# ANR PIPELINE CO — Notice of Amendment

- **operation:** document
- **citation:** CPF 420151005M
- **title:** ANR PIPELINE CO — Notice of Amendment
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2015-04-16
- **effective on:** Not available
- **summary:** CLOSED notice of amendment citing 192.631(b)(4).
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-420151005m.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-420151005m.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-420151005m
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/420151005M
**body:**

Notice of Amendment involving ANR PIPELINE CO. PHMSA's enforcement data identifies the cited regulation as 192.631(b)(4). The case was opened on 2015-04-16 and is reported as closed as of 2015-06-15. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

420151005M_Closure_06152015.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420151005M/420151005M_Closure_06152015.pdf

420151005M_Closure_06152015_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420151005M/420151005M_Closure_06152015_text.pdf

420151005M_NOA_04162015.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420151005M/420151005M_NOA_04162015.pdf

420151005M_NOA_04162015_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420151005M/420151005M_NOA_04162015_text.pdf

420151005M_Operator Response to Notice_05202015.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420151005M/420151005M_Operator%20Response%20to%20Notice_05202015.pdf

420151005M_Closure_06152015_text.pdf

CERTIFIED MAIL - RETURN RECEIPT REQUESTED
June 15, 2015
Mr. Vern Meier
Vice President Field Operations
ANR Pipeline Company
717 Texas Avenue
Houston, TX 77002
CPF 4-2015-1005M
Dear Mr. Meier:
On December 15 – 17, 2014, a representative of the Pipeline and Hazardous Materials Safety
Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code inspected ANR
Pipeline Company procedures for Control Room Management in Houston, TX. As a result of
the inspection, ANR was issued a Notice of Amendment on April 16, 2015, which proposed
amendment of your procedures.
ANR submitted the requested procedural modifications on May 20, 2015. My staff reviewed the
amended procedures, and it appears that the inadequacies outlined in this Notice of Amendment
have been corrected.
This letter is to inform you no further action is necessary and this case is now closed. Thank you
for your cooperation.
Sincerely,
R. M. Seeley
Director, Southwest Region
Pipeline and Hazardous Materials Safety Administration
- **truncated:** false
- **body characters:** 2046
