{"operation":"document","citation":"CPF 420125029M","title":"ONEOK NGL PIPELINE, LLC — Notice of Amendment","source_type":"enforcement","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2012-09-12","effective_on":null,"summary":"CLOSED notice of amendment citing 195.402(a), 195.402(d)(5), 195.442(a), 195.446(b), 195.452(c)(1)(i)(a), 195.452(h)(2).","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-enforcement-420125029m.json","markdown":"https://regulus.evalyn.ai/document/phmsa-enforcement-420125029m.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-enforcement-420125029m","source_url":"https://primis.phmsa.dot.gov/enforcement-data/case/420125029M","body":"Notice of Amendment involving ONEOK NGL PIPELINE, LLC. PHMSA's enforcement data identifies the cited regulations as 195.402(a),  195.402(d)(5),  195.442(a),  195.446(b),  195.452(c)(1)(i)(a),  195.452(h)(2). The case was opened on 2012-09-12 and is reported as closed as of 2013-01-23. Open the official case record for notices, responses, orders, and the latest status.\n\nOfficial case documents:\n\n420125029M_Closure_ 01232013_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420125029M/420125029M_Closure_%2001232013_text.pdf\n\n420125029M_Closure_01232013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420125029M/420125029M_Closure_01232013.pdf\n\n420125029M_NOA_09122012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420125029M/420125029M_NOA_09122012.pdf\n\n420125029M_NOA_09122012_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420125029M/420125029M_NOA_09122012_text.pdf\n\n420125029M_Operator Response and Request for Time Extension_09282012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420125029M/420125029M_Operator%20Response%20and%20Request%20for%20Time%20Extension_09282012.pdf\n\n420125029M_Closure_ 01232013_text.pdf\n\nCERTIFIED MAIL - RETURN RECEIPT REQUESTED\nJanuary 23, 2013\nMr. Wes Christensen\nSenior Vice President, NGL Operations\nONEOK Partners, NGL Pipeline L.P.\n100 West Fifth Street\nTulsa, OK 74102\nCPF 4-2012-5029M\nDear Mr. Christensen:\nOn September 2011 through January 2012, a representative of the Pipeline and Hazardous\nMaterials Safety Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code\ninspected ONEOK Partners, L.P. (ONEOK) Operations and Maintenance Plan procedures in\nTulsa and Medford, OK. As a result of the inspection, ONEOK was issued a Notice of\nAmendment on September 11, 2012, which proposed amendments to your procedures.\nONEOK submitted its amended procedures on November 16, 2012. My staff reviewed the\namended procedures, and it appears that the inadequacies outlined in this Notice of Amendment\nhave been corrected.\nThis letter is to inform you that no further action is necessary and this case is now closed. Thank\nyou for your cooperation.\nSincerely,\nR. M. Seeley\nDirector, Southwest region\nPipeline and Hazardous Materials Safety Administration\n\n420125029M_Closure_01232013.pdf\n\nu.s. Department\nof Transportation\nPipeline and\nHazardous Materials Safety\nAdministration\n8701 South Gessner, Suite 111 0\nHouston, TX 77074\nCERTIFIED MAIL- RETURN RECEIPT REQUESTED\nJanuary 23, 2013\nMr. Wes Christensen\nSenior Vice President, NGL Operations\nONEOK Partners, NGL Pipeline L.P.\n100 West Fifth Street\nTulsa, OK 74102\nCPF 4-2012-5029M\nDear Mr. Christensen:\nOn September 2011 through January 2012, a representative of the Pipeline and Hazardous\nMaterials Safety Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code\ninspected ONEOK Partners, L.P. (ONEOK) Operations and Maintenance Plan procedures in\nTulsa and Medford, OK. As a result of the inspection, ONEOK was issued a Notice of\nAmendment on September 11, 2012, which proposed amendments to your procedures.\nONEOK submitted its amended procedures on November 16, 2012. My staff reviewed the\namended procedures, and it appears that the inadequacies outlined in this Notice of Amendment\nhave been corrected.\nThis letter is to inform you that no further action is necessary and this case is now closed. Thank\nyou for your cooperation.\nSincerely,\nR. M. Seeley\nDirector, Southwest region\nPipeline and Hazardous Materials Safety Administration","truncated":false,"body_characters":3512}