipeline and Hazardous Materials Safety Administration