# ONEOK NGL PIPELINE, LLC — Notice of Amendment

- **operation:** document
- **citation:** CPF 420125029M
- **title:** ONEOK NGL PIPELINE, LLC — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2012-09-12
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 195.402(a), 195.402(d)(5), 195.442(a), 195.446(b), 195.452(c)(1)(i)(a), 195.452(h)(2).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-420125029m.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-420125029m.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-420125029m
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/420125029M
**body:**

Notice of Amendment involving ONEOK NGL PIPELINE, LLC. PHMSA's enforcement data identifies the cited regulations as 195.402(a),  195.402(d)(5),  195.442(a),  195.446(b),  195.452(c)(1)(i)(a),  195.452(h)(2). The case was opened on 2012-09-12 and is reported as closed as of 2013-01-23. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

420125029M_Closure_ 01232013_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420125029M/420125029M_Closure_%2001232013_text.pdf

420125029M_Closure_01232013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420125029M/420125029M_Closure_01232013.pdf

420125029M_NOA_09122012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420125029M/420125029M_NOA_09122012.pdf

420125029M_NOA_09122012_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420125029M/420125029M_NOA_09122012_text.pdf

420125029M_Operator Response and Request for Time Extension_09282012.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420125029M/420125029M_Operator%20Response%20and%20Request%20for%20Time%20Extension_09282012.pdf

420125029M_Closure_ 01232013_text.pdf

CERTIFIED MAIL - RETURN RECEIPT REQUESTED
January 23, 2013
Mr. Wes Christensen
Senior Vice President, NGL Operations
ONEOK Partners, NGL Pipeline L.P.
100 West Fifth Street
Tulsa, OK 74102
CPF 4-2012-5029M
Dear Mr. Christensen:
On September 2011 through January 2012, a representative of the Pipeline and Hazardous
Materials Safety Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code
inspected ONEOK Partners, L.P. (ONEOK) Operations and Maintenance Plan procedures in
Tulsa and Medford, OK. As a result of the inspection, ONEOK was issued a Notice of
Amendment on September 11, 2012, which proposed amendments to your procedures.
ONEOK submitted its amended procedures on November 16, 2012. My staff reviewed the
amended procedures, and it appears that the inadequacies outlined in this Notice of Amendment
have been corrected.
This letter is to inform you that no further action is necessary and this case is now closed. Thank
you for your cooperation.
Sincerely,
R. M. Seeley
Director, Southwest region
Pipeline and Hazardous Materials Safety Administration

420125029M_Closure_01232013.pdf

u.s. Department
of Transportation
Pipeline and
Hazardous Materials Safety
Administration
8701 South Gessner, Suite 111 0
Houston, TX 77074
CERTIFIED MAIL- RETURN RECEIPT REQUESTED
January 23, 2013
Mr. Wes Christensen
Senior Vice President, NGL Operations
ONEOK Partners, NGL Pipeline L.P.
100 West Fifth Street
Tulsa, OK 74102
CPF 4-2012-5029M
Dear Mr. Christensen:
On September 2011 through January 2012, a representative of the Pipeline and Hazardous
Materials Safety Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code
inspected ONEOK Partners, L.P. (ONEOK) Operations and Maintenance Plan procedures in
Tulsa and Medford, OK. As a result of the inspection, ONEOK was issued a Notice of
Amendment on September 11, 2012, which proposed amendments to your procedures.
ONEOK submitted its amended procedures on November 16, 2012. My staff reviewed the
amended procedures, and it appears that the inadequacies outlined in this Notice of Amendment
have been corrected.
This letter is to inform you that no further action is necessary and this case is now closed. Thank
you for your cooperation.
Sincerely,
R. M. Seeley
Director, Southwest region
Pipeline and Hazardous Materials Safety Administration