# TC OIL PIPELINE OPERATIONS INC — Notice of Probable Violation

- **operation:** document
- **citation:** CPF 420145016
- **title:** TC OIL PIPELINE OPERATIONS INC — Notice of Probable Violation
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2014-06-26
- **effective on:** Not available
- **summary:** CLOSED notice of probable violation citing 195.202.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-420145016.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-420145016.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-420145016
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/420145016
**body:**

Notice of Probable Violation involving TC OIL PIPELINE OPERATIONS INC. PHMSA's enforcement data identifies the cited regulation as 195.202. The case was opened on 2014-06-26 and is reported as closed as of 2016-04-27. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

420145016_Final Order_04272016.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420145016/420145016_Final%20Order_04272016.pdf

420145016_Final Order_04272016_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420145016/420145016_Final%20Order_04272016_text.pdf

420145016_NOPV PCO_06262014.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420145016/420145016_NOPV%20PCO_06262014.pdf

420145016_NOPV PCO_06262014_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420145016/420145016_NOPV%20PCO_06262014_text.pdf

420145016_Operator Response to Notice_07302014.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420145016/420145016_Operator%20Response%20to%20Notice_07302014.pdf

420145016_Final Order_04272016_text.pdf

April 27, 2016
Mr. Vern Meier
President
TC Oil Pipeline Operations Inc.
700 Louisiana Street
Suite 700
Houston, TX 77002-2700
Re: CPF No. 4-2014-5016
Dear Mr. Meier:
Enclosed please find the Final Order issued in the above-referenced case. It withdraws the
Notice of Probable Violation that was issued on June 26, 2014. This case is now closed. Service
of the Final Order is made pursuant to 49 C.F.R. § 190.5.
Thank you for your cooperation in this matter.
Sincerely,
Jeffrey D. Wiese
Associate Administrator
for Pipeline Safety
Enclosure
cc: Mr. Rod Seeley, Director, Southwest Region, OPS
Mr. Ken Crowl, Director, Regulatory Compliance, Pipeline Safety & Compliance
TransCanada Corporation, TC Oil PipeLine Operation Inc., 700 Louisiana Street,
Suite 700, Houston, TX 77002
CERTIFIED MAIL - RETURN RECEIPT REQUESTED



U.S. DEPARTMENT OF TRANSPORTATION
PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION
OFFICE OF PIPELINE SAFETY
WASHINGTON, D.C. 20590
)
In the Matter of )
)
TC Oil Pipeline Operations Inc., ) CPF No. 4-2014-5016
)
Respondent. )
)
FINAL ORDER
On April 8-11, 2014, pursuant to 49 U.S.C. § 60117, a representative of the Pipeline and
Hazardous Materials Safety Administration (PHMSA), Office of Pipeline Safety (OPS),
conducted an inspection of the Houston Lateral pipeline construction project of TC Oil Pipeline
Operations Inc. (TC Oil or Respondent) near Mont Belvieu, Texas.1
As a result of the inspection, the Director, Southwest Region, OPS (Director) issued a Notice of
Probable Violation and Proposed Compliance Order on June 26, 2014 (Notice). In accordance
with 49 C.F.R. § 190.207, the Notice alleged that Respondent committed a violation of the
hazardous liquid pipeline safety standards and proposed certain corrective action be taken.
TC Oil responded by requesting a hearing on July 30, 2014, and by submitting additional written
materials on October 6, 2014. In accordance with 49 C.F.R. § 190.211, a hearing was held by
telephone conference on October 15, 2014, before a Presiding Official from the Office of Chief
Counsel, PHMSA. After the hearing, TC Oil submitted written materials on November 13,
2014, and July 10, 2015. Pursuant to § 190.209(b)(7), the Director submitted a written
evaluation of Respondent’s response material on May 28, 2015.
WITHDRAWAL OF ALLEGATION
The Notice alleged that Respondent committed a violation of the pipeline safety standards in
49 C.F.R. Part 195, as follows:
1 TC Oil is a subsidiary of TransCanada PipeLines Limited, operating approximately 1,900 miles of pipeline
transporting crude oil from the US-Canada border in North Dakota to locations in Illinois and Texas, as reported by
TC Oil for calendar year 2014 pursuant to § 195.49.



CPF No. 4-2014-5016
Page 2
Item 1 in the Notice alleged that Respondent violated 49 C.F.R. § 195.202, which states:
§ 195.202 Compliance with specifications or standards.
Each pipeline system must be constructed in accordance with
comprehensive written specifications or standards that are consistent with
the requirements of this part.
The Notice alleged that Respondent violated § 195.202 by failing to construct its pipeline system
in accordance with written procedures consistent with the safety regulations in 49 C.F.R. Part
195. Specifically, the Notice alleged that Respondent’s written procedures for bending pipe
were inadequate because they failed to mention the type of pipe actually being bent during
construction, known as spiral weld seam pipe. In addition, the Notice alleged that during the
inspection, OPS requested documentation about the suitability of bending spiral seam pipe using
the procedure, but TC Oil provided no documentation.
In its written submissions and at the hearing, Respondent contested the allegation in the Notice
and argued that its procedures complied with § 195.202. Respondent also argued its procedures
complied with § 195.212, a separate regulation that provides minimum standards for bending
pipe. Respondent explained that the procedures applied to all types of pipe and that it was not
necessary for the procedures to mention every type of pipe individually. Respondent noted that
the regulation for bending pipe also applies to all types of pipe without mentioning them
individually. The only seam type mentioned by name in § 195.212 is longitudinal seam pipe.2
Respondent argued further that its procedures were consistent with applicable industry
specifications, including ASME B31.4, Pipeline Transportation Systems for Liquid
Hydrocarbons and Other Liquids and B31.8, Gas Transmission and Distribution Piping Systems.
Respondent argued these standards do not mention specific types of pipe with respect to bending
other than providing additional precautions for longitudinal seams.
Finally, Respondent explained that it provided OPS with material test records showing the
transverse weld and bend test results for spiral seam pipe. TC Oil also provided a separate
written response regarding how its procedures address bending spiral seam pipe and described
other quality assurance measures.
At the hearing, OPS argued that during the inspection, the inspector was unable to determine if
TC Oil properly followed its procedures because the procedures were silent on the use of spiral
seam pipe. In addition, OPS argued that by not including the type of pipe, the inspector could
not determine if the procedures were compliant without additional investigation into the safety of
the procedure for the pipe. OPS also contested Respondent’s assertion that its procedures were
consistent with the cited industry standards.
2 Section 195.212(b)(3) states that when bending pipe with a longitudinal weld, the weld must be as near as
practicable to the neutral axis of the bend unless certain other conditions are met.



CPF No. 4-2014-5016
Page 3
Applicable Safety Standards
Safety regulations for hazardous liquid pipelines include minimum safety standards for
construction, which are set forth in 49 C.F.R. Part 195, Subpart D (§§ 195.200–195.266). Under
§ 195.202, operators must construct their pipelines in accordance with written procedures that
are consistent with the safety standards in Subpart D.
Construction standards for bending pipe are prescribed in § 195.212. These standards require
pipe bends to have a smooth contour and be free from buckling, cracks, or other mechanical
damage. The regulation prohibits wrinkle bends and any bends that would impair the
serviceability of the pipe.
Bending requirements in § 195.212 do not differentiate between different seam types, with one
exception. The regulation establishes additional requirements for longitudinal seam pipe
concerning the position of the weld in relation to the axis of the bend.
Analysis
PHMSA reviews the record to determine if a failure to identify spiral seam pipe rendered
Respondent’s procedures inconsistent with the requirements of Subpart D.
Section 10 of Respondent’s procedures provides specifications for bending pipe. The procedures
state that bends must conform to the centerline of the trench and must be performed with the
“cold smooth method” using an internal bending mandrel for smooth bends. Specifications are
provided for ambient temperatures, distance between a bend and end joints, and maximum
deflection. Provisions also require rejection of bends with damage to the pipe or coating and
when bends do not meet other criteria. Bends must be free from buckling, flattening, cracks or
other evidence of mechanical damage.
Respondent’s procedures are consistent with, and in some respects have more detail than the
minimum standards specified in § 195.212 for bending pipe. Neither §§ 195.202 nor 195.212
differentiate between how spiral seam pipe must be bent versus other types of seam welds. The
only exception in the regulation is for bending longitudinal seam pipe, which is not an issue
here.
3 All of the other bending requirements in the regulation are applicable regardless of weld
seam type. Therefore, not mentioning spiral seam pipe in Respondent’s procedures was not
inconsistent with the regulation.
Although OPS argued at the hearing that the procedures also failed to have additional details
about the bending process, that is an issue more appropriately addressed through a notice of
amendment.4 Under § 190.206, a notice of amendment may be issued when OPS believes an
operator’s procedures are “inadequate to assure safe operation.” Unlike a notice of probable
3 The Notice stated that Respondent’s procedures already specified in detail the manner in which to bend pipe
containing a longitudinal weld.
4 See, e.g., Enterprise Products Operating LLC, CPF No. 4-2013-5011, at 4, 2016 WL 1104436, at *3 (Feb. 4, 2016)
(withdrawing alleged violation but finding operator should clarify its procedures).



CPF No. 4-2014-5016
Page 4
violation, which was issued in this matter, a notice of amendment is not predicated on there
being a specific regulatory violation.
In this case, Respondent has demonstrated that its procedures were not in violation of the
regulation in the manner alleged by the Notice. Therefore the allegation of violation and
proposed compliance order are withdrawn.
The terms and conditions of this Final Order are effective upon service in accordance with
49 C.F.R. § 190.5.
_______________________________ _________________________
Jeffrey D. Wiese Date Issued
Associate Administrator
for Pipeline Safety