# ENABLE GAS TRANSMISSION, LLC — Warning Letter

- **operation:** document
- **citation:** CPF 420155004W
- **title:** ENABLE GAS TRANSMISSION, LLC — Warning Letter
- **source type:** enforcement
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2015-02-23
- **effective on:** Not available
- **summary:** CLOSED warning letter citing 195.230, 195.561.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-enforcement-420155004w.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-enforcement-420155004w.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-enforcement-420155004w
- **source url:** https://primis.phmsa.dot.gov/enforcement-data/case/420155004W
**body:**

Warning Letter involving ENABLE GAS TRANSMISSION, LLC. PHMSA's enforcement data identifies the cited regulations as 195.230,  195.561. The case was opened on 2015-02-23 and is reported as closed as of 2015-02-23. Open the official case record for notices, responses, orders, and the latest status.

Official case documents:

420155004W_Warning_02232015.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420155004W/420155004W_Warning_02232015.pdf

420155004W_Warning_02232015_text.pdf: https://primis.phmsa.dot.gov/enforcement-documents/420155004W/420155004W_Warning_02232015_text.pdf

420155004W_Warning_02232015_text.pdf

WARNING LETTER
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
February 23, 2015
Mr. Pete Kirsch
Vice President Operations and Engineering
Enable Gas Transmission, LLC
1111 Louisiana Street
Houston, TX 77002
CPF 4-2015-50004W
Dear Mr. Kirsch:
On multiple occasions between Dec. 15, 2014 and Feb. 6, 2015, representatives of the Pipeline
and Hazardous Materials Safety Administration (PHMSA) pursuant to Chapter 601 of 49 United
States Code were onsite and inspected your Enable Gas Transmission LLC (Enable, the
Operator) pipeline construction project in Arkansas. This construction project is still ongoing.
As a result of the inspection, it appears that you have committed probable violations of the
Pipeline Safety Regulations, Title 49, Code of Federal Regulations. The items inspected and the
probable violation(s) are:
1. §195.230 Welds: Repair or removal of defects
(a) Each weld that is unacceptable under §195.228 must be removed or repaired.
Except for welds on an offshore pipeline being installed from a pipe lay vessel, a
weld must be removed if it has a crack that is more than 8 percent of the weld
length.
(b) Each weld that is repaired must have the defect removed down to sound metal and
the segment to be repaired must be preheated if conditions exist which would



adversely affect the quality of the weld repair. After repair, the segment of the
weld that was repaired must be inspected to ensure its acceptability.
(b) Repair of a crack, or of any defect in a previously repaired area must be in
accordance with written weld repair procedures that have been qualified under
§195.214. Repair procedures must provide that the minimum mechanical
properties specified for the welding procedure used to make the original weld are
met upon completion of the final weld repair.
Enable failed to repair a branch weld made on the BT-39 12-inch pipeline construction near
Little Rock, AR that should not have passed visual examination. A visual examination would
show that this weld had poor fit-up, excessive weld reinforcement and weld passes were not
made according to the qualified welding procedure.
2. §195.561 When must I inspect pipe coating used for external corrosion control?
(a) You must inspect all external pipe coating required by Sec. 195.557 just prior to
lowering the pipe into the ditch or submerging the pipe.
(b) You must repair any coating damage discovered.
Enable failed to completely repair, by removal and re-application, coating damaged by pre-
heating the pipe in preparation for application of the field joint coating. Enable did not
completely remove the factory applied FBE coating adjacent to the cutback that was damaged
when inductively heating the pipe. The pipe was being heated inductively in preparation for the
application of the 3M Skotchkote 6233 FBE coating being used to coat the field joints. The
application procedures for this coating require that the pipe be pre-heated to a temperature of
425o F to 488o F, not to exceed 500o F, prior to application. Visual examination of the coating
adjacent to the field joints showed blistering and flaking, indicating that it was damaged by the
heating process. Failure to completely remove the blistered, flaking coating adjacent to the field
joint prior to application of the coating may prevent complete bonding of the coating to the
surface of the pipe, may result in shielding of the cathodic protection current, and allow the onset
of corrosion. Enable has since changed the field joint coating to SCP SP-2888, a two-part epoxy
that does not require the pipe to be heated to high temperatures prior to application. However,
PHMSA remains concerned that the coating applied by the previous process over damaged
coating adjacent to the field joint may result in corrosion in the area of the field joints.
Under 49 United States Code, § 60122, you are subject to a civil penalty not to exceed $200,000
per violation per day the violation persists up to a maximum of $2,000,000 for a related series of
violations. For violations occurring prior to January 4, 2012, the maximum penalty may not
exceed $100,000 per violation per day, with a maximum penalty not to exceed $1,000,000 for a
related series of violations. We have reviewed the circumstances and supporting documents
involved in this case, and have decided not to conduct additional enforcement action or penalty
2



assessment proceedings at this time. We advise you to correct the item(s) identified in this letter.
Failure to do so will result in Enable being subject to additional enforcement action.
No reply to this letter is required. If you choose to reply, in your correspondence please refer to
CPF 4-2015-5004W. Be advised that all material you submit in response to this enforcement
action is subject to being made publicly available. If you believe that any portion of your
responsive material qualifies for confidential treatment under 5 U.S.C. 552(b), along with the
complete original document you must provide a second copy of the document with the portions
you believe qualify for confidential treatment redacted and an explanation of why you believe
the redacted information qualifies for confidential treatment under 5 U.S.C. 552(b).
Sincerely,
R. M. Seeley
Director, Southwest Region
Pipeline and Hazardous Materials Safety Administration
3
- **truncated:** false
- **body characters:** 5944