# PLAINS MARKETING, L.P. — Notice of Probable Violation

- **operation:** document
- **citation:** CPF 420115010
- **title:** PLAINS MARKETING, L.P. — Notice of Probable Violation
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2011-07-13
- **effective on:** Not available
- **summary:** CLOSED notice of probable violation citing 195.52(a), 195.54(a).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-420115010.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-420115010.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-420115010
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/420115010
**body:**

Notice of Probable Violation involving PLAINS MARKETING, L.P.. PHMSA's enforcement data identifies the cited regulations as 195.52(a),  195.54(a). The case was opened on 2011-07-13 and is reported as closed as of 2012-01-10. Proposed civil penalty: $10,000. Assessed civil penalty: $10,000. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

420115010_Final Order_11162011.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420115010/420115010_Final%20Order_11162011.pdf

420115010_Final Order_11162011_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420115010/420115010_Final%20Order_11162011_text.pdf

420115010_NOPV PCP_07132011.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420115010/420115010_NOPV%20PCP_07132011.pdf

420115010_NOPV PCP_07132011_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420115010/420115010_NOPV%20PCP_07132011_text.pdf

420115010_Operator Response to Notice_08082011.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420115010/420115010_Operator%20Response%20to%20Notice_08082011.pdf

420115010_Final Order_11162011_text.pdf

NOV 16 2011
Mr. Phil Smith
Vice President of Operations
Plains Marketing, L.P.
333 Clay St.
Suite 1600
Houston, TX 77002
Re: CPF No. 4-2011-5010
Dear Mr. Smith:
Enclosed please find the Final Order issued in the above-referenced case. It makes findings of
violation and assesses a civil penalty of $10,000. The penalty payment terms are set forth in the
Final Order. This enforcement action closes automatically upon receipt of payment. Service of
the Final Order by certified mail is deemed effective upon the date of mailing, or as otherwise
provided under 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Jeffrey D. Wiese
Associate Administrator
for Pipeline Safety
Enclosure
cc: Mr. R.M. Seeley, Director, Southwest Region, PHMSA
Mr. Alan Mayberry, Deputy Associate Administrator for Field Operations, Pipeline Safety
Mr. Jordan Janak, Senior Director, Environmental & Regulatory Compliance, Plains
Marketing, L.P.
CERTIFIED MAIL - RETURN RECEIPT REQUESTED [71791000164202879798]



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
____________________________________
)
In the Matter of )
)
Plains Marketing, L.P., ) CPF No. 4-2011-5010
)
Respondent. )
____________________________________)
FINAL ORDER
From May through July 2011, pursuant to 49 U.S.C. § 60117, a representative of the Pipeline
and Hazardous Materials Safety Administration (PHMSA), Office of Pipeline Safety (OPS),
investigated a hazardous liquid incident that occurred on September 12, 2010, in St. James
Terminal, St. James, LA. Plains Marketing, L.P. (Plains), is a wholly-owned operating
subsidiary of Plains All American Pipeline, L.P., that transports, stores, terminals and markets
crude oil, refined products and liquefied petroleum gas. Plains’ system includes roughly 16,000
miles of active crude and refined products pipelines and gathering systems.1
As a result of the investigation, the Director, Southwest Region, OPS (Director), issued to
Respondent, by letter dated July 13, 2011, a Notice of Probable Violation and Proposed Civil
Penalty (Notice), which also included a warning pursuant to 49 C.F.R. § 190.205. In accordance
with 49 C.F.R. § 190.207, the Notice proposed finding that Plains had violated
49 C.F.R. § 195.54 and proposed assessing a civil penalty of $10,000 for the alleged violation.
The warning item required no further action, but advised the operator to correct the probable
violation.
FINDING OF VIOLATION
In its Response, Plains did not contest the allegation in the Notice that it violated 49 C.F.R. Part
195, as follows:
Item 2: The Notice alleged that Respondent violated 49 C.F.R. § 195.54(a), which states:
§ 195.54 Accident reports.
(a) Each operator that experiences an accident that is required to be
reported under § 195.50 shall as soon as practicable, but not later than 30
1 See 10-K, available at http://www.b2i.us/profiles/investor/secxml.asp?Bzid=789&fg=1.



2
days after discovery of the accident, prepare and file an accident report on
DOT Form 7000-1, or a facsimile.
The Notice alleged that Respondent violated 49 C.F.R. § 195.54(a) by failing to prepare and file
an accident report on DOT Form 7000-1, or a facsimile, as soon as practicable, but not later than
30 days following an accident required to be reported under § 195.50. Specifically, the Notice
alleged that on September 12, 2010, Plains experienced a hazardous liquid accident but did not
file an original report until January 12, 2011, approximately four months after the accident
occurred.
While the Respondent did not contest this allegation of violation, it provided a written
explanation for the delay and included documentation to support mitigation of the proposed
penalty. I will address these arguments in the Assessment of Penalty section below.
Accordingly, based upon a review of all of the evidence, I find that Respondent violated 49
C.F.R. § 195.54(a) by failing to prepare and file an accident form on DOT Form 7000-1, or a
facsimile, as soon as practicable, but not later than 30 days after discovery of an accident
required to be reported under § 195.50.
ASSESSMENT OF PENALTY
Under 49 U.S.C. § 60122, Respondent is subject to an administrative civil penalty not to exceed
$100,000 per violation for each day of the violation, up to a maximum of $1,000,000 for any
related series of violations. In determining the amount of a civil penalty under 49 U.S.C.
§ 60122 and 49 C.F.R. § 190.225, I must consider the following criteria: the nature,
circumstances, and gravity of the violation, including adverse impact on the environment; the
degree of Respondent’s culpability; the history of Respondent’s prior offenses; the Respondent’s
ability to pay the penalty and any effect that the penalty may have on its ability to continue doing
business; and the good faith of Respondent in attempting to comply with the pipeline safety
regulations. In addition, I may consider the economic benefit gained from the violation without
any reduction because of subsequent damages, and such other matters as justice may require.
The Notice proposed a total civil penalty of $10,000 for the violation cited above.
Item 2: The Notice proposed a civil penalty of $10,000 for Respondent’s violation of 49 C.F.R.
§ 195.54(a), for failing to prepare and file an accident report on DOT Form 7000-1, or a
facsimile, as soon as practicable, but not later than 30 days following an accident required to be
reported under § 195.50. The Respondent did not contest this Item.
According to Plains, a new employee neglected to electronically submit the required document
on October 11, 2010; however, a “draft” form of the document was created, which Plains
attached to its Response.2
Respondent’s argument notwithstanding, the actual accident report
was not submitted to PHMSA until January 12, 2011. Between the date the “draft” was prepared
and the date PHMSA inspectors discovered the delay, Plains did not contact PHMSA to
2 In its Response, Plains states that this draft was designated “Draft Number 4000” and was completed on October
11, 2010. Response, at 1.



3
self-report its failure to submit a timely report. As a result, I decline to find that Plains has
presented evidence sufficient to justify a reduction in the proposed penalty.
The Respondent further argues that the violation “did not result in any threat or impact to the
safety and health of the public or the environment.
to file reports will rarely result in a threat of the nature contemplated by the Respondent.
However, the fact that a requirement is administrative does not negate its importance or potential
impact on safety. Written accident reports provide important information to PHMSA and the
public on the nature of said incidents and why they occur. In determining the facilities involved,
the accident type, and extent of harm to public and property, PHMSA determines whether there
is a need to take a closer look at the operations and maintenance of a particular pipeline facility,
or whether to evaluate and update current safety regulations or to issue new ones.
” 3 This is correct in the sense that neglecting
Accordingly, having reviewed the record and considered the assessment criteria, I assess
Respondent a civil penalty of $10,000 for violation of 49 C.F.R. § 195.54(a).
Payment of the civil penalty must be made within 20 days of service of this Final Order.
Payment may be made by sending a certified check or money order (containing the CPF Number
for this case), made payable to “U.S. Department of Transportation,” to the Federal Aviation
Administration, Mike Monroney Aeronautical Center, Financial Operations Division (AMZ-
341), P.O. Box 269039, Oklahoma City, Oklahoma 73125. Federal regulations (49 C.F.R.
§ 89.21(b)(3)) also permit payment to be made by wire transfer through the Federal Reserve
Communications System (Fedwire), to the account of the U.S. Treasury. Detailed instructions
are contained in the enclosure. Questions concerning wire transfers should be directed to:
Financial Operations Division (AMZ-341), Federal Aviation Administration, Mike Monroney
Aeronautical Center, P.O. Box 269039, Oklahoma City, Oklahoma 73125. The Financial
Operations Division telephone number is (405) 954-8893.
Failure to pay the $10,000 civil penalty will result in accrual of interest at the current annual rate
in accordance with 31 U.S.C. § 3717, 31 C.F.R. § 901.9 and 49 C.F.R. § 89.23. Pursuant to
those same authorities, a late penalty charge of six percent (6%) per annum will be charged if
payment is not made within 110 days of service. Furthermore, failure to pay the civil penalty
may result in referral of the matter to the Attorney General for appropriate action in a district
court of the United States.
WARNING ITEM
With respect to Item 1, the Notice alleged a probable violation of Part 195 specifically
considered to be a warning item. The warning was for:
49 C.F.R. § 195.52(a) (Item 1) ─ Respondent’s alleged failure to report, at the
earliest practicable moment following discovery, a release of hazardous liquid
transported resulting in an event described on §195.50. Plains never gave
3 Response, at 1.



4
telephonic notice of this release, even though it later determined, shortly after
September 12, 2010, that the release met the definition under § 195.50(e). Plains
explained that it initially estimated that property damage from the failure did not
exceed $50,000. However, Plains ultimately determined that the weld on the tank
for the roof drain valve failed due to a full penetration crack, resulting in damage
greater than $50,000.
Plains presented information in its Response showing that it had taken certain actions to address
the cited item. If OPS finds a violation of this provision in a subsequent inspection, Respondent
may be subject to future enforcement action.
Under 49 C.F.R. § 190.215, Respondent has the right to submit a Petition for Reconsideration of
this Final Order. The petition must be sent to: Associate Administrator, Office of Pipeline
Safety, PHMSA, 1200 New Jersey Avenue, SE, East Building, 2nd Floor, Washington, DC
20590, with a copy sent to the Office of Chief Counsel, PHMSA, at the same address. PHMSA
will accept petitions received no later than 20 days after receipt of service of the Final Order by
the Respondent, provided they contain a brief statement of the issue(s) and meet all other
requirements of 49 C.F.R. § 190.215. The filing of a petition automatically stays the payment of
any civil penalty assessed but does not stay any other provisions of the Final Order, including
any required corrective actions. If Respondent submits payment of the civil penalty, the Final
Order becomes the final administrative decision and the right to petition for reconsideration is
waived.
The terms and conditions of this Final Order are effective upon service in accordance with 49
C.F.R. § 190.5.
___________________________________ __________________________
Jeffrey D. Wiese Date Issued
Associate Administrator
for Pipeline Safety
- **truncated:** false