# TENNESSEE GAS PIPELINE COMPANY — Notice of Amendment

- **operation:** document
- **citation:** CPF 420121006M
- **title:** TENNESSEE GAS PIPELINE COMPANY — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2012-04-25
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 192.225, 192.605(b)(6), 192.615(a)(3), 192.615(a)(4).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-420121006m.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-420121006m.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-420121006m
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/420121006M
**body:**

Notice of Amendment involving TENNESSEE GAS PIPELINE COMPANY. PHMSA's enforcement data identifies the cited regulations as 192.225,  192.605(b)(6),  192.615(a)(3),  192.615(a)(4). The case was opened on 2012-04-25 and is reported as closed as of 2012-10-24. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

420121006M_Closure_10242012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420121006M/420121006M_Closure_10242012.pdf

420121006M_Closure_10242012_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420121006M/420121006M_Closure_10242012_text.pdf

420121006M_NOA_04252012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420121006M/420121006M_NOA_04252012.pdf

420121006M_NOA_04252012_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420121006M/420121006M_NOA_04252012_text.pdf

420121006M_Operator Response to NOA_08312012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420121006M/420121006M_Operator%20Response%20to%20NOA_08312012.pdf

420121006M_Closure_10242012_text.pdf

CERTIFIED MAIL - RETURN RECEIPT REQUESTED
October 24, 2012
Mr. Dwayne Burton
Vice President, Engineering and Operations
Kinder Morgan Inc.
500 Dallas Street, Suite 1000
Houston, TX 77002
CPF 4-2012-1006M
Dear Mr. Burton:
On April 25, 2012, the Pipeline and Hazardous Materials Safety Administration (PHMSA)
issued to Tennessee Gas Pipeline L.L.C. (TGP) a Notice of Amendment in the above-referenced
case. TGP is now part of Kinder Morgan. Based on our review of the documentation you
provided, it has been determined that you have complied with the terms of this Notice.
Accordingly, this case is now closed and no further action is contemplated with respect to the
matters involved in this case. Thank you for your cooperation in this matter.
Sincerely,
R. M. Seeley
Director, Southwest Region
Pipeline and Hazardous
Materials Safety Administration
- **truncated:** false
- **body characters:** 1941
