{"operation":"document","citation":"CPF 420145029M","title":"CENTURION PIPELINE L.P. — Notice of Amendment","source_type":"enforcement","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2014-11-10","effective_on":null,"summary":"CLOSED notice of amendment citing 195.432.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-enforcement-420145029m.json","markdown":"https://regulus.evalyn.ai/document/phmsa-enforcement-420145029m.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-enforcement-420145029m","source_url":"https://primis.phmsa.dot.gov/enforcement-data/case/420145029M","body":"Notice of Amendment involving CENTURION PIPELINE L.P.. PHMSA's enforcement data identifies the cited regulation as 195.432. The case was opened on 2014-11-10 and is reported as closed as of 2015-04-14. Open the official case record for notices, responses, orders, and the latest status.\n\nOfficial case documents:\n\n420145029M_Closure_04142015.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420145029M/420145029M_Closure_04142015.pdf\n\n420145029M_Closure_04142015_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420145029M/420145029M_Closure_04142015_text.pdf\n\n420145029M_NOA_11102014.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420145029M/420145029M_NOA_11102014.pdf\n\n420145029M_NOA_11102014_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420145029M/420145029M_NOA_11102014_text.pdf\n\n420145029M_Operator Response to Notice_12152014.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420145029M/420145029M_Operator%20Response%20to%20Notice_12152014.pdf\n\n420145029M_Closure_04142015_text.pdf\n\nCERTIFIED MAIL - RETURN RECEIPT REQUESTED\nApril 14, 2015\nMr. William Moyer\nPresident\nCenturion Pipeline, L.P.\n5 Greenway Plaza, Suite 110\nHouston, TX 77046\nCPF 4-2014-5029M\nDear Mr. Moyer:\nFrom April 2013 to February 2014, representatives of the Pipeline and Hazardous Materials\nSafety Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code inspected the\nCenturion Pipeline, L.P. (Centurion) procedures for Operations and Maintenance, and Integrity\nManagement Plan in Houston, TX. As a result of the inspection, Centurion was issued a Notice\nof Amendment on November 10, 2014, which proposed amendment of your procedures.\nCenturion submitted the requested procedural modification on December 15, 2014. The\nsubmittal was received in my office on December 16, 2014. My staff reviewed the amended\nprocedure, and the inadequacies outlined in this Notice of Amendment have been corrected.\nThis letter is to inform you no further action is necessary and this case is now closed. Thank you\nfor your cooperation.\nSincerely,\nR. M. Seeley\nDirector, Southwest Region\nPipeline and Hazardous Materials Safety Administration","truncated":false,"body_characters":2169}