# CENTURION PIPELINE L.P. — Notice of Amendment

- **operation:** document
- **citation:** CPF 420145029M
- **title:** CENTURION PIPELINE L.P. — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2014-11-10
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 195.432.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-420145029m.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-420145029m.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-420145029m
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/420145029M
**body:**

Notice of Amendment involving CENTURION PIPELINE L.P.. PHMSA's enforcement data identifies the cited regulation as 195.432. The case was opened on 2014-11-10 and is reported as closed as of 2015-04-14. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

420145029M_Closure_04142015.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420145029M/420145029M_Closure_04142015.pdf

420145029M_Closure_04142015_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420145029M/420145029M_Closure_04142015_text.pdf

420145029M_NOA_11102014.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420145029M/420145029M_NOA_11102014.pdf

420145029M_NOA_11102014_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420145029M/420145029M_NOA_11102014_text.pdf

420145029M_Operator Response to Notice_12152014.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420145029M/420145029M_Operator%20Response%20to%20Notice_12152014.pdf

420145029M_Closure_04142015_text.pdf

CERTIFIED MAIL - RETURN RECEIPT REQUESTED
April 14, 2015
Mr. William Moyer
President
Centurion Pipeline, L.P.
5 Greenway Plaza, Suite 110
Houston, TX 77046
CPF 4-2014-5029M
Dear Mr. Moyer:
From April 2013 to February 2014, representatives of the Pipeline and Hazardous Materials
Safety Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code inspected the
Centurion Pipeline, L.P. (Centurion) procedures for Operations and Maintenance, and Integrity
Management Plan in Houston, TX. As a result of the inspection, Centurion was issued a Notice
of Amendment on November 10, 2014, which proposed amendment of your procedures.
Centurion submitted the requested procedural modification on December 15, 2014. The
submittal was received in my office on December 16, 2014. My staff reviewed the amended
procedure, and the inadequacies outlined in this Notice of Amendment have been corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank you
for your cooperation.
Sincerely,
R. M. Seeley
Director, Southwest Region
Pipeline and Hazardous Materials Safety Administration
- **truncated:** false
- **body characters:** 2169
