{"operation":"document","citation":"CPF 420131015M","title":"BBT MIDLA, LLC — Notice of Amendment","source_type":"enforcement","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2013-08-09","effective_on":null,"summary":"CLOSED notice of amendment citing 191.23(a)(8), 191.5(a), 192.227(a), 192.229(c)(2), 192.245(c), 192.465(a), 192.473, 192.477, 192.491(c), 192.605(a), 192.605(b)(11), 192.605(b)(12), 192.605(b)(2), 192.605(b)(7), 192.605(c)(1), 192.615(a)(3), 192.615(a)(6), 192.615(b)(3), 192.707(d)(2).","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-enforcement-420131015m.json","markdown":"https://regulus.evalyn.ai/document/phmsa-enforcement-420131015m.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-enforcement-420131015m","source_url":"https://primis.phmsa.dot.gov/enforcement-data/case/420131015M","body":"Notice of Amendment involving BBT MIDLA, LLC. PHMSA's enforcement data identifies the cited regulations as 191.23(a)(8),  191.5(a),  192.227(a),  192.229(c)(2),  192.245(c),  192.465(a),  192.473,  192.477,  192.491(c),  192.605(a),  192.605(b)(11),  192.605(b)(12),  192.605(b)(2),  192.605(b)(7),  192.605(c)(1),  192.615(a)(3),  192.615(a)(6),  192.615(b)(3),  192.707(d)(2). The case was opened on 2013-08-09 and is reported as closed as of 2014-02-03. Open the official case record for notices, responses, orders, and the latest status.\n\nOfficial case documents:\n\n420131015M_Closure_02032014.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420131015M/420131015M_Closure_02032014.pdf\n\n420131015M_Closure_02032014_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420131015M/420131015M_Closure_02032014_text.pdf\n\n420131015M_NOA_08092013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420131015M/420131015M_NOA_08092013.pdf\n\n420131015M_NOA_08092013_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420131015M/420131015M_NOA_08092013_text.pdf\n\n420131015M_Operator Response to the NOA_08222013.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420131015M/420131015M_Operator%20Response%20to%20the%20NOA_08222013.pdf\n\n420131015M_Closure_02032014_text.pdf\n\nCERTIFIED MAIL - RETURN RECEIPT REQUESTED\nFebruary 3, 2014\nMr. John Connor\nSenior V.P. Operations & Engineering\nAmerican Midstream, LLC\n1614 15th Street, Suite 300\nDenver, CO 80202\nCPF 4-2013-1015M\nDear Mr. Connor:\nOn September 24, 2012 through December 21, 2012, a representative of the Pipeline and\nHazardous Materials Safety Administration (PHMSA) pursuant to Chapter 601 of 49 United\nStates Code inspected American Midstream LLC’s Operations and Maintenance Plan procedures\nin Fairbanks, LA. As a result of the inspection, American Midstream was issued a Notice of\nAmendment on August 9, 2013, which proposed amendments to your procedures.\nAmerican Midstream submitted amended procedures on August 22, 2013 and November 1,\n2013. My staff reviewed the amended procedures, and it appears that the inadequacies outlined\nin this Notice of Amendment have been corrected.\nThis letter is to inform you that no further action is necessary and this case is now closed. Thank\nyou for your cooperation.\nSincerely,\nR. M. Seeley\nDirector, Southwest region\nPipeline and Hazardous Materials Safety Administration","truncated":false,"body_characters":2402}