{"operation":"document","citation":"CPF 420151008M","title":"BBT MIDLA, LLC — Notice of Amendment","source_type":"enforcement","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2015-04-20","effective_on":null,"summary":"CLOSED notice of amendment citing 192.631(a)(1), 192.631(a)(2), 192.631(b), 192.631(c), 192.631(d), 192.631(e), 192.631(g), 192.631(h), 192.631(i), 192.631(j).","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-enforcement-420151008m.json","markdown":"https://regulus.evalyn.ai/document/phmsa-enforcement-420151008m.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-enforcement-420151008m","source_url":"https://primis.phmsa.dot.gov/enforcement-data/case/420151008M","body":"Notice of Amendment involving BBT MIDLA, LLC. PHMSA's enforcement data identifies the cited regulations as 192.631(a)(1),  192.631(a)(2),  192.631(b),  192.631(c),  192.631(d),  192.631(e),  192.631(g),  192.631(h),  192.631(i),  192.631(j). The case was opened on 2015-04-20 and is reported as closed as of 2016-02-19. Open the official case record for notices, responses, orders, and the latest status.\n\nOfficial case documents:\n\n420151008M_Closure Letter_02192016.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420151008M/420151008M_Closure%20Letter_02192016.pdf\n\n420151008M_Closure Letter_02192016_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420151008M/420151008M_Closure%20Letter_02192016_text.pdf\n\n420151008M_NOA_04202015.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420151008M/420151008M_NOA_04202015.pdf\n\n420151008M_NOA_04202015_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420151008M/420151008M_NOA_04202015_text.pdf\n\n420151008M_Operator Response to Notice and Request for Time Extension_05202015.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420151008M/420151008M_Operator%20Response%20to%20Notice%20and%20Request%20for%20Time%20Extension_05202015.pdf\n\n420151008M_Closure Letter_02192016_text.pdf\n\nCERTIFIED MAIL - RETURN RECEIPT REQUESTED\nFebruary 19, 2016\nMr. Steve Bergstrom\nExecutive Chairman, President and Chief Executive Officer\nAmerican Midstream Partners LP\n1400 16th Street, Suite 310,\nDenver, CO 80202\nCPF 4-2015-1008M\nDear Mr. Bergstrom:\nFrom June 16-23, 2014, a representative of the Pipeline and Hazardous Materials Safety\nAdministration (PHMSA) pursuant to Chapter 601 of 49 United States Code inspected your\nprocedures and records for Control Room Management Program in Houston, TX. As a result of the\ninspection, American Midstream was issued a Notice of Amendment on April 20, 2015, which\nproposed amendment of your procedures.\nAmerican Midstream submitted the requested procedural modification on June 26, 2015. My staff\nreviewed the amended procedure, and the inadequacies outlined in this Notice of Amendment have\nbeen corrected.\nThis letter is to inform you that no further action is necessary and this case is now closed. Thank you\nfor your cooperation.\nSincerely,\nR. M. Seeley\nDirector, Southwest Region\nPipeline and Hazardous Materials Safety Administration","truncated":false,"body_characters":2355}