{"operation":"document","citation":"CPF 420141013M","title":"CADEVILLE GAS STORAGE, LLC — Notice of Amendment","source_type":"enforcement","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2014-12-10","effective_on":null,"summary":"CLOSED notice of amendment citing 192.631(a)(1), 192.631(c)(2), 192.631(c)(5).","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-enforcement-420141013m.json","markdown":"https://regulus.evalyn.ai/document/phmsa-enforcement-420141013m.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-enforcement-420141013m","source_url":"https://primis.phmsa.dot.gov/enforcement-data/case/420141013M","body":"Notice of Amendment involving CADEVILLE GAS STORAGE, LLC. PHMSA's enforcement data identifies the cited regulations as 192.631(a)(1),  192.631(c)(2),  192.631(c)(5). The case was opened on 2014-12-10 and is reported as closed as of 2015-03-10. Open the official case record for notices, responses, orders, and the latest status.\n\nOfficial case documents:\n\n420141013M_Closure _03102015_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420141013M/420141013M_Closure%20_03102015_text.pdf\n\n420141013M_Closure_03102015.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420141013M/420141013M_Closure_03102015.pdf\n\n420141013M_NOA_12102014.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420141013M/420141013M_NOA_12102014.pdf\n\n420141013M_NOA_12102014_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420141013M/420141013M_NOA_12102014_text.pdf\n\n420141013M_Operator Response to Notice_02202015.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420141013M/420141013M_Operator%20Response%20to%20Notice_02202015.pdf\n\n420141013M_Closure_03102015.pdf\n\nu.s. Department\nof Transportation\nPipeline and\nHazardous Materials Safety\nAdministration\nCERTIFIED MAIL- RETURN RECEIPT REQUESTED\n8701 South Gessner, Suite 1110\nHouston, TX 77074\nMarch 10, 2015\nMr. Robert B Raines Jr.\nSenior Vice President\nCardinal Gas Storage Partners, LLC\n3 Riverway, Suite 1350\nHouston, TX 77056\nCPF No. 4-2014-1013M\nDear Mr. Raines:\nDuring the month of April through May 2014, a representative of the Pipeline and Hazardous\nMaterials Safety Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code\ninspected Cardinal Gas Storage Partners (''Cardinal\") procedures, records, and pipeline facilities\nin Cadeville Gas Storage, West Monroe and Perryville Gas Storage, Winnsboro, Louisiana\noperating areas pursuant to Chapter 601 of 49 United States Code.\nAs a result of these inspections, a Notice of Amendment, CPF 4-2014-1013M, was issued on\nDecember 10, 2014 to Cardinal Gas Storage Partners (\"Cardinal\"). On February 24, 2015,\nCardinal responded to the NOA.\nMy staff reviewed amended procedure, and the inadequacies outlined m this Notice of\nAmendment have been corrected.\nThis letter is to inform you no further action is necessary and this case is now closed. Thank you\nfor your cooperation.\nSincerely,\nv&~/\nR. M. Seeley\nDirector, Southwest Region\nPipeline and Hazardous\nMaterials Safety Administration\n\n420141013M_Closure _03102015_text.pdf\n\nCERTIFIED MAIL - RETURN RECEIPT REQUESTED\nMarch 10, 2015\nMr. Robert B Raines Jr.\nSenior Vice President\nCardinal Gas Storage Partners, LLC\n3 Riverway, Suite 1350\nHouston, TX 77056\nCPF No. 4-2014-1013M\nDear Mr. Raines:\nDuring the month of April through May 2014, a representative of the Pipeline and Hazardous\nMaterials Safety Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code\ninspected Cardinal Gas Storage Partners (\"Cardinal\") procedures, records, and pipeline facilities\nin Cadeville Gas Storage, West Monroe and Perryville Gas Storage, Winnsboro, Louisiana\noperating areas pursuant to Chapter 601 of 49 United States Code.\nAs a result of these inspections, a Notice of Amendment, CPF 4-2014-1013M, was issued on\nDecember 10, 2014 to Cardinal Gas Storage Partners (\"Cardinal\"). On February 24, 2015,\nCardinal responded to the NOA.\nMy staff reviewed amended procedure, and the inadequacies outlined in this Notice of\nAmendment have been corrected.\nThis letter is to inform you no further action is necessary and this case is now closed. Thank you\nfor your cooperation.\nSincerely,\nR. M. Seeley\nDirector, Southwest Region\nPipeline and Hazardous\nMaterials Safety Administration","truncated":false,"body_characters":3660}